LTD
Assetz House , No. 30, Crescent Road, Bengaluru - 560001.
FINAL REPORT
MAY 2023
TM
Client :
Project :
FINAL REPORT
Page | i
BRIT LOGISTICS PRIVATE
LIMITED Geotechnical Investigation Report
Table of Contents
1 Introduction ........................................................................................................................................... 1
2 Scope of work ....................................................................................................................................... 1
3 Geology of the Area .............................................................................................................................. 1
3.1 Regional & Local Geology ............................................................................................................................ 1
3.2 Local Seismicity ............................................................................................................................................ 2
4 Borehole / Test Location details .......................................................................................................... 2
5 Methodology of Field work ................................................................................................................... 3
5.1 Boring and Drilling ........................................................................................................................................ 3
5.2 Sampling ....................................................................................................................................................... 3
5.3 Undisturbed Soil samples ............................................................................................................................. 3
5.4 Standard Penetration Test (SPT).................................................................................................................. 3
5.5 Rock coring ................................................................................................................................................... 3
5.6 Ground Water Table ..................................................................................................................................... 3
5.7 Electrical Resistivity Test .............................................................................................................................. 3
5.8 Trial Pits ........................................................................................................................................................ 4
5.9 Percolation Test ............................................................................................................................................ 4
6 Laboratory Testing ............................................................................................................................... 4
7 Sub-Soil Profile ..................................................................................................................................... 5
8 Foundation Recommendations ........................................................................................................... 8
8.1 Foundation for the proposed Structure ......................................................................................................... 8
8.2 Width & Settlement of Footing ...................................................................................................................... 8
9 Design Parameters ............................................................................................................................... 9
10 Safe Bearing Capacity (SBC) Calculations ......................................................................................... 9
11 Conclusion and Recommendations .................................................................................................. 10
12 Reference ............................................................................................................................................ 12
13 Annexure ............................................................................................................................................. 12
Page | ii
BRIT LOGISTICS PRIVATE
LIMITED Geotechnical Investigation Report
Page | iii
BRIT LOGISTICS PRIVATE
LIMITED Geotechnical Investigation Report
1 Introduction
M/s. Brit Logistics Private Limited has awarded Geotechnical Investigation (GI) works for the proposed Warehouse facility at
Dobaspet, Bangalore to M/s. SECON Private Limited (SECON) vide by WO Number: AGP/BRIT/WO/008/23-24
The brief scope of work includes drilling 19 boreholes, conducting (03) Percolation tests and (02) Electrical Resistivity tests at
the locations identified by the Client.
Initially 19 BH’s were planned for site Investigation. However, due to objections from Land Owner, 18 BH’s were drilled at the
site.
The present report includes the details of boreholes drilled, sub-soil profiles noticed, laboratory testing of soil and rock core
samples, safe bearing capacity, foundation recommendations for the proposed structure along with 02 No. of Electrical
Resistivity Tests, 03 No. of Trial pits excavated for conducting Percolation tests at site, compaction and 4-day soaked CBR
test results of each trial pit.
2 Scope of work
Brief scope of work includes the following:
Drilling of boreholes of 150 / 76 mm dia. by using Rotary Drilling Rigs.
Termination depth of boreholes: 16 m depth below EGL or 1m in to Rock with CR >25%, whichever is earlier.
Conducting Standard Penetration Tests (SPT) at every 1.5 m intervals till refusal and collection of disturbed soil
samples.
Collection Undisturbed soil samples in cohesive soil layers alternately with SPT.
Determination of Ground Water Table (GWT) in each borehole and collection of water samples for chemical testing
purposes.
Excavation of Trial pits of size 1.0 m x 1.0 m x 1.0 m and Conducting Percolation Tests in the Trial pits as per the
procedure described in IS 2470 Part 2 - 1985 (RA 2017)
Collection of Bulk soil samples from the trial pits for conducting Modified Proctor Compaction and 4-day soaked CBR
tests as per relevant Indian standards
Conducting Electrical Resistivity Tests (ERT) at the locations identified by the Client by using Wenner’s 4-pin
method up to 20 m depth along NS and EW directions
Determination of Apparent Resistivity of soil at each direction and Mean Resistivity of soil
Conducting all relevant laboratory tests on soil and rock core samples collected from the boreholes as per Indian
Standard (IS) specifications.
Preparation and Submission of Geotechnical Investigation Report including sub-soil profile, borehole logs,
interpretation of field and laboratory test, recommendations type of foundation and safe bearing capacity (SBC) of
soil.
3 Geology of the Area
3.1 Regional & Local Geology
Geology-wise, Bangalore district shows the dominant presence of an ‘Archaean’ crystalline formation comprising the
Peninsular Gneissic complex with a small patch of hornblende schist in the northern part and intrusive Closepet granites all
along the western part of the district. These young Gneissic complexes are in the age range of 2.6 to 3.0 billion years. They
are essentially granodioritic and granitic formed due to several thermal-tectonic movements with large influx of sialic materials
representing remobilized parts of an older crust with abundant additions of granitic materials. These gneissic complexes act
as basement for belt of schists, largely basaltic and characterized by gold mineralization, which is noticed in nearby Kolar.
Small stretch comprising unconsolidated sediments are also noticed in Channapatna and Devanahalli. The soil overburden
generally is dominated by silty sand /residual silt and shows presence of clay as a nominal interstitial binder. Overburden in
upper layers is generally in loose /medium compact condition especially in areas with high water table. The overburden
Page | 1
BRIT LOGISTICS PRIVATE
LIMITED Geotechnical Investigation Report
thickness is variable and is reflective of typical differential weathering that has occurred over a prolonged period. This is
followed by completely weathered rock and highly weathered rock.
The geology map of Bangalore is as under:
Geology map of the area is furnished in Figure 1.
3.2 Local Seismicity
Bangalore falls under Zone II of the Seismic Zoning Map as per IS: 1893 (Part I)-2002. Recent earthquakes that occurred
close to Bangalore were in the range of 2.0 to 5.5 on the Richter scale. On January 29, 2001, an earthquake with a
magnitude of 4.3 on the Richter scale hit in the Mandya area, with its epicenter about 35 km south of Bangalore.
4 Borehole / Test Location details
Boreholes / Test Location details are under:
BH / TP Reduced GWT below Termination Depth of
Sl.No. Easting (m) Northing (m)
/ERT No. Level (m) EGL (m) Borehole / ERT/ Trial Pit/ (m)
Boreholes
1. BH 02 743511.000 1459080.000 103.02 16.0
2. BH 03 743451.121 1458973.899 100.73 16.0
3. BH 04 743585.108 1459006.751 100.82 16.0
4. BH 05 743512.656 1458921.610 98.86 16.0
5. BH 06 743650.214 1459137.623 105.30 10.5
6. BH 07 743783.835 1459190.946 107.61 16.0
7. BH 08 743886.565 1459229.191 107.54 16.0
8. BH 09 744019.384 1459191.681 103.23 16.0
9. BH 10 744080.194 1459191.156 101.29 16.0
Not met
10. BH 11 743730.714 1459047.524 103.36 16.0
11. BH 12 743868.080 1459096.314 103.43 10.5
12. BH 13 743965.173 1459118.947 102.46 16.0
13. BH 14 744049.912 1459119.386 100.40 16.0
14. BH 15 743653.150 1458955.379 99.70 16.0
15. BH 16 743786.529 1458990.391 99.22 16.0
16. BH 17 743886.643 1459017.654 100.38 16.0
17. BH 18 744019.732 1459042.983 95.61 16.0
18. BH 19 744080.724 159044.733 96.64 16.0
Electrical Resistivity Tests
1. ERT 1 743464.729 1459008.953 101.21 - 20
2. ERT 2 743941.576 1459194.805 105.18 - 20
Trial Pits
1. PT 1 743485.786 1459027.652 101.59 - 1.0
2. PT 2 743958.836 1459217.708 105.41 - 1.0
3. PT 3 743717.095 1458987.968 101.10 - 1.0
Borehole / Test location plan is provided in Figure 2.
Page | 2
BRIT LOGISTICS PRIVATE
LIMITED Geotechnical Investigation Report
Page | 3
BRIT LOGISTICS PRIVATE
LIMITED Geotechnical Investigation Report
ratio between the potential (V) developed and the current (I) sent gives the resistance “R” and is measured with the help of a
resistivity meter. The resistance thus measured depends on the arrangement of electrodes, known as “configuration” and
also on the resistivity and thickness of the sub-surface formations. There are a number of electrode arrangements
(configuration), namely Wenner and Schlumberger. Wenner‘s configuration is commonly used. In Wenner’s configuration, all
the four electrodes are kept equidistant (known as “electrode separation” ‘a’) along a straight line symmetrically over the
measuring point.
In the present investigation, the Wenner’s configuration has been used. In this configuration, all four electrodes are kept
equidistant (known as “electrode separation” ‘a’) along a straight line symmetrically over the measuring point. The apparent
resistivity (a) is obtained by multiplying the configuration factor 2a with measured resistance (R) values for each interval
i.e.
a = 2aR
The apparent resistivity (a) in ohm- m is considered as the average resistivity of the formation from the surface up to a depth
of ‘a’ (i.e., electrode separation in m). Resistivity measurements give the values at the time of measurement under prevailing
conditions.
The Electrical Resistivity of soil noticed at the site ranges from 43.88 Ohm-m to 112.30 Ohm-m.
The Electrical Resistivity Test results and Curves are presented in Annexure A1.
5.8 Trial Pits
Trial pits of size 1.0 m x 1.0 m x 1.0 m are excavated manually at the locations identified by the Client. Brownish Grey silty
clay and clayey sand have been noticed in the trial pits up to the termination depth.
Trial Pit logs are furnished in Annexure A2.
Bulk soil samples are collected from the trail pits to conduct Compaction and CBR tests.
5.9 Percolation Test
Percolation test is conducted in the trial pits as per the procedure described in IS 2470 (Part 2) - 1985 (RA 2017). Percolation
pit of size 0.3 m x 0.3 m x 0.35 m has been excavated in the bottom of the trial pits to conduct percolation tests.
The test results are furnished in Annexure A3.
6 Laboratory Testing
Relevant tests on soil and rock core samples from boreholes and Bulk samples collected from Trial pits were
carried out as per Bureau of Indian Standards (BIS) for the parameters mentioned below:
Parameter Relevant IS Code
Borehole Soil Samples
Grain Size Analysis - Sieve IS 2720 Part 4 : 1985 (RA 2020)
Natural Moisture Content IS 2720 Part 2 : 1973 (RA 2020)
Specific Gravity IS 2720 Part 3:Sec 1:1980 (RA 2021)
Atterberg’s Limits IS 2720 Part 5 : 1985 (RA 2020)
Shrinkage Limit test IS 2720 Part 6 : 1972 (RA 2021)
Differential Free Swell Index IS 2720 Part 40 : 1977 (RA 2021)
Direct Shear Test IS 2720 Part 13: 1986 (RA 2021)
Rock Core Samples
Specific Gravity IS 1122:1974 (RA 2017)
Water Absorption
Porosity IS 13030:1991 (RA 2016)
Density
Page | 4
BRIT LOGISTICS PRIVATE
LIMITED Geotechnical Investigation Report
Laboratory test results of borehole soil samples are furnished in Annexure B. Grain size analysis and Direct Shear Test
curves are presented in Annexure B1 and Annexure B2.
Laboratory test results of rock core samples are furnished in Annexure C. Point Load Index (PLI), UCC, Brazilian and
Modulus of elasticity test details are presented in Annexure C1, C2, C3 and Annexure C4 respectively.
Test results of Bulk soil samples, Compaction and CBR Curves are presented in Annexure D.
Chemical Test Results are presented in Annexure E.
