Leak report Start: 19.08.2021 End: 19.08.

2021 Duration: 1 day(s)

Contact details: Customer: Auditor:

Company: SUPER SMELTERS LTD

Jamuria Ind.Estate,P.O.Ikra,Jamuria, 713


Address:
362 Burdwan

Contact person: ANUP Saxena sir

Email: anoop.saxena@supershakti.in

Phone: +913412456690

logo:

Project master data

Import date 19.08.2021 CO2 emissions: 0.527 kg/kWh

Cost calculation basis: Specific power: 0.12 kWh / m³

Compressed air costs 150 inr / 1000 m³ Electricity price: inr / kWh

Annual working hours: 8760 h

Result: Improvements: Percentage:

No. of leakages: 5 No. of leakages fixed: 0 0 %

Total leakage rate: 260.981 ltr/min Reduced leakage rate: 0 ltr/min 0 %

Total costs per Year: 20,575.69 inr Reduced costs per Year: 0 inr

Total CO2 emissions per Year: 8.68 tons Reduced CO2 emissions per Year: 0 tons

Measuring technology for compressed air and gases - www.cs-instruments.com page 1 of 4


LeakTag: 8
Building - Place: pgp - id fan 2 outlt pipe Leak repair under pressure? No
Date Time: 19.08.2021 10:30:27 Failure:
Leakage rate: 2.02 ltr/min Spare part:
Costs per Year: 159.22 inr Measure:
Total CO2 emissions per
0.07 tons Note:
Year:
Priority: Status:
Comment: solved at:
solved by:

LeakTag: 9
Building - Place: pgp - hose pip3 Leak repair under pressure? No
Date Time: 19.08.2021 10:32:16 Failure:
Leakage rate: > 124 ltr/min Spare part:
Costs per Year: > 9,776.16 inr Measure:
Total CO2 emissions per
4.12 tons Note:
Year:
Priority: Status:
Comment: solved at:
solved by:

LeakTag: 10
Building - Place: pgp - MAB AIR LINE ND VALVE 1 Leak repair under pressure? No
Date Time: 19.08.2021 10:38:38 Failure:
Leakage rate: 19.533 ltr/min Spare part:
Costs per Year: 1,540.01 inr Measure:
Total CO2 emissions per
0.65 tons Note:
Year:
Priority: Status:
Comment: solved at:
solved by:

Measuring technology for compressed air and gases - www.cs-instruments.com page 2 of 4


LeakTag: 14
Building - Place: pgp - instrument air line Leak repair under pressure? No
Date Time: 19.08.2021 10:54:42 Failure:
Leakage rate: 96.165 ltr/min Spare part:
Costs per Year: 7,581.63 inr Measure:
Total CO2 emissions per
3.2 tons Note:
Year:
Priority: Status:
Comment: solved at:
solved by:

LeakTag: 18
Building - Place: pgp - N2 TANK OL LINE NEAR PG Leak repair under pressure? No
Date Time: 19.08.2021 11:16:34 Failure:
Leakage rate: > 19.263 ltr/min Spare part:
Costs per Year: > 1,518.67 inr Measure:
Total CO2 emissions per
0.64 tons Note:
Year:
Priority: Status:
Comment: solved at:
solved by:

Measuring technology for compressed air and gases - www.cs-instruments.com page 3 of 4


Result: Improvements: Percentage:

No. of leakages: 5 No. of leakages fixed: 0 0 %

Total leakage rate: 260.981 ltr/min Reduced leakage rate: 0 ltr/min 0 %

Total costs per Year: 20,575.69 inr Reduced costs per Year: 0 inr

Total CO2 emissions per Year: 8.68 tons Reduced CO2 emissions per Year: 0 tons

Measuring technology for compressed air and gases - www.cs-instruments.com page 4 of 4