You are on page 1of 1

Project Name:- Construction of New Two-Lane Bridge (Parallel to existing Naranarayan Setu) with its approaches from Km 0+000

to Km 4+385 across River Brahmaputra on NH-


17 at Jogighopa in the State of Assam on EPC mode.
SPOT RFI SUMMARY
Client : National Highways & Infrastructure Development Corporation Limited (NHIDCL), PMU-Bongaigaon, Assam
Authority's Engineer : M/s Chaitanya Projects Consultancy Pvt Ltd. In association with M/s Shree Bhawani Consultancy Services Pvt. Ltd.
EPC Contractor : M/s S. P. Singla Constructions Pvt. Ltd.
Date of Submission: 21-07-2022
Date of Inspection: 21-07-2022
SL. Chainage Activity Inspection Inspection
RFI No. Activity Description
No. Location/ Side Time Result/Remarks
From To
(A) STRUCTURE
Viaduct - South Checking of Bore depth, Reinforcement and Cage lowering work of Pier @ P4/4 Working
1 STR/JOGIGHOPA/437 2+534.6 6:00 PM
Bank Pile
Viaduct - South
2 STR/JOGIGHOPA/438 2+534.6 10:00 PM Checking of Concrete work of Pier @ P4/4 Working Pile
Bank
(B ) SURVEY
NIL

(C ) LAB
NIL

(D)HIGHWAY
NIL
No of RFI's 2
Approved
Not-Approved
Not Ready
Requested By Planning Department
Note:
1) Sur- Survey, Str- Structure, Hig- Highway, Lab- Laboratory,