7 Sub-Soil Profile
Generally, six (06) layer sub-soil profiles were encountered in the boreholes BH 2 to BH 19. The subsoil profile encountered
in the drilled boreholes is as follows:
Layer I: Clayey Silt wit Clay / Clayey Silt
Stiff to Hard, Medium Plastic, Clayey Silt has been encountered in the below mentioned boreholes. The thickness of this layer
and recorded N-values in this layer are as follows:
Page | 5
BRIT LOGISTICS PRIVATE
LIMITED Geotechnical Investigation Report
Page | 6
BRIT LOGISTICS PRIVATE
LIMITED Geotechnical Investigation Report
Page | 7
BRIT LOGISTICS PRIVATE
LIMITED Geotechnical Investigation Report
8 Foundation Recommendations
8.1 Foundation for the proposed Structure
Considering the sub-soil profile noticed, shallow foundations such as Isolated/Spread Foundation can be considered as
suitable foundation for the proposed structures.
The foundations can be considered at 1.5 m, 2.0 m and 3.0 m depth below EGL, based on design considerations.
The N value recorded at 1.5 m, 2.0 m and 3.0 m depth below EGL are as under:
N value at Depth (m)
BH No.
1.5 2.0 3.0
BH 02 17 18 20
BH 03 21 24 31
BH 04 26 27 28
BH 05 20 21 24
BH 06 18 19 20
BH 07 17 18 20
BH 08 16 16 17
BH 09 17 17 18
BH 10 18 19 20
BH 11 20 21 24
BH 12 12 14 18
BH 13 27 28 30
BH 14 22 23 25
BH 15 21 22 25
BH 16 24 25 28
BH 17 29 33 41
BH 18 26 27 28
BH 19 19 21 26
Average N
21 22 24
Value
8.2 Width & Settlement of Footing
Minimum and maximum footing widths for isolated spread footings / raft foundations considered in the report are as
follows:
Footing Type Minimum Footing Width (m) Maximum Footing Width (m)
Isolated Spread 2.0 4.0
Raft ≥ 6.0 -
Page | 8
BRIT LOGISTICS PRIVATE
LIMITED Geotechnical Investigation Report
9 Design Parameters
Very Stiff Clayey Silt has been noticed in the boreholes at the proposed founding level of 1.5 m, 2.0 m and 3.0 m depth. The
following design parameters are considered for SBC calculations:
Page | 9
BRIT LOGISTICS PRIVATE
LIMITED Geotechnical Investigation Report
1.5 27 27 20.50
2.0 2.0 35 35 26.40 50
3.0 51 51 36.44
1.5 31 31 37.58
3.0 2.0 38 33 43.14
3.0 52 28 43.09
50
1.5 34 22 45.19
4.0 2.0 41 20 45.90
3.0 55 18 44.17
The recommended Net Safe Bearing Capacity (SBC) values are tabulated below:
Foundation Net SBC for shallow foundations (t/sq.m)
Location Depth below Width (m)
EGL (m) 2.0 3.0 4.0
1.5 27 31 22
All BHs 2.0 35 33 20
3.0 51 28 18
Detailed calculation for estimation of Net SBC is presented in Annexure F.
11 Conclusion and Recommendations
Eighteen boreholes BH 02 to BH 19 were drilled at site, at the locations identified by the Client.
The sub-soil profile encountered in the boreholes is described in Clause.7 above.
Based on the sub-soil profile encountered, shallow foundations such as Isolated / Spread foundation is suitable for
the proposed structure.
The recommended SBC for isolated foundations of width 2 m, 3 m and 4 m is as under:
Foundation Net SBC for shallow foundations (t/sq.m)
Stratum at the
Location Depth below Width (m)
Founding Level
EGL (m) 2.0 3.0 4.0
1.5 27 31 22
All BHs 2.0 Clayey Silt 35 33 20
3.0 51 28 18
Strata at the foundation level shall be thoroughly checked before placing the foundations on loose soil / weathered
rock strata. If any loose soil pockets or cavities, uneven rock surface are present / noticed they shall be replaced
with lean concrete before placing the foundations.
It is important that undisturbed soil (natural ground) or adequately compacted soil be present at the bottom of the
footing excavations and that the footings be cleaned of all loose debris prior to placement of concrete.
Page | 10
BRIT LOGISTICS PRIVATE
LIMITED Geotechnical Investigation Report
The chemical contents present in the soil are well within the permissible limits. Hence, no special precautions are
necessary for the concreting job.
The excavated material may be used for general filling purposes as well as for filling foundation pits. If the in-situ
material is to be used as a backfilling material, it should be compacted to not less than 97% of the MDD in 300 mm
layers.
Good site drainage must be provided to reduce the risk of sub-surface materials becoming saturated, the risk of
differential settlement and to prevent scouring and erosion of the surface materials. The service trenches are
suggested to be located at least 1.5 m away from any of the structures anticipated.
Two ERTs were conducted at the site as per Wenner’s 4-pin method and readings were taken up to 20 m depth
along the EW direction and 20 m depth along the NS direction.
Based on the test result, the mean resistivity of the soil at each test location is as follows:
1 ERT 1 43.88
2 ERT 2 112.30
Maximum Dry density of soil varies from 1.79 to 1.91 g/cc and Optimum Moisture Content (OMC) varies from 13.9 %
to 15.4 %.
4-day soaked CBR value varies from 6.65 to 8.13 %. CBR value of minimum 6.0 % can be considered for design
purposes.
Page | 11
BRIT LOGISTICS PRIVATE
LIMITED Geotechnical Investigation Report
12 Reference
IS 1892-1979: Code of Practice for Subsurface Investigation for Foundations, Bureau of Indian Standards, New
Delhi
IS 1498-1970: Classification and Identification of Soils for General Engineering Purpose, Bureau of Indian
Standards, New Delhi
IS 2131-1981: Method of Standard Penetration Test, Bureau of Indian Standards, New Delhi
IS 6403-1981: COP for Determination of Bearing Capacity of Shallow Foundations, Bureau of Indian Standards,
New Delhi
IS 8009 (Part 1)-1976: COP for calculation of Settlements of Foundations, Part 1 - Shallow Foundations subjected to
Symmetrical Static Vertical Loads, Bureau of Indian Standards, New Delhi
IS 12070 - 1987: COP for Design and Construction of Shallow Foundations on Rocks, Bureau of Indian Standards,
New Delhi
SP 36 (Part 1) - Compendium of Indian Standards on Soil Engineering, Laboratory Testing of Soils for Civil
Engineering Purposes, Bureau of Indian Standards, New Delhi
SP 36 (Part 2) - Compendium of Indian Standards on Soil Engineering, Field Testing of Soils for Civil Engineering
Purposes, Bureau of Indian Standards, New Delhi
IS 1893 - 1984 (Reaffirmed 2002): Criteria for Earthquake Resistant Design of Structures, Bureau of Indian
Standards, New Delhi
IS 456 - 2000: Plain and Reinforced Concrete - Code of Practice (Fourth Revision), Bureau of Indian Standards,
New Delhi
IS 5529 (Part 1) - 1985: Indian Standard Code of Practice for In-situ Permeability Tests, Part 1 Tests in Overburden,
Bureau of Indian Standards, New Delhi
A Text Book of Soil Chemical Analysis, RR Hesse, CBS Publishers & Distributors, New Delhi.
Seismotectonic Atlas of India and its Environs, Geological Survey of India, 2000
Bowles J E., Foundation Analysis & Design (International Edition), McGraw Hill, Singapore, 1988
P C Varghese, Foundation Engineering, Prentice Hall of India Private Limited, 2005
IS 7356 Part 1 - 2002 (Reaffirmed 2021): Code of Practice for Installation, Maintenance and Observation of
Instruments for Pore Pressure Measurements in Earth Dams and Rockfill Dams - Part 1 : Porous Tube Piezometers,
Bureau of Indian Standards, New Delhi
13 Annexure
Page | 12
BRIT LOGISTICS PRIVATE LIMITED
Geotechnical Investigation Report
FIGURE 1
GEOLOGY MAP OF BANGALORE
Page | 13
12m Wide-25A
12m Wide-24A
0
ad-2
e Ro
Wid
12m Wide-23
18m
AREA
D U STRIAL PRIVATE PROPERTY
EIN
HAS
4TH P 12m Wide Road-22
KIADB
e Ro
ad-2
0 BH 8
ERT 2
Park-13 BH 7 BH 9 BH 10
BLOCK-6C
0
ad-2
e Ro
Wid
18m
BH 6
GOTTIGERE VILLAGE BLOCK-7 BH 13 BH 14
BH 12
BH 2
PT 1
BH 17
ERT 1 BH 4
PT 3 BH 16
BLOCK-7A
BH 3
BH 15
BH 5
BLOCK-2
BH
ERT
PT
6.00 SPT 7 13 19 32
7.00
SPT 12 14 18 32
8.00
9.00 SPT 13 19 21 40
Greyish Brown, Hard,
10.00 Medium Plastic,
CLAYEY SILT (MI) SPT 22 31 41 72
11.00
13.00
