Plaster Startup Check list ‫ﺷﺮﻛﺔ اﻟﺨﻠﻴﺞ ﻟﻠﻤﻘﺎوﻻت‬

SL
N DAILY START UP PLASTER CHECK LIST ON SITE YES Remarks
O
1 BLOCK WORK COMPLETED, INSPECTED AND APPROVED 
2 MEP CLEARANCE AVAILABLE 
PLASTER ACCESSORIES INSTALLED/AVAILABLE FOR TODAY’S WORK
3 
AND AWARE HOW TO AND WHERE TO PLACE THEM
MIXING METHODOLOGY, APPLICATION OF APPROVED RUSH COAT
4 ON THE COMPLETED BLOCKWORK READY TO RECEIVE PLASTER 
AND CURING
BUTTON MARKS/PLASTER SPOTS (FOR THICKNESS) TO BE PROVIDED
5 WITH PROPER ALIGNMENT AND AREAS TO BE SOAKED WELL PRIOR 
TO START PLASTER.
TRAINED TEAM TO OPERATE SPRAY MACHINE UNDER SUPERVISION
6 
AND PROPER STORAGE.
MIXING METHODOLOGY, APPLICATION OF APPROVED PREMIX
7 
COAT FOR THE AREA READY TO RECEIVE PLASTER
IDENTIFY THE LOCATION OF PLASTER FINISH, FOR INTERNAL AREA
PLASTER TO BE FINISHED AND FOR WET AREAS OR ADHESIVE
8 
FINISHING AREAS PLASTER TO BE ROUGH FOR NECESSARY
BONDING.
MIXED MORTAR SHOULD NOT BE LEFT ON THE PLATFORM PRIOR
9 TO OFF THE WORK ON SITE (DURING THE LUNCH TIME CLOSE OUT 
OF WORKS ETC.)
MAKE SURE THAT AT THE JOINTS BETWEEN SLAB AND WALL ARE
10 FILLED WITH APPROVED MATERIAL (FLEXEL BOARD THE APPROVED 
SIZE ONLY)
WHERE EVER OEPNINGS ARE TO BE PROVIDED MEASUREMENTS
11 
CHECKED AS PER THE APPROVED DRAWINGS.
12 THE BLOCK JOINTING IS COMPLETE AND POINTED WELL. 
13 MAKE SURE CURING FOR THE AREA PLASTERED ON SITE 
Activity Briefed by
Site QA/QC / Site engineer/
Name: ____________________________

Sign: ______________________________

Date: _____/_______/________________

Doc. No. GCC: QMS: F022:11a / Issue 5 / Rev 0 / May 2022 Page 1 of