Name Of Project : External Development at SMC Eco-Vision, Bhatar Road-Surat

Client : SMC Eco-Vision, Bhatar Road-Surat


Name Of Contractor: M/S Shree Ram Constructions
ABSTRACT SHEET

Sr.No.

10
Name Of Project : External Development at SMC Eco-Vision, Bhatar Road-Surat
Client : SMC Eco-Vision, Bhatar Road-Surat
Name Of Contractor: M/S Shree Ram Constructions
ABSTRACT SHEET

Description

Soil Filling

PCC Without Steel - 4"

Column Casting

Column Shuttering

Fabrication

Extra Barrication Right Side Face

Extra Barrication Left Side Face

Extra Barrication Right Side Face for Support

Steel Cutting

Extra Barrication front Side Face for Support

AMOUNT

GST @ 18%

TOTAL AMOUNT
urat

SHEET

Unit Quantity Rate Amount Remarks

Cft 825.00 12 ₹ 9,900.00

Cft 561.00 63 ₹ 35,343.00

Nos 8.00 325 ₹ 2,600.00

Sqft 192.00 58 ₹ 11,136.00

Sqft 1650.00 120 ₹ 198,000.00

Sqft 163.00 65 ₹ 10,595.00

Sqft 575.00 65 ₹ 37,375.00

Sqft 38.00 65 ₹ 2,470.00

Nos 64.00 25 ₹ 1,600.00

Sqft 603.75 65 ₹ 39,243.75

₹ 348,262.75

18.00% ₹ 62,687.30

₹ 410,950.05
MEASUREMENT SHEET-CIVIL WORKS BAL

Sr.No.

10
MEASUREMENT SHEET-CIVIL WORKS BALE PRES

Description of Item Unit

Soil Filling Cft

PCC Without Steel - 4" Cft

Column Casting Nos

Column Shuttering Sqft

Fabrication Sqft

Extra Barrication Right Side Face Sqft

Extra Barrication Left Side Face Sqft

Extra Barrication Right Side Face for Support Sqft

Steel Cutting Nos

Extra Barrication front Side Face for Support Sqft


RKS BALE PRESS

Nos Length Width Height Quantity Remarks

1 50' 33' 6" 825.00

1 50' 33' 4" 561.00

8 2' 2' 1'6" 8.00

32 2' 2' 1'6" 192.00

1 50' 33' - 1650.00

1 50' 3'3" - 163.00

1 50' 11'6" - 575.00

1 50' 9" - 38.00

64 - - - 64.00

1 52’6” 11’6” 603.75


Name Of Project : External Development at SMC Eco-Vision, Bhatar Road-Surat
Client : SMC Eco-Vision, Bhatar Road-Surat
Name Of Contractor: M/S Shree Ram Constructions
ABSTRACT SHEET

Sr.No.

8
Name Of Project : External Development at SMC Eco-Vision, Bhatar Road-Surat
Client : SMC Eco-Vision, Bhatar Road-Surat
Name Of Contractor: M/S Shree Ram Constructions
ABSTRACT SHEET

Description

Soil Filling

PCC With Steel - 4"

Column Casting

Column Excavation

Fabrication

Extra Barrication Right Side Face

Extra Barrication Left Side Face

Dismantling Work

AMOUNT

GST @ 18%

TOTAL AMOUNT
urat

SHEET

Unit Quantity Rate Amount Remarks

Cft 412.50 12 ₹ 4,950.00

Cft 280.50 75 ₹ 21,037.50

Nos 3.00 275 ₹ 825.00

Cft 6.00 9 ₹ 54.00

Sqft 825.00 120 ₹ 99,000.00

Sqft 163.00 65 ₹ 10,595.00

Sqft 53.79 65 ₹ 3,496.35

LS 1.00 2000 ₹ 2,000.00

₹ 141,957.85

18.00% ₹ 25,552.41

₹ 167,510.26
MEASUREMENT SHEET-CIVIL WORKS BAC

Sr.No.

8
MEASUREMENT SHEET-CIVIL WORKS BACK SIDE

Description of Item Unit

Soil Filling Cft

PCC With Steel - 4" Cft

Column Casting Nos

Column Excavation Cft

Fabrication Sqft

Extra Barrication Right Side Face Sqft

Extra Barrication Left Side Face Sqft

Dismantling Work LS
RKS BACK SIDE

Nos Length Width Height Quantity Remarks

1 50' 16'6" 6" 412.50

1 50' 16'6" 4" 280.50

3 1' 1' 2' 3.00

3 1' 1' 2' 6.00

1 50' 16'6" - 825.00

1 50' 3'3" - 163.00

1 16'6" 3'3" - 53.79

1 - - - 1.00