Greyish Brown, Very SPT 32 50B / 12 cm N>100
14.00 Dense, SOFT
DISINTEGRATED
15.00 ROCK (SDR) SPT 50B / 14 cm N>100
15
Borelogs
PROJECT : Geotechnical Investigations for Greenfield 'A' Warehousing Facility TYPE OF BORING : Rotary
CLIENT : Brit Logistics Pvt. Ltd. BORE HOLE DIA. : 150/76 mm
LOCATION : Dobaspet GWT : Not met
BORE HOLE NO. : BH 03 DATE OF COMMENCEMENT : 13.04.2023
CO-ORDINATES : E 743451.121 m, N 1458973.899 m DATE OF COMPLETION : 13.04.2023
RL(m) : 100.73 m
STANDARD PENETRATION TEST
NO. OF BLOWS FOR
DEPTH
FIELD TYPE OF ROCK DRILLING
BELOW PROFILE 'N'- REMARKS
CLASSIFICATION SAMPLING FIRST 15 cm NEXT 15 cm NEXT 15
EGL (m) VALUE
(N1) (N2) cm (N3)
(N2 + N3)
CR (%) RQD (%)
0.50 DS DS Collected
1.00
SPT 6 8 13 21
Reddish Brown, Very
2.00
Stiff, Medium Plastic,
CLAYEY SILT WITH
3.00 UDS UDS Collected
CLAY (MI)
4.00
SPT 9 14 26 40
5.00
6.00 SPT 12 18 20 38
7.00
SPT 14 17 25 42
8.00
Greyish Brown, Hard,
9.00 SPT 15 22 28 50
Medium Plastic,
CLAYEY SILT (MI)
10.00
SPT 18 20 27 47
11.00
12.00 SPT 16 24 29 53
13.00
SPT 31 50B / 10 cm N>100
14.00
Greyish Brown, Very
Dense, SOFT
15.00 SPT 23 50B / 12 cm N>100
DISINTEGRATED
ROCK (SDR)
16.00 SPT 24 50B / 10 cm N>100
BH 03 Terminated at 16.0m
SPT = STANDARD PENETRATION TEST UDS = UNDISTURBED SAMPLE DC = DISTURBED CORE SAMPLE
B: NO OF BLOWS B= NO OF BLOWS
DS = DISTURBED SAMPLE R= REFUSAL SECON
16
Borelogs
PROJECT : Geotechnical Investigations for Greenfield 'A' Warehousing Facility TYPE OF BORING : Rotary
CLIENT : Brit Logistics Pvt. Ltd. BORE HOLE DIA. : 150/76 mm
LOCATION : Dobaspet GWT : Not met
BORE HOLE NO. : BH 04 DATE OF COMMENCEMENT : 10.04.2023
CO-ORDINATES : E 743585.108 m, N 1459006.751 m DATE OF COMPLETION : 11.04.2023
RL(m) : 100.82 m
STANDARD PENETRATION TEST
NO. OF BLOWS FOR
DEPTH
FIELD TYPE OF ROCK DRILLING
BELOW PROFILE 'N'- REMARKS
CLASSIFICATION SAMPLING FIRST 15 cm NEXT 15 cm NEXT 15
EGL (m) VALUE
(N1) (N2) cm (N3)
(N2 + N3)
CR (%) RQD (%)
0.50 DS DS Collected
1.00
SPT 8 12 14 26
Reddish Brown, Very
2.00
Stiff, Medium Plastic,
CLAYEY SILT WITH
3.00 UDS UDS Collected
CLAY (MI)
4.00
SPT 10 14 16 30
5.00
6.00 SPT 12 18 24 42
7.00
SPT 15 17 19 36
8.00
Reddish Brown, Hard,
9.00 SPT 17 20 26 46
Medium Plastic,
CLAYEY SILT (MI)
10.00
SPT 19 23 26 49
11.00
12.00 SPT 20 26 29 55
13.00
SPT 39 50B / 10 cm N>100
14.00
Greyish Brown, Very
Dense, SOFT
15.00 SPT 50B / 12 cm N>100
DISINTEGRATED
ROCK (SDR)
16.00 SPT 50B / 11 cm N>100
BH 04 Terminated at 16.0m
SPT = STANDARD PENETRATION TEST UDS = UNDISTURBED SAMPLE DC = DISTURBED CORE SAMPLE
B: NO OF BLOWS B= NO OF BLOWS
DS = DISTURBED SAMPLE R= REFUSAL SECON
17
Borelogs
PROJECT : Geotechnical Investigations for Greenfield 'A' Warehousing Facility TYPE OF BORING : Rotary
CLIENT : Brit Logistics Pvt. Ltd. BORE HOLE DIA. : 150/76 mm
LOCATION : Dobaspet GWT : Not met
BORE HOLE NO. : BH 05 DATE OF COMMENCEMENT : 11.04.2023
CO-ORDINATES : E 743512.656 m, N 1458921.610 m DATE OF COMPLETION : 12.04.2023
RL(m) : 98.86 m
STANDARD PENETRATION TEST
NO. OF BLOWS FOR
DEPTH
FIELD TYPE OF ROCK DRILLING
BELOW PROFILE 'N'- REMARKS
CLASSIFICATION SAMPLING FIRST 15 cm NEXT 15 cm NEXT 15
EGL (m) VALUE
(N1) (N2) cm (N3)
(N2 + N3)
CR (%) RQD (%)
0.50 DS DS Collected
1.00
SPT 7 8 12 20
2.00 Reddish Brown,Very
Stiff, Medium Plastic,
3.00 CLAYEY SILT (MI) UDS UDS Collected
4.00
SPT 10 13 15 28
5.00
6.00 SPT 12 15 17 32
7.00
SPT 15 18 22 40
8.00 Reddish Brown,Very Stiff
to Hard, Medium Plastic,
9.00 CLAYEY SILT (MI) SPT 22 39 40 79
10.00
SPT 27 35 40 75
11.00
13.00
Greyish Brown, Very SPT 32 50B / 11 cm N>100
14.00 Dense, SOFT
DISINTEGRATED
15.00 ROCK (SDR) SPT 50B / 7 cm N>100
18
Borelogs
PROJECT : Geotechnical Investigations for Greenfield 'A' Warehousing Facility TYPE OF BORING : Rotary
CLIENT : Brit Logistics Pvt. Ltd. BORE HOLE DIA. : 150/76 mm
LOCATION : Dobaspet GWT : Not met
BORE HOLE NO. : BH 06 DATE OF COMMENCEMENT : 11.04.2023
CO-ORDINATES : E 743650.214 m, N 1459137.623 m DATE OF COMPLETION : 12.04.2023
RL(m) : 105.30 m
STANDARD PENETRATION TEST
NO. OF BLOWS FOR
DEPTH
FIELD TYPE OF ROCK DRILLING
BELOW PROFILE 'N'- REMARKS
CLASSIFICATION SAMPLING FIRST 15 cm NEXT 15 cm NEXT 15
EGL (m) VALUE
(N1) (N2) cm (N3)
(N2 + N3)
CR (%) RQD (%)
0.50 DS DS Collected
1.00
SPT 7 8 10 18
2.00
4.00
Reddish Brown,Very Stiff SPT 9 10 11 21
5.00 to Hard, Medium Plastic,
CLAYEY SILT (MI)
6.00 SPT 11 14 16 30
7.00
SPT 16 19 27 46
8.00
19
Borelogs
PROJECT : Geotechnical Investigations for Greenfield 'A' Warehousing Facility TYPE OF BORING : Rotary
CLIENT : Brit Logistics Pvt. Ltd. BORE HOLE DIA. : 150/76 mm
LOCATION : Dobaspet GWT : Not met
BORE HOLE NO. : BH 07 DATE OF COMMENCEMENT : 10.04.2023
CO-ORDINATES : E 743783.835 m, N 1459190.946 m DATE OF COMPLETION : 11.04.2023
RL(m) : 107.61 m
STANDARD PENETRATION TEST
NO. OF BLOWS FOR
DEPTH TYPE OF
FIELD ROCK DRILLING
BELOW PROFILE SAMPLIN 'N'- REMARKS
CLASSIFICATION FIRST 15 NEXT 15 cm NEXT 15 cm
EGL (m) G VALUE
cm (N1) (N2) (N3)
(N2 + N3)
CR (%) RQD (%)
0.50 DS DS Collected
1.00
SPT 7 8 9 17
2.00
Reddish Brown,Very
3.00 UDS UDS Collected
Stiff, Medium Plastic,
CLAYEY SILT (MI)
4.00
SPT 8 10 12 22
5.00
6.00 SPT 9 11 13 24
7.00
SPT 11 13 15 28
8.00
Brownish Yellow, Very
9.00 Stiff to Hard, Medium SPT 14 16 21 37
Plastic, CLAYEY SILT
10.00 (MI)
SPT 21 29 41 70
11.00
13.00
Greyish Brown, Very SPT 50B / 11 cm N>100
14.00 Dense, SOFT
DISINTEGRATED
15.00 ROCK (SDR) SPT 50B / 15 cm N>100
20
Borelogs
PROJECT : Geotechnical Investigations for Greenfield 'A' Warehousing Facility TYPE OF BORING : Rotary
CLIENT : Brit Logistics Pvt. Ltd. BORE HOLE DIA. : 150/76 mm
LOCATION : Dobaspet GWT : Not met
BORE HOLE NO. : BH 08 DATE OF COMMENCEMENT : 30.03.2023
CO-ORDINATES : E 73886.565 m, N 1459229.191 m DATE OF COMPLETION : 31.03.2023
RL(m) : 107.54 m
STANDARD PENETRATION TEST
NO. OF BLOWS FOR
DEPTH
FIELD TYPE OF ROCK DRILLING
BELOW PROFILE 'N'- REMARKS
CLASSIFICATION SAMPLING FIRST 15 NEXT 15 cm NEXT 15 cm
EGL (m) VALUE
cm (N1) (N2) (N3)
(N2 + N3)
CR (%) RQD (%)
0.50 DS DS Collected
1.00
SPT 4 8 8 16
2.00
Reddish Brown, Medium
3.00 Plastic, Very Stiff, UDS UDS Collected
CLAYEY SILT WITH
4.00 CLAY (MI)
SPT 5 6 11 17
5.00
6.00 SPT 11 17 20 37
7.00
SPT 27 40 50B / 10 cm N>100
8.00
13.00
Greyish Brown, Very SPT 34 50B / 10 cm N>100
14.00 Dense, SOFT
DISINTEGRATED
15.00 ROCK (SDR) SPT 39 50B / 12 cm N>100
21
Borelogs
PROJECT : Geotechnical Investigations for Greenfield 'A' Warehousing Facility TYPE OF BORING : Rotary
CLIENT : Brit Logistics Pvt. Ltd. BORE HOLE DIA. : 150/76 mm
LOCATION : Dobaspet GWT : Not met
BORE HOLE NO. : BH 09 DATE OF COMMENCEMENT : 30.03.2023
CO-ORDINATES : E744019.384 m, N 1459191.681 m DATE OF COMPLETION : 31.03.2023
RL(m) : 103.23 m
STANDARD PENETRATION TEST
NO. OF BLOWS FOR
DEPTH
FIELD TYPE OF ROCK DRILLING
BELOW PROFILE 'N'- REMARKS
CLASSIFICATION SAMPLING FIRST 15 NEXT 15 cm NEXT 15 cm
EGL (m) VALUE
cm (N1) (N2) (N3)
(N2 + N3)
CR (%) RQD (%)
0.50 DS DS Collected
1.00
SPT 5 8 9 17
2.00
6.00 SPT 9 14 23 37
7.00
SPT 10 17 25 43
8.00
9.00 SPT 12 18 27 45
10.00
SPT 15 21 30 51
11.00 Greyish Brown, Hard,
Medium Plastic,
12.00 CLAYEY SILT (MI) SPT 20 25 39 64
13.00
SPT 18 27 38 65
14.00
15.00 SPT 17 31 46 77
Greyish Brown, Very
Dense, SOFT
DISINTEGRATED
16.00 ROCK (SDR) SPT 50B/13 cm N>100
BH 09 Terminated at 16.0m
SPT = STANDARD PENETRATION TEST UDS = UNDISTURBED SAMPLE DC = DISTURBED CORE SAMPLE
B: NO OF BLOWS B= NO OF BLOWS
DS = DISTURBED SAMPLE R= REFUSAL SECON
22
Borelogs
PROJECT : Geotechnical Investigations for Greenfield 'A' Warehousing Facility TYPE OF BORING : Rotary
CLIENT : Brit Logistics Pvt. Ltd. BORE HOLE DIA. : 150/76 mm
LOCATION : Dobaspet GWT : Not met
BORE HOLE NO. : BH 10 DATE OF COMMENCEMENT : 01.04.2023
CO-ORDINATES : E 744080.194 m, N 1459191.156 m DATE OF COMPLETION : 02.04.2023
RL(m) : 101.29 m
STANDARD PENETRATION TEST
NO. OF BLOWS FOR
DEPTH
FIELD TYPE OF ROCK DRILLING
BELOW PROFILE 'N'- REMARKS
CLASSIFICATION SAMPLING FIRST 15 cm NEXT 15 cm NEXT 15
EGL (m) VALUE
(N1) (N2) cm (N3)
(N2 + N3)
CR (%) RQD (%)
0.50 DS DS Collected
1.00
SPT 7 8 10 18
Reddish Brown, Medium
2.00
Plastic, Very Stiff ,
CLAYEY SILT WITH
3.00 UDS UDS Collected
CLAY (MI)
4.00
SPT 7 9 12 21
5.00
6.00 SPT 8 11 16 27
7.00
SPT 10 14 18 32
8.00 Reddish Brown, Hard,
Medium Plastic,
9.00 CLAYEY SILT (MI) SPT 13 19 22 41
10.00
SPT 20 32 40 72
11.00
13.00
Greyish Brown, Very SPT 39 50B/ 8 cm N>100
14.00 Dense, SOFT
DISINTEGRATED
15.00 ROCK (SDR) SPT 50B/ 13 cm N>100
23
Borelogs
PROJECT : Geotechnical Investigations for Greenfield 'A' Warehousing Facility TYPE OF BORING : Rotary
CLIENT : Brit Logistics Pvt. Ltd. BORE HOLE DIA. : 150/76 mm
LOCATION : Dobaspet GWT : Not met
BORE HOLE NO. : BH 11 DATE OF COMMENCEMENT : 08.04.2023
CO-ORDINATES : E 743730.714 m, N 1459047.524 m DATE OF COMPLETION : 09.04.2023
RL(m) : 103.36 m
STANDARD PENETRATION TEST
NO. OF BLOWS FOR
DEPTH
FIELD TYPE OF ROCK DRILLING
BELOW PROFILE 'N'- REMARKS
CLASSIFICATION SAMPLING FIRST 15 cm NEXT 15 cm NEXT 15
EGL (m) VALUE
(N1) (N2) cm (N3)
(N2 + N3)
CR (%) RQD (%)
0.50 DS DS Collected
1.00
SPT 7 8 12 20
2.00
Reddish Brown,Very
3.00 UDS UDS Collected
Stiff, Medium Plastic,
CLAYEY SILT (MI)
4.00
SPT 9 11 17 28
5.00
6.00 SPT 13 15 21 31
7.00
SPT 16 19 23 41
8.00
9.00 SPT 14 18 24 42
Reddish Brown,Very Stiff
10.00 to Hard, Medium Plastic,
CLAYEY SILT (MI) SPT 16 24 27 51
11.00
12.00 SPT 17 22 32 54
13.00
SPT 18 50B / 14 cm N>100
14.00
Greyish Brown, Very
Dense, SOFT
15.00 SPT 50B / 13 cm N>100
DISINTEGRATED
ROCK (SDR)
16.00 SPT 50B / 10 cm N>100
BH 11 Terminated at 16.0m
SPT = STANDARD PENETRATION TEST UDS = UNDISTURBED SAMPLE DC = DISTURBED CORE SAMPLE
B: NO OF BLOWS B= NO OF BLOWS
DS = DISTURBED SAMPLE R= REFUSAL SECON
24
Borelogs
PROJECT : Geotechnical Investigations for Greenfield 'A' Warehousing Facility TYPE OF BORING : Rotary
CLIENT : Brit Logistics Pvt. Ltd. BORE HOLE DIA. : 150/76 mm
LOCATION : Dobaspet GWT : Not met
BORE HOLE NO. : BH 12 DATE OF COMMENCEMENT : 01.04.2023
CO-ORDINATES : E 743868.080 m, N 1459096.314 m DATE OF COMPLETION : 02.04.2023
RL(m) : 103.43 m
STANDARD PENETRATION TEST
NO. OF BLOWS FOR
DEPTH
FIELD TYPE OF ROCK DRILLING
BELOW PROFILE 'N'- REMARKS
CLASSIFICATION SAMPLING FIRST 15 cm NEXT 15 cm NEXT 15
EGL (m) VALUE
(N1) (N2) cm (N3)
(N2 + N3)
CR (%) RQD (%)
0.50 DS DS Collected
1.00
SPT 4 5 7 12
2.00 Reddish Brown, Medium
Plastic, Stiff, CLAYEY
3.00 SILT WITH CLAY (MI) UDS UDS Collected
4.00
SPT 9 11 13 24
5.00
Greyish Brown, Hard,
6.00 SPT 14 17 21 38
Medium Plastic,
CLAYEY SILT (MI)
7.00
SPT 27 35 41 76
8.00 Greyish Brown, Very
Dense, SOFT
9.00 DISINTEGRATED SPT 50B / 2cm R N>100 WS Collected
ROCK (SDR)
Greyish Brown,
10.00 MODERATELY 5+6+9+4+6+22+20+2 =
RUN I 9.5 m to 10.5 m 74 42
WEATHERED ROCK 74 cm
(MWR)
BH 12 Terminated at 10.5m
SPT = STANDARD PENETRATION TEST UDS = UNDISTURBED SAMPLE DC = DISTURBED CORE SAMPLE
B: NO OF BLOWS B= NO OF BLOWS WS = WASH SAMPLE
DS = DISTURBED SAMPLE R= REFUSAL SECON
25
Borelogs
PROJECT : Geotechnical Investigations for Greenfield 'A' Warehousing Facility TYPE OF BORING : Rotary
CLIENT : Brit Logistics Pvt. Ltd. BORE HOLE DIA. : 150/76 mm
LOCATION : Dobaspet GWT : Not met
BORE HOLE NO. : BH 13 DATE OF COMMENCEMENT : 03.04.2023
CO-ORDINATES : E 743965.173 m, N 1459118.947 m DATE OF COMPLETION : 04.04.2023
RL(m) : 102.46 m
STANDARD PENETRATION TEST
NO. OF BLOWS FOR
DEPTH
FIELD TYPE OF ROCK DRILLING
BELOW PROFILE 'N'- REMARKS
CLASSIFICATION SAMPLING FIRST 15 cm NEXT 15 cm NEXT 15
EGL (m) VALUE
(N1) (N2) cm (N3)
(N2 + N3)
CR (%) RQD (%)
0.50 DS DS Collected
1.00
SPT 9 11 16 27
Reddish Brown, Medium
2.00
Plastic, Very Stiff,
CLAYEY SILT WITH
3.00 UDS UDS Collected
CLAY (MI)
4.00
SPT 11 14 18 32
5.00
6.00 SPT 14 18 21 39
7.00
SPT 16 23 28 51
8.00 Reddish Brown, Hard,
Medium Plastic,
9.00 CLAYEY SILT (MI) SPT 13 19 22 41
10.00
SPT 21 28 32 60
11.00
13.00
Greyish Brown, Very SPT 29 50B / 12 cm N>100
14.00 Dense, SOFT
DISINTEGRATED
15.00 ROCK (SDR) SPT 50B / 12 cm N>100
26
Borelogs
PROJECT : Geotechnical Investigations for Greenfield 'A' Warehousing Facility TYPE OF BORING : Rotary
CLIENT : Brit Logistics Pvt. Ltd. BORE HOLE DIA. : 150/76 mm
LOCATION : Dobaspet GWT : Not met
BORE HOLE NO. : BH 14 DATE OF COMMENCEMENT : 03.04.2023
CO-ORDINATES : E 744049.912 m, N 1459119.386 m DATE OF COMPLETION : 04.04.2023
RL(m) : 100.40 m
STANDARD PENETRATION TEST
NO. OF BLOWS FOR
DEPTH TYPE OF
FIELD ROCK DRILLING
BELOW PROFILE SAMPLIN 'N'- REMARKS
CLASSIFICATION FIRST 15 cm NEXT 15 cm NEXT 15 cm
EGL (m) G VALUE
(N1) (N2) (N3)
(N2 + N3)
CR (%) RQD (%)
0.50 DS DS Collected
1.00
SPT 8 9 13 22
2.00
Reddish Brown, Medium
3.00 Plastic, Very Stiff, UDS UDS Collected
CLAYEY SILT WITH
4.00 CLAY (MI)
SPT 10 13 15 28
5.00
6.00 SPT 11 12 18 30
7.00
SPT 17 25 27 52
8.00
Greyish Brown, Hard,
9.00 SPT 21 27 31 58
Medium Plastic,
CLAYEY SILT (MI)
10.00
SPT 18 25 38 63
11.00
12.00 SPT 21 38 42 80
13.00
Greyish Brown,Very SPT 28 50B / 13 cm N>100
14.00 Dense, SOFT
DISINTEGRATED
15.00 ROCK (SDR) SPT 50B / 14 cm N>100
27
Borelogs
PROJECT : Geotechnical Investigations for Greenfield 'A' Warehousing Facility TYPE OF BORING : Rotary
CLIENT : Brit Logistics Pvt. Ltd. BORE HOLE DIA. : 150/76 mm
LOCATION : Dobaspet GWT : Not met
BORE HOLE NO. : BH 15 DATE OF COMMENCEMENT : 08.04.2023
CO-ORDINATES : E 743653.150 m, N 1458955.379 m DATE OF COMPLETION : 09.04.2023
RL(m) : 99.70 m
STANDARD PENETRATION TEST
NO. OF BLOWS FOR
DEPTH
FIELD TYPE OF ROCK DRILLING
BELOW PROFILE 'N'- REMARKS
CLASSIFICATION SAMPLING FIRST 15 NEXT 15 cm NEXT 15 cm
EGL (m) VALUE
cm (N1) (N2) (N3)
(N2 + N3)
CR (%) RQD (%)
0.50 DS DS Collected
1.00
SPT 8 9 12 21
2.00
Reddish Brown,Very
3.00 UDS UDS Collected
Stiff, Medium Plastic,
CLAYEY SILT (MI)
4.00
SPT 10 13 16 29
5.00
6.00 SPT 14 18 20 38
7.00
SPT 17 19 21 40
8.00 Greyish Brown, Hard,
Medium Plastic,
9.00 CLAYEY SILT (MI) SPT 23 30 41 71
10.00
SPT 19 26 50B/ 11 cm N>100
11.00
28
Borelogs
PROJECT : Geotechnical Investigations for Greenfield 'A' Warehousing Facility TYPE OF BORING : Rotary
CLIENT : Brit Logistics Pvt. Ltd. BORE HOLE DIA. : 150/76 mm
LOCATION : Dobaspet GWT : Not met
BORE HOLE NO. : BH 16 DATE OF COMMENCEMENT : 07.04.2023
CO-ORDINATES : E 743786.529 m, N 1458990.391 m DATE OF COMPLETION : 08.04.2023
RL(m) : 99.22 m
STANDARD PENETRATION TEST
NO. OF BLOWS FOR
DEPTH
FIELD TYPE OF ROCK DRILLING
BELOW PROFILE 'N'- REMARKS
CLASSIFICATION SAMPLING FIRST 15 cm NEXT 15 cm NEXT 15
EGL (m) VALUE
(N1) (N2) cm (N3)
(N2 + N3)
CR (%) RQD (%)
0.50 DS DS Collected
1.00
SPT 8 11 13 24
Reddish Brown, Medium
2.00
Plastic, Very Stiff,
CLAYEY SILT WITH
3.00 UDS UDS Collected
CLAY (MI)
4.00
SPT 9 15 17 32
5.00
6.00 SPT 14 21 25 46
7.00
SPT 15 18 22 40
8.00
Greyish Brown, Hard,
9.00 SPT 16 19 24 43
Medium Plastic,
CLAYEY SILT (MI)
10.00
SPT 17 22 29 51
11.00
12.00 SPT 16 24 31 55
13.00
SPT 27 50B / 12 cm N>100
14.00
Greyish Brown, Very
Dense, SOFT
15.00 SPT 36 50B / 10 cm N>100
DISINTEGRATED
ROCK (SDR)
16.00 SPT 50B / 13 cm N>100
BH 16 Terminated at 16.0m
SPT = STANDARD PENETRATION TEST UDS = UNDISTURBED SAMPLE DC = DISTURBED CORE SAMPLE
B: NO OF BLOWS B= NO OF BLOWS
DS = DISTURBED SAMPLE R= REFUSAL SECON
29
Borelogs
PROJECT : Geotechnical Investigations for Greenfield 'A' Warehousing Facility TYPE OF BORING : Rotary
CLIENT : Brit Logistics Pvt. Ltd. BORE HOLE DIA. : 150/76 mm
LOCATION : Dobaspet GWT : Not met
BORE HOLE NO. : BH 17 DATE OF COMMENCEMENT : 05.04.2023
CO-ORDINATES : E 743886.643 m, N 1458990.391 m DATE OF COMPLETION : 06.04.2023
RL(m) : 100.38 m
STANDARD PENETRATION TEST
NO. OF BLOWS FOR
DEPTH
FIELD TYPE OF ROCK DRILLING
BELOW PROFILE 'N'- REMARKS
CLASSIFICATION SAMPLING FIRST 15 cm NEXT 15 cm NEXT 15
EGL (m) VALUE
(N1) (N2) cm (N3)
(N2 + N3)
CR (%) RQD (%)
0.50 DS DS Collected
1.00
SPT 8 12 17 29
Reddish Brown, Medium
2.00
Plastic, Very Stiff,
CLAYEY SILT WITH
3.00 UDS UDS Collected
CLAY (MI)
4.00
SPT 14 21 31 52
5.00
Reddish Brown, Medium
6.00 SPT 20 27 38 65
Plastic, Hard, CLAYEY
SILT (MI)
7.00
SPT 24 50B/ 13 cm N>100
8.00
10.00
SPT 50 50B/ 14 cm N>100
11.00
Greyish Brown, Very
Dense, SOFT
12.00 SPT 50B/ 13 cm N>100
DISINTEGRATED
ROCK (SDR)
13.00
SPT 50B / 13 cm N>100
14.00
30
Borelogs
PROJECT : Geotechnical Investigations for Greenfield 'A' Warehousing Facility TYPE OF BORING : Rotary
CLIENT : Brit Logistics Pvt. Ltd. BORE HOLE DIA. : 150/76 mm
LOCATION : Dobaspet GWT : Not met
BORE HOLE NO. : BH 18 DATE OF COMMENCEMENT : 07.04.2023
CO-ORDINATES : E 744019.732 m, N 1459042.983 m DATE OF COMPLETION : 08.04.2023
RL(m) : 95.61 m
STANDARD PENETRATION TEST
NO. OF BLOWS FOR
DEPTH
FIELD TYPE OF ROCK DRILLING
BELOW PROFILE 'N'- REMARKS
CLASSIFICATION SAMPLING FIRST 15 NEXT 15 cm NEXT 15 cm
EGL (m) VALUE
cm (N1) (N2) (N3)
(N2 + N3)
CR (%) RQD (%)
0.50 DS DS Collected
1.00
SPT 8 12 14 26
Reddish Brown, Medium
2.00
Plastic, Very Stiff ,
CLAYEY SILT WITH
3.00 UDS UDS Collected
CLAY (MI)
4.00
SPT 10 14 16 30
5.00
6.00 SPT 13 17 21 38
7.00
Greyish Brown, Hard,
SPT 12 16 19 35
Medium Plastic,
8.00
CLAYEY SILT (MI)
9.00 SPT 17 22 29 51
10.00
SPT 22 50B/ 14 cm N>100
11.00
Greyish Brown, Very
12.00 Dense, SOFT SPT 32 50B/ 12 cm N>100
DISINTEGRATED
13.00 ROCK (SDR)
SPT 50B / 14 cm N>100
14.00 Greyish Brown,
COMPLETELY RUN I 13.5 m to 15.0 m 10 Nil 3+5+7 = 15 cm
WEATHERED ROCK
15.00 (CWR)
Greyish Brown, HIGHLY
WEATHERED ROCK RUN II 15.0 m to 16.0 m 22 22 12+11 = 22 cm
(HWR)
16.00
BH 18 Terminated at 16.0m
SPT = STANDARD PENETRATION TEST UDS = UNDISTURBED SAMPLE DC = DISTURBED CORE SAMPLE
B: NO OF BLOWS B= NO OF BLOWS
DS = DISTURBED SAMPLE R= REFUSAL SECON
31
Borelogs
PROJECT : Geotechnical Investigations for Greenfield 'A' Warehousing Facility TYPE OF BORING : Rotary
CLIENT : Brit Logistics Pvt. Ltd. BORE HOLE DIA. : 150/76 mm
LOCATION : Dobaspet GWT : Not met
BORE HOLE NO. : BH 19 DATE OF COMMENCEMENT : 05.04.2023
CO-ORDINATES : E 744080.724 m, N 1459042.983 m DATE OF COMPLETION : 06.04.2023
RL(m) : 96.64 m
STANDARD PENETRATION TEST
NO. OF BLOWS FOR
DEPTH
FIELD TYPE OF ROCK DRILLING
BELOW PROFILE 'N'- REMARKS
CLASSIFICATION SAMPLING FIRST 15 NEXT 15 cm NEXT 15 cm
EGL (m) VALUE
cm (N1) (N2) (N3)
(N2 + N3)
CR (%) RQD (%)
0.50 DS DS Collected
1.00
SPT 6 7 11 19
Reddish Brown, Medium
2.00
Plastic, Very Stiff
,CLAYEY SILT WITH
3.00 UDS UDS Collected
CLAY (MI)
4.00
SPT 12 15 17 32
5.00
6.00 SPT 11 14 19 34
7.00
Greyish Brown, Hard,
SPT 15 18 23 41
Medium Plastic,
8.00
CLAYEY SILT (MI)
9.00 SPT 17 21 28 49
10.00
SPT 32 50B/ 20 cm N>100
11.00 Greyish Brown, Very
Dense, SOFT
12.00 DISINTEGRATED SPT 50B/ 2 cm R N>100 WS Collected
Greyish Brown,
13.00 COMPLETELY
RUN I 12.0 m to 13.5 m 11 Nil 3+3+5+6 = 17 cm
WEATHERED ROCK
(CWR)
14.00
RUN II 13.5 m to 15.0 m 14 11 4+17 = 21 cm
Greyish Brown, HIGHLY
15.00
WEATHERED ROCK
(HWR)
RUN II 15.0 m to 16.0 m 21 10 9+2+10 = 21 cm
16.00
BH 19 Terminated at 16.0m
SPT = STANDARD PENETRATION TEST UDS = UNDISTURBED SAMPLE DC = DISTURBED CORE SAMPLE
B: NO OF BLOWS B= NO OF BLOWS WS = WASH SAMPLE
DS = DISTURBED SAMPLE R= REFUSAL SECON
32
Annexure A1
PROJECT : Geotechnical Investigations for Greenfield 'A' Warehouse Facility
CLIENT : Brit Logistics Private Limited
ERT NO : ERT 1 Location ERT 1
Average Apparent
Direction of Electrode Resistance Apparent resistivity
ERT No Multiplier = 2 πa Resistivity
ERT test Spacing "a" (m) R (ohm) ρ= 2πaR (Ohm-m)
(Ohm-m)
33
PROJECT : Geotechnical Investigations for Greenfield 'A' Warehouse Facility
CLIENT : Brit Logistics Private Limited
ERT NO : ERT 2 Location ERT 2
Average Apparent
Direction of Electrode Resistance Apparent resistivity
ERT No Multiplier = 2 πa Resistivity
ERT test Spacing "a" (m) R (ohm) ρ= 2πaR (Ohm-m)
(Ohm-m)
34
ERT NO : ERT 1 Mean Resistivity = 43.88 Ohm-m
N
200
180
160
140
120
100
80
60
40
20
W E
200 180 160 140 120 100 80 60 40 20 20 40 60 80 100 120 140 160 180 200
20
40
60
80
100
120
140
160
180
200
S
Scale
Hor 1 cm=20 Ohm-m
Ver 1 cm=20 Ohm-m
35
ERT NO : ERT 2 Mean Resistivity = 112.30 Ohm-m
N
500
450
400
350
300
250
200
150
100
50
W E
500 450 400 350 300 250 200 150 100 50 50 100 150 200 250 300 350 400 450 500
50
100
150
200
250
300
350
400
450
500
S
Scale
Hor 1 cm=50 Ohm-m
Ver 1 cm=50 Ohm-m
36
Annexure A2
TRIAL PIT LOGS
PROJECT : Geotechnical Investigation for Greenfield 'A' Grade Warehousing Facility
CLIENT : Brit Logistics Private Limited SIZE OF PIT (m) : 1.0 x 1.0 x 1.0
TRIAL PIT NO. : TP 1 GWT (m) : Not met
LOCATION : Dobaspet RL (m) : 101.59 m
Co-ordinates : E 743485.786 m, N 1459027.652
THICKNESS
DEPTH BELOW GEOLOGICAL
PROFILE OF STRATA SAMPLE DETAILS REMARKS
EGL (m) CLASSIFICATION
(m)
TP 1 Terminated at 1.0 m
37
TRIAL PIT LOGS
PROJECT : Geotechnical Investigation for Greenfield 'A' Grade Warehousing Facility
CLIENT : Brit Logistics Private Limited SIZE OF PIT (m) : 1.0 x 1.0 x 1.0
TRIAL PIT NO. : TP 2 GWT (m) : Not met
LOCATION : Dobaspet RL (m) : 105.49 m
Co-ordinates : E 743958.836 m, N 1459217.708
THICKNESS
DEPTH BELOW GEOLOGICAL
PROFILE OF STRATA SAMPLE DETAILS REMARKS
EGL (m) CLASSIFICATION
(m)
TP 2 Terminated at 1.0 m
38
TRIAL PIT LOGS
PROJECT : Geotechnical Investigation for Greenfield 'A' Grade Warehousing Facility
CLIENT : Brit Logistics Private Limited SIZE OF PIT (m) : 1.0 x 1.0 x 1.0
TRIAL PIT NO. : TP 3 GWT (m) : Not met
LOCATION : Dobaspet RL (m) : 101.10 m
Co-ordinates : E 743717.095 m, N 1458987.968
THICKNESS
DEPTH BELOW GEOLOGICAL
PROFILE OF STRATA SAMPLE DETAILS REMARKS
EGL (m) CLASSIFICATION
(m)
TP 3 Terminated at 1.0 m
39
Annexure A3
PERCOLATION TEST RESULTS
(AS PER IS 2470 (Part 2) - 1985 (RA 2017)
Geotechnical Investigations for Greenfield 'A'
Name of the Project: Date of Testing: 07-04-2023
Warehousing Facility
Size of Percolation
Percolation Test No. PT 1 300 x 300 x 350
Pit (mm):
Size of Trial Pit (m): 1.0 x 1.0 x 1.0 Weather Condition: Dry
Water level below
Initial Water Differnce in Difference in Water Percolation Rate
Cycle Time (min) the percolation pit
Level (mm) Time (min) Level (mm) (min/mm)
top (mm)
1 0 150 0 0 150
30 150 78 30 72
60 150 115 30 35
2 90 150 4 30 146
120 150 38 30 112
150 150 80 30 70
180 150 112 30 38
3 210 150 41 30 109
240 150 88 30 62 1.20
40
PERCOLATION TEST RESULTS
(AS PER IS 2470 (Part 2) - 1985 (RA 2017)
Geotechnical Investigations for Greenfield 'A'
Name of the Project: Date of Testing: 06-04-2023
Warehousing Facility
Size of Percolation
Percolation Test No. PT 2 300 x 300 x 350
Pit (mm):
Size of Trial Pit (m): 1.0 x 1.0 x 1.0 Weather Condition: Dry
Water level below
Initial Water Differnce in Difference in Water Percolation Rate
Cycle Time (min) the percolation pit
Level (mm) Time (min) Level (mm) (min/mm)
top (mm)
1 0 150 0 0 150
30 150 70 30 80
60 150 104 30 46
90 150 136 30 14
2 120 150 8 30 142
150 150 25 30 125
180 150 50 30 100
210 150 70 30 80
240 150 82 30 68 1.20
41
PERCOLATION TEST RESULTS
(AS PER IS 2470 (Part 2) - 1985 (RA 2017)
Geotechnical Investigations for Greenfield 'A'
Name of the Project: Date of Testing: 06-04-2023
Warehousing Facility
Size of Percolation
Percolation Test No. PT 3 300 x 300 x 350
Pit (mm):
Size of Trial Pit (m): 1.0 x 1.0 x 1.0 Weather Condition: Dry
Water level below
Initial Water Differnce in Difference in Water Percolation Rate
Cycle Time (min) the percolation pit
Level (mm) Time (min) Level (mm) (min/mm)
top (mm)
0 150 0 0 150
30 150 52 30 98
60 150 70 30 80
90 150 91 30 59
120 150 103 30 47
150 150 115 30 35
180 150 128 30 22
210 150 137 30 13
240 150 145 30 5 1.20
42
SECON PRIVATE LIMITED
AN ISO-9001 : 2008 Certified Company
# 147, 7B Road, EPIP, Whitefield Bangalore 560066, India
Annexure B: Test Report TC-6433
Geotech Division - Secon
Issued To: Test Report No.: MS-2023-004
Private Limited, Bangalore TC643323000000014F
Dates of receipt of Soil samples: 08.04.2023 to 17.04.2023 Discipline - Mechanical Testing Date of Issue: 24.04.2023
Duration of Testing: 10.04.203 to 24.04.2023 Group - Clays & Soils Sample ID: 363, 363 A
Sample Condition: Good No. of Pages: 17
Direct Shear
(RA 2020)
NABL Accredited
Tested depth (m)
Sample Nature
NABL Accredited
Accredited
Accredited
NABL Accredited 2021) NABL
Accredited
Sand (%)
Plastic Limit
Liquid Limit
Cohesion
Gravel (%)
(kg/cm )
ø (DEG)
PI (%)
2
Medium
(%)
(%)
Silt (%) Clay (%)
Coarse
Fine
0.5 DS - 0 1 26 9 64
1.5 SPT MI 0 0 18 9 73 37 25 12 16
3.0 UDS MI 0 0 24 14 50 12 36 23 13 18 30 21.48 2.00 1.65 2.54 0.01 32
4.5 SPT MI 0 0 14 7 79 38 25 13 17
6.0 SPT MI 0 0 21 8 71 38 21 17 17
7.5 SPT MI 0 1 30 9 60 40 16 24 17
BH 2
9.0 SPT MI 1 3 34 5 57 37 NP NP 2.59
10.5 SPT MI 0 2 26 7 65 38 NP NP
12.0 SPT SDR 0 2 20 7 71
13.5 SPT SDR 0 3 35 7 55
15.0 SPT SDR 1 3 28 5 63
16.0 SPT SDR 0 2 33 10 55
Authorised Signatory
K.R.Lenin Page 1 of 17
Technical Manager
43
SECON PRIVATE LIMITED
AN ISO-9001 : 2008 Certified Company
# 147, 7B Road, EPIP, Whitefield Bangalore 560066, India
Annexure B: Test Report TC-6433
Geotech Division - Secon
Issued To: Test Report No.: MS-2023-004
Private Limited, Bangalore TC643323000000014F
Dates of receipt of Soil samples: 08.04.2023 to 17.04.2023 Discipline - Mechanical Testing Date of Issue: 24.04.2023
Duration of Testing: 10.04.203 to 24.04.2023 Group - Clays & Soils Sample ID: 363, 363 A
Sample Condition: Good No. of Pages: 17
Direct Shear
(RA 2020)
NABL Accredited
Tested depth (m)
Sample Nature
NABL Accredited
Accredited
Accredited
NABL Accredited 2021) NABL
Accredited
Sand (%)
Plastic Limit
Liquid Limit
Cohesion
Gravel (%)
(kg/cm )
ø (DEG)
PI (%)
2
Medium
(%)
(%)
Silt (%) Clay (%)
Coarse
Fine
0.5 DS - 0 0 27 11 62
1.5 SPT MI 0 3 20 2 75 42 26 16 22
3.0 UDS MI 0 0 24 6 54 16 41 25 16 19 40 17.98 2.55 2.16 2.57 0.08 30
4.5 SPT MI 0 0 20 10 70 43 27 16 21
6.0 SPT MI 0 1 9 5 85 43 33 10 21
7.5 SPT MI 0 3 24 5 68 44 27 17 18
BH 3
9.0 SPT MI 0 4 26 4 66 43 27 16 18 2.56
10.5 SPT MI 1 4 27 4 64 43 26 17 17
12.0 SPT MI 0 2 22 7 69 48 NP NP
13.5 SPT SDR 0 0 13 6 81
15.0 SPT SDR 0 1 17 7 75
16.0 SPT SDR 0 2 18 7 73
Authorised Signatory
K.R.Lenin Page 2 of 17
Technical Manager
44
SECON PRIVATE LIMITED
AN ISO-9001 : 2008 Certified Company
# 147, 7B Road, EPIP, Whitefield Bangalore 560066, India
Annexure B: Test Report TC-6433
Geotech Division - Secon
Issued To: Test Report No.: MS-2023-004
Private Limited, Bangalore TC643323000000014F
Dates of receipt of Soil samples: 08.04.2023 to 17.04.2023 Discipline - Mechanical Testing Date of Issue: 24.04.2023
Duration of Testing: 10.04.203 to 24.04.2023 Group - Clays & Soils Sample ID: 363, 363 A
Sample Condition: Good No. of Pages: 17
Direct Shear
(RA 2020)
NABL Accredited
Tested depth (m)
Sample Nature
NABL Accredited
Accredited
Accredited
NABL Accredited 2021) NABL
Accredited
Sand (%)
Plastic Limit
Liquid Limit
Cohesion
Gravel (%)
(kg/cm )
ø (DEG)
PI (%)
2
Medium
(%)
(%)
Silt (%) Clay (%)
Coarse
Fine
0.5 DS - 0 0 28 14 58
1.5 SPT MI 0 1 28 9 62 42 25 17 17
3.0 UDS MI 0 0 21 5 55 19 41 24 17 18 30 13.31 2.88 2.54 2.61 0.10 30
4.5 SPT MI 0 2 29 8 61 40 23 17 18
6.0 SPT MI 0 1 22 7 70 41 25 16 18
7.5 SPT MI 0 3 22 4 71 43 25 18
BH 4
9.0 SPT MI 0 2 23 10 65 41 23 18 2.60
10.5 SPT MI 0 3 25 4 68 40 25 15
12.0 SPT MI 0 4 31 4 61 40 23 17
13.5 SPT SDR 0 1 25 4 70
15.0 SPT SDR 0 4 23 3 70
16.0 SPT SDR 0 6 20 4 70
Authorised Signatory
K.R.Lenin Page 3 of 17
Technical Manager
45
SECON PRIVATE LIMITED
AN ISO-9001 : 2008 Certified Company
# 147, 7B Road, EPIP, Whitefield Bangalore 560066, India
Annexure B: Test Report TC-6433
Geotech Division - Secon
Issued To: Test Report No.: MS-2023-004
Private Limited, Bangalore TC643323000000014F
Dates of receipt of Soil samples: 08.04.2023 to 17.04.2023 Discipline - Mechanical Testing Date of Issue: 24.04.2023
Duration of Testing: 10.04.203 to 24.04.2023 Group - Clays & Soils Sample ID: 363, 363 A
Sample Condition: Good No. of Pages: 17
Direct Shear
(RA 2020)
NABL Accredited
Tested depth (m)
Sample Nature
NABL Accredited
Accredited
Accredited
NABL Accredited 2021) NABL
Accredited
Sand (%)
Plastic Limit
Liquid Limit
Cohesion
Gravel (%)
(kg/cm )
ø (DEG)
PI (%)
2
Medium
(%)
(%)
Silt (%) Clay (%)
Coarse
Fine
0.5 DS - 0 0 20 4 76
1.5 SPT MI 1 3 24 5 67 39 26 13 19
3.0 UDS MI 0 0 18 9 59 14 37 19 18 16 20 30.56 1.34 1.03 2.57 0.09 31
4.5 SPT MI 0 1 13 9 77 39 31 8 21
6.0 SPT MI 1 9 30 3 57 46 29 17 2.59
7.5 SPT MI 1 8 24 4 63 46 NP NP
BH 5
9.0 SPT MI 0 7 27 3 63 45 NP NP
10.5 SPT MI 0 5 26 3 66 51 NP NP
12.0 SPT SDR 1 4 24 5 66 49 NP NP
13.5 SPT SDR 0 1 17 4 78
15.0 SPT SDR 2 6 32 8 52
16.0 SPT SDR 1 5 22 4 68
Authorised Signatory
K.R.Lenin Page 4 of 17
Technical Manager
46
SECON PRIVATE LIMITED
AN ISO-9001 : 2008 Certified Company
# 147, 7B Road, EPIP, Whitefield Bangalore 560066, India
Annexure B: Test Report TC-6433
Geotech Division - Secon
Issued To: Test Report No.: MS-2023-004
Private Limited, Bangalore TC643323000000014F
Dates of receipt of Soil samples: 08.04.2023 to 17.04.2023 Discipline - Mechanical Testing Date of Issue: 24.04.2023
Duration of Testing: 10.04.203 to 24.04.2023 Group - Clays & Soils Sample ID: 363, 363 A
Sample Condition: Good No. of Pages: 17
Direct Shear
(RA 2020)
NABL Accredited
Tested depth (m)
Sample Nature
NABL Accredited
Accredited
Accredited
NABL Accredited 2021) NABL
Accredited
Sand (%)
Plastic Limit
Liquid Limit
Cohesion
Gravel (%)
(kg/cm )
ø (DEG)
PI (%)
2
Medium
(%)
(%)
Silt (%) Clay (%)
Coarse
Fine
0.5 DS - 0 0 25 8 67
1.5 SPT MH 0 0 3 4 93 57 NP NP
3.0 UDS MI 0 0 5 7 68 20 50 36 14 27 50 16.55 2.27 1.95 2.57 0.02 33
BH 6 4.5 SPT MH 0 1 8 10 81 56 NP NP
6.0 SPT MH 0 1 20 6 73 57 NP NP 2.57
7.5 SPT MH 1 2 27 11 59 52 NP NP
9.0 SPT SDR 1 3 29 12 55
0.5 DS - 0 1 29 14 56
1.5 SPT MI 0 0 6 3 91 48 28 20 24
BH 7
3.0 UDS MI 0 0 7 12 61 20 45 28 17 25 40 18.67 3.00 2.53 2.68 0.08 30
4.5 SPT MI 0 0 6 8 86 48 32 16 26
Authorised Signatory
K.R.Lenin Page 5 of 17
Technical Manager
47
SECON PRIVATE LIMITED
AN ISO-9001 : 2008 Certified Company
# 147, 7B Road, EPIP, Whitefield Bangalore 560066, India
Annexure B: Test Report TC-6433
Geotech Division - Secon
Issued To: Test Report No.: MS-2023-004
Private Limited, Bangalore TC643323000000014F
Dates of receipt of Soil samples: 08.04.2023 to 17.04.2023 Discipline - Mechanical Testing Date of Issue: 24.04.2023
Duration of Testing: 10.04.203 to 24.04.2023 Group - Clays & Soils Sample ID: 363, 363 A
Sample Condition: Good No. of Pages: 17
Direct Shear
(RA 2020)
NABL Accredited
Tested depth (m)
Sample Nature
NABL Accredited
Accredited
Accredited
NABL Accredited 2021) NABL
Accredited
Sand (%)
Plastic Limit
Liquid Limit
Cohesion
Gravel (%)
(kg/cm )
ø (DEG)
PI (%)
2
Medium
(%)
(%)
Silt (%) Clay (%)
Coarse
Fine
6.0 SPT MI 0 0 6 7 87 47 32 15 28
7.5 SPT MI 0 1 11 3 85 48 NP NP
9.0 SPT MI 0 2 24 7 67 50 NP NP 2.59
10.5 SPT MI 0 3 29 8 60 49 NP NP
BH 7
12.0 SPT SDR 0 3 24 8 65
13.5 SPT SDR 0 5 32 11 52
15.0 SPT SDR 0 1 21 8 70
16.0 SPT SDR 1 2 27 7 63
0.5 DS - 0 1 33 11 55
1.5 SPT MI 1 3 33 5 58 41 21 20 19
BH 08
3.0 UDS MI 0 2 31 7 48 12 40 21 19 17 40 14.06 2.14 1.88 2.58 0.09 29
4.5 SPT MI 0 1 22 7 70 41 23 18 18
Authorised Signatory
K.R.Lenin Page 6 of 17
Technical Manager
48
SECON PRIVATE LIMITED
AN ISO-9001 : 2008 Certified Company
# 147, 7B Road, EPIP, Whitefield Bangalore 560066, India
Annexure B: Test Report TC-6433
Geotech Division - Secon
Issued To: Test Report No.: MS-2023-004
Private Limited, Bangalore TC643323000000014F
Dates of receipt of Soil samples: 08.04.2023 to 17.04.2023 Discipline - Mechanical Testing Date of Issue: 24.04.2023
Duration of Testing: 10.04.203 to 24.04.2023 Group - Clays & Soils Sample ID: 363, 363 A
Sample Condition: Good No. of Pages: 17
Direct Shear
(RA 2020)
NABL Accredited
Tested depth (m)
Sample Nature
NABL Accredited
Accredited
Accredited
NABL Accredited 2021) NABL
Accredited
Sand (%)
Plastic Limit
Liquid Limit
Cohesion
Gravel (%)
(kg/cm )
ø (DEG)
PI (%)
2
Medium
(%)
(%)
Silt (%) Clay (%)
Coarse
Fine
6.0 SPT MI 0 2 18 2 78 39 NP NP
7.5 SPT MI 0 2 33 11 54 39 NP NP
9.0 SPT MI 0 2 29 6 63 38 NP NP 2.60
10.5 SPT MI 0 1 33 9 57 44 NP NP
BH 08
12.0 SPT SDR 0 2 35 7 56
13.5 SPT SDR 0 1 37 9 53
15.0 SPT SDR 0 1 42 13 44
16.0 SPT SDR 0 2 38 7 53
0.5 DS - 10 5 31 5 49
1.5 SPT MI 0 2 31 9 58 35 16 19 18
BH 09
3.0 UDS MI 0 0 16 7 59 18 37 18 19 20 20 18.76 2.09 1.77 2.60 0.06 30
4.5 SPT MI 2 5 31 5 57 34 16 18 16
Authorised Signatory
K.R.Lenin Page 7 of 17
Technical Manager
49
SECON PRIVATE LIMITED
AN ISO-9001 : 2008 Certified Company
# 147, 7B Road, EPIP, Whitefield Bangalore 560066, India
Annexure B: Test Report TC-6433
Geotech Division - Secon
Issued To: Test Report No.: MS-2023-004
Private Limited, Bangalore TC643323000000014F
Dates of receipt of Soil samples: 08.04.2023 to 17.04.2023 Discipline - Mechanical Testing Date of Issue: 24.04.2023
Duration of Testing: 10.04.203 to 24.04.2023 Group - Clays & Soils Sample ID: 363, 363 A
Sample Condition: Good No. of Pages: 17
Direct Shear
(RA 2020)
NABL Accredited
Tested depth (m)
Sample Nature
NABL Accredited
Accredited
Accredited
NABL Accredited 2021) NABL
Accredited
Sand (%)
Plastic Limit
Liquid Limit
Cohesion
Gravel (%)
(kg/cm )
ø (DEG)
PI (%)
2
Medium
(%)
(%)
Silt (%) Clay (%)
Coarse
Fine
6.0 SPT MI 1 3 30 7 59 46 24 22
7.5 SPT MI 2 4 27 4 63 39 NP NP 2.58
9.0 SPT MI 1 2 28 5 64 39 NP NP
10.5 SPT MI 0 2 27 8 63 43 NP NP
BH 09
12.0 SPT MI 0 0 22 10 68 38 NP NP
13.5 SPT MI 0 1 24 11 64 43 NP NP
15.0 SPT SDR 4 1 18 8 69
16.0 SPT SDR 5 7 28 6 54
0.5 DS - 0 0 26 7 67
1.5 SPT MI 0 4 25 6 65 40 18 22 18
BH 10
3.0 UDS MI 1 5 24 5 48 17 47 24 23 20 50 19.93 1.94 1.62 2.61 0.06 30
4.5 SPT MI 0 6 30 8 56 44 NP NP
Authorised Signatory
K.R.Lenin Page 8 of 17
Technical Manager
50
SECON PRIVATE LIMITED
AN ISO-9001 : 2008 Certified Company
# 147, 7B Road, EPIP, Whitefield Bangalore 560066, India
Annexure B: Test Report TC-6433
Geotech Division - Secon
Issued To: Test Report No.: MS-2023-004
Private Limited, Bangalore TC643323000000014F
Dates of receipt of Soil samples: 08.04.2023 to 17.04.2023 Discipline - Mechanical Testing Date of Issue: 24.04.2023
Duration of Testing: 10.04.203 to 24.04.2023 Group - Clays & Soils Sample ID: 363, 363 A
Sample Condition: Good No. of Pages: 17
Direct Shear
(RA 2020)
NABL Accredited
Tested depth (m)
Sample Nature
NABL Accredited
Accredited
Accredited
NABL Accredited 2021) NABL
Accredited
Sand (%)
Plastic Limit
Liquid Limit
Cohesion
Gravel (%)
(kg/cm )
ø (DEG)
PI (%)
2
Medium
(%)
(%)
Silt (%) Clay (%)
Coarse
Fine
6.0 SPT MI 1 8 31 5 55 43 NP NP
7.5 SPT MI 2 6 28 3 61 44 NP NP
9.0 SPT MI 2 8 33 8 49 42 NP NP
10.5 SPT MI 4 8 28 7 53 41 NP NP 2.59
BH 10
12.0 SPT SDR 4 6 31 11 48
13.5 SPT SDR 1 4 26 8 61
15.0 SPT SDR 2 3 21 9 65
16.0 SPT SDR 3 8 29 6 54
0.5 DS - 0 1 44 20 35
1.5 SPT MI 3 9 44 13 31 45 21 24 24
BH 11
3.0 UDS MI 1 4 28 5 50 12 38 21 17 18 20 15.95 1.19 1.03 2.58 0.08 30
4.5 SPT MI 0 6 30 10 54 45 25 20 23
Authorised Signatory
K.R.Lenin Page 9 of 17
Technical Manager
51
SECON PRIVATE LIMITED
AN ISO-9001 : 2008 Certified Company
# 147, 7B Road, EPIP, Whitefield Bangalore 560066, India
Annexure B: Test Report TC-6433
Geotech Division - Secon
Issued To: Test Report No.: MS-2023-004
Private Limited, Bangalore TC643323000000014F
Dates of receipt of Soil samples: 08.04.2023 to 17.04.2023 Discipline - Mechanical Testing Date of Issue: 24.04.2023
Duration of Testing: 10.04.203 to 24.04.2023 Group - Clays & Soils Sample ID: 363, 363 A
Sample Condition: Good No. of Pages: 17
Direct Shear
(RA 2020)
NABL Accredited
Tested depth (m)
Sample Nature
NABL Accredited
Accredited
Accredited
NABL Accredited 2021) NABL
Accredited
Sand (%)
Plastic Limit
Liquid Limit
Cohesion
Gravel (%)
(kg/cm )
ø (DEG)
PI (%)
2
Medium
(%)
(%)
Silt (%) Clay (%)
Coarse
Fine
6.0 SPT MI 1 5 32 12 50 44 NP NP 23
7.5 SPT MI 1 4 27 13 55 40 NP NP
9.0 SPT MI 1 4 34 16 45 39 NP NP 2.57
10.5 SPT MI 2 8 42 12 36 38 NP NP
BH 11
12.0 SPT MI 1 7 41 17 34 39 NP NP
13.5 SPT SDR 3 9 41 12 35
15.0 SPT SDR 3 15 42 14 26
16.0 SPT SDR 6 6 26 11 51
0.5 SPT - 1 4 32 6 57
1.5 SPT MI 0 2 24 6 68 39 20 19 19
BH 12
3.0 UDS MI 1 2 22 5 54 16 47 25 22 21 40 15.10 1.84 1.60 2.58 0.06 30
4.5 SPT MI 0 2 24 4 70 47 NP NP
Authorised Signatory
K.R.Lenin Page 10 of 17
Technical Manager
52
SECON PRIVATE LIMITED
AN ISO-9001 : 2008 Certified Company
# 147, 7B Road, EPIP, Whitefield Bangalore 560066, India
Annexure B: Test Report TC-6433
Geotech Division - Secon
Issued To: Test Report No.: MS-2023-004
Private Limited, Bangalore TC643323000000014F
Dates of receipt of Soil samples: 08.04.2023 to 17.04.2023 Discipline - Mechanical Testing Date of Issue: 24.04.2023
Duration of Testing: 10.04.203 to 24.04.2023 Group - Clays & Soils Sample ID: 363, 363 A
Sample Condition: Good No. of Pages: 17
Direct Shear
(RA 2020)
NABL Accredited
Tested depth (m)
Sample Nature
NABL Accredited
Accredited
Accredited
NABL Accredited 2021) NABL
Accredited
Sand (%)
Plastic Limit
Liquid Limit
Cohesion
Gravel (%)
(kg/cm )
ø (DEG)
PI (%)
2
Medium
(%)
(%)
Silt (%) Clay (%)
Coarse
Fine
6.0 SPT MI 0 2 28 4 66 48 NP NP 2.56
BH 12 7.5 SPT SDR 2 5 30 12 51
9.0 SPT SDR 0 1 76 8 15
0.5 DS - 0 2 33 9 56
1.5 SPT MI 1 3 27 6 63 41 21 20 18
3.0 UDS MI 1 2 23 6 52 16 43 22 21 19 40 12.46 1.96 1.74 2.58 0.10 29
4.5 SPT MI 1 4 25 5 65 45 NP NP
BH 13 6.0 SPT MI 1 5 25 4 65 46 NP NP
7.5 SPT MI 0 4 24 8 64 48 NP NP
9.0 SPT MI 0 1 13 5 81 36 NP NP 2.59
10.5 SPT MI 0 3 29 8 60 45 NP NP
12.0 SPT MI 0 2 28 7 63
Authorised Signatory
K.R.Lenin Page 11 of 17
Technical Manager
53
SECON PRIVATE LIMITED
AN ISO-9001 : 2008 Certified Company
# 147, 7B Road, EPIP, Whitefield Bangalore 560066, India
Annexure B: Test Report TC-6433
Geotech Division - Secon
Issued To: Test Report No.: MS-2023-004
Private Limited, Bangalore TC643323000000014F
Dates of receipt of Soil samples: 08.04.2023 to 17.04.2023 Discipline - Mechanical Testing Date of Issue: 24.04.2023
Duration of Testing: 10.04.203 to 24.04.2023 Group - Clays & Soils Sample ID: 363, 363 A
Sample Condition: Good No. of Pages: 17
Direct Shear
(RA 2020)
NABL Accredited
Tested depth (m)
Sample Nature
NABL Accredited
Accredited
Accredited
NABL Accredited 2021) NABL
Accredited
Sand (%)
Plastic Limit
Liquid Limit
Cohesion
Gravel (%)
(kg/cm )
ø (DEG)
PI (%)
2
Medium
(%)
(%)
Silt (%) Clay (%)
Coarse
Fine
13.5 SPT SDR 1 2 20 7 70
BH 13 15.0 SPT SDR 0 0 24 7 69
16.0 SPT SDR 0 1 22 4 73
0.5 DS - 0 2 29 7 62
1.5 SPT MI 0 2 22 5 71 45 25 20 19
3.0 UDS MI 0 3 26 5 51 15 42 22 20 15 30 15.45 2.16 1.87 2.59 0.06 31
4.5 SPT MI 0 2 20 5 73 43 27 16 19
BH 14 6.0 SPT MI 2 5 24 4 65 41 26 15 2.59
7.5 SPT MI 17 8 24 6 45 42 NP NP
9.0 SPT MI 0 3 34 8 55 41 NP NP
10.5 SPT MI 0 2 28 7 63 41 NP NP
12.0 SPT SDR 0 2 37 8 53
Authorised Signatory
K.R.Lenin Page 12 of 17
Technical Manager
54
SECON PRIVATE LIMITED
AN ISO-9001 : 2008 Certified Company
# 147, 7B Road, EPIP, Whitefield Bangalore 560066, India
Annexure B: Test Report TC-6433
Geotech Division - Secon
Issued To: Test Report No.: MS-2023-004
Private Limited, Bangalore TC643323000000014F
Dates of receipt of Soil samples: 08.04.2023 to 17.04.2023 Discipline - Mechanical Testing Date of Issue: 24.04.2023
Duration of Testing: 10.04.203 to 24.04.2023 Group - Clays & Soils Sample ID: 363, 363 A
Sample Condition: Good No. of Pages: 17
Direct Shear
(RA 2020)
NABL Accredited
Tested depth (m)
Sample Nature
NABL Accredited
Accredited
Accredited
NABL Accredited 2021) NABL
Accredited
Sand (%)
Plastic Limit
Liquid Limit
Cohesion
Gravel (%)
(kg/cm )
ø (DEG)
PI (%)
2
Medium
(%)
(%)
Silt (%) Clay (%)
Coarse
Fine
13.5 SPT SDR 0 3 29 8 60
BH 14 15.0 SPT SDR 0 2 18 5 75
16.0 SPT SDR 0 1 13 3 83
0.5 DS - 1 1 46 32 20
1.5 SPT MI 1 8 35 14 42 42 24 18 17
3.0 UDS MI 6 10 28 4 40 12 37 19 18 16 30 13.28 2.26 1.99 2.58 0.06 30
4.5 SPT MI 0 3 23 12 62 42 25 17 21
BH 15 6.0 SPT MI 0 4 29 13 54 44 NP NP
7.5 SPT MI 1 4 31 15 49 43 NP NP
9.0 SPT MI 0 2 32 15 51 43 NP NP 2.58
10.5 SPT MI 0 3 30 13 54 40 NP NP
12.0 SPT SDR 0 7 34 14 45 39 NP NP
Authorised Signatory
K.R.Lenin Page 13 of 17
Technical Manager
55
SECON PRIVATE LIMITED
AN ISO-9001 : 2008 Certified Company
# 147, 7B Road, EPIP, Whitefield Bangalore 560066, India
Annexure B: Test Report TC-6433
Geotech Division - Secon
Issued To: Test Report No.: MS-2023-004
Private Limited, Bangalore TC643323000000014F
Dates of receipt of Soil samples: 08.04.2023 to 17.04.2023 Discipline - Mechanical Testing Date of Issue: 24.04.2023
Duration of Testing: 10.04.203 to 24.04.2023 Group - Clays & Soils Sample ID: 363, 363 A
Sample Condition: Good No. of Pages: 17
Direct Shear
(RA 2020)
NABL Accredited
Tested depth (m)
Sample Nature
NABL Accredited
Accredited
Accredited
NABL Accredited 2021) NABL
Accredited
Sand (%)
Plastic Limit
Liquid Limit
Cohesion
Gravel (%)
(kg/cm )
ø (DEG)
PI (%)
2
Medium
(%)
(%)
Silt (%) Clay (%)
Coarse
Fine
13.5 SPT SDR 0 6 38 11 45
BH 15 15.0 SPT SDR 5 6 26 14 49
16.0 SPT SDR 3 6 28 19 44
0.5 DS - 0 0 27 20 53
1.5 SPT MI 0 2 31 7 60 36 19 17 17
3.0 UDS MI 0 1 24 8 52 15 37 18 19 16 20 11.82 2.27 2.03 2.54 0.08 29
4.5 SPT MI 5 1 24 4 66 36 26 10 17
BH 16 6.0 SPT MI 0 2 22 6 70 36 25 11 17
7.5 SPT MI 0 1 17 8 74 53 NP NP
9.0 SPT MI 0 1 23 13 63 36 24 12 2.60
10.5 SPT MI 0 0 14 7 79 57 NP NP
12.0 SPT MI 9 8 35 9 39 57 NP NP
Authorised Signatory
K.R.Lenin Page 14 of 17
Technical Manager
56
SECON PRIVATE LIMITED
AN ISO-9001 : 2008 Certified Company
# 147, 7B Road, EPIP, Whitefield Bangalore 560066, India
Annexure B: Test Report TC-6433
Geotech Division - Secon
Issued To: Test Report No.: MS-2023-004
Private Limited, Bangalore TC643323000000014F
Dates of receipt of Soil samples: 08.04.2023 to 17.04.2023 Discipline - Mechanical Testing Date of Issue: 24.04.2023
Duration of Testing: 10.04.203 to 24.04.2023 Group - Clays & Soils Sample ID: 363, 363 A
Sample Condition: Good No. of Pages: 17
Direct Shear
(RA 2020)
NABL Accredited
Tested depth (m)
Sample Nature
NABL Accredited
Accredited
Accredited
NABL Accredited 2021) NABL
Accredited
Sand (%)
Plastic Limit
Liquid Limit
Cohesion
Gravel (%)
(kg/cm )
ø (DEG)
PI (%)
2
Medium
(%)
(%)
Silt (%) Clay (%)
Coarse
Fine
13.5 SPT SDR 0 0 15 3 82
BH 16 15.0 SPT SDR 0 2 36 7 55
16.0 SPT SDR 0 1 30 10 59
0.5 DS - 1 3 35 7 54
1.5 SPT MI 1 4 36 7 52 38 20 18 17
3.0 UDS MI 1 5 35 7 43 9 34 14 20 19 20 14.20 2.26 1.98 2.62 0.04 32
4.5 SPT MI 7 3 27 9 54 38 21 17 17
BH 17 6.0 SPT MI 0 2 30 11 57 42 26 16 18
7.5 SPT SDR 1 5 35 8 51
9.0 SPT SDR 0 6 39 9 46
10.5 SPT SDR 0 3 34 7 56
12.0 SPT SDR 1 5 36 10 48
Authorised Signatory
K.R.Lenin Page 15 of 17
Technical Manager
57
SECON PRIVATE LIMITED
AN ISO-9001 : 2008 Certified Company
# 147, 7B Road, EPIP, Whitefield Bangalore 560066, India
Annexure B: Test Report TC-6433
Geotech Division - Secon
Issued To: Test Report No.: MS-2023-004
Private Limited, Bangalore TC643323000000014F
Dates of receipt of Soil samples: 08.04.2023 to 17.04.2023 Discipline - Mechanical Testing Date of Issue: 24.04.2023
Duration of Testing: 10.04.203 to 24.04.2023 Group - Clays & Soils Sample ID: 363, 363 A
Sample Condition: Good No. of Pages: 17
Direct Shear
(RA 2020)
NABL Accredited
Tested depth (m)
Sample Nature
NABL Accredited
Accredited
Accredited
NABL Accredited 2021) NABL
Accredited
Sand (%)
Plastic Limit
Liquid Limit
Cohesion
Gravel (%)
(kg/cm )
ø (DEG)
PI (%)
2
Medium
(%)
(%)
Silt (%) Clay (%)
Coarse
Fine
13.5 SPT SDR 0 2 32 8 58
BH 17 15.0 SPT SDR 0 0 27 9 64
16.0 SPT SDR 1 2 33 14 50
0.5 DS - 1 4 32 6 57
1.5 SPT MI 0 1 27 5 67 44 NP NP
3.0 UDS MI 0 2 28 5 48 17 46 24 22 22 50 16.28 1.89 1.63 2.61 0.03 32
4.5 SPT MI 0 1 24 4 71 43 NP NP
BH 18 6.0 SPT MI 0 3 28 6 63 44 NP NP
7.5 SPT MI 0 3 22 5 70 48 NP NP
9.0 SPT MI 1 1 32 6 60 46 NP NP 2.60
10.5 SPT SDR 1 2 27 7 63
12.0 SPT SDR 1 2 29 5 63
Authorised Signatory
K.R.Lenin Page 16 of 17
Technical Manager
58
SECON PRIVATE LIMITED
AN ISO-9001 : 2008 Certified Company
# 147, 7B Road, EPIP, Whitefield Bangalore 560066, India
Annexure B: Test Report TC-6433
Geotech Division - Secon
Issued To: Test Report No.: MS-2023-004
Private Limited, Bangalore TC643323000000014F
Dates of receipt of Soil samples: 08.04.2023 to 17.04.2023 Discipline - Mechanical Testing Date of Issue: 24.04.2023
Duration of Testing: 10.04.203 to 24.04.2023 Group - Clays & Soils Sample ID: 363, 363 A
Sample Condition: Good No. of Pages: 17
Direct Shear
(RA 2020)
NABL Accredited
Tested depth (m)
Sample Nature
NABL Accredited
Accredited
Accredited
NABL Accredited 2021) NABL
Accredited
Sand (%)
Plastic Limit
Liquid Limit
Cohesion
Gravel (%)
(kg/cm )
ø (DEG)
PI (%)
2
Medium
(%)
(%)
Silt (%) Clay (%)
Coarse
Fine
0.5 DS - 1 0 26 11 62
1.5 SPT MI 0 1 16 4 79 40 23 17 19
3.0 UDS MI 0 2 20 5 56 17 40 20 20 17 40 14.36 1.99 1.74 2.52 0.04 31
4.5 SPT MI 0 1 16 6 77 40 25 15 18
BH 19 6.0 SPT MI 0 1 7 4 88 37 27 10 20
7.5 SPT MI 1 4 26 4 65 42 NP NP
9.0 SPT MI 0 3 34 6 57 43 NP NP 2.59
10.5 SPT SDR 4 4 35 8 49 41 NP NP
12.0 SPT SDR 0 2 73 8 17
110.0
100.0
90.0
80.0
70.0
Percentage Finer (%)
60.0
50.0
40.0
30.0
BH 2@3m
20.0
10.0 BH 2@4.5m
0.0
0.002
0.075
0.425
4.750
2.000
0.001 0.010 0.100 1.000 10.000
Particle Size (in mm)
110.0
100.0
90.0
80.0
70.0
60.0
50.0
Percentage Finer (%)
40.0
30.0
20.0 BH 3@3m
10.0
BH 3@4.5m
0.0
0.075
0.002
2.000
4.750
0.425
110.0
100.0
90.0
80.0
70.0
60.0
50.0
Percentage Finer (%)
40.0
30.0
20.0 BH 4@3m
10.0
BH 4@4.5m
0.0
0.075
0.002
2.000
4.750
0.425
60
PROJECT : Geotechnical Investigations for Greenfield 'A' Warehouse Facility
110.0
100.0
90.0
80.0
70.0
Percentage Finer (%)
60.0
50.0
40.0
30.0
20.0 BH 5@3m
10.0 BH 5@4.5m
0.0
0.002
0.075
0.425
4.750
2.000
0.001 0.010 0.100 1.000 10.000
Particle Size (in mm)
110.0
100.0
90.0
80.0
70.0
60.0
50.0
Percentage Finer (%)
40.0
30.0
20.0 BH 6@3m
10.0
BH 6@4.5m
0.0
0.075
0.002
2.000
4.750
0.425
110.0
100.0
90.0
80.0
70.0
60.0
50.0
Percentage Finer (%)
40.0
30.0
20.0 BH 7@3m
BH 7@4.5m
10.0
0.0
0.075
0.002
2.000
4.750
0.425
61
PROJECT : Geotechnical Investigations for Greenfield 'A' Warehouse Facility
110.0
100.0
90.0
80.0
70.0
Percentage Finer (%)
60.0
50.0
40.0
30.0
20.0 BH 8@3m
10.0 BH 8@4.5m
0.0
0.002
0.075
0.425
4.750
2.000
0.001 0.010 0.100 1.000 10.000
Particle Size (in mm)
110.0
100.0
90.0
80.0
70.0
60.0
50.0
Percentage Finer (%)
40.0
30.0
20.0 BH 9@3m
10.0 BH 9@4.5m
0.0
0.075
0.002
2.000
4.750
0.425
110.0
100.0
90.0
80.0
70.0
60.0
50.0
Percentage Finer (%)
40.0
30.0
20.0 BH 10@3m
BH 10@4.5m
10.0
0.0
0.075
0.002
2.000
4.750
0.425
62
PROJECT : Geotechnical Investigations for Greenfield 'A' Warehouse Facility
110.0
100.0
90.0
80.0
70.0
Percentage Finer (%)
60.0
50.0
40.0
30.0
20.0 BH 11@3m
10.0 BH 11@4.5m
0.0
0.002
0.075
0.425
4.750
2.000
0.001 0.010 0.100 1.000 10.000
Particle Size (in mm)
110.0
100.0
90.0
80.0
70.0
60.0
50.0
Percentage Finer (%)
40.0
30.0
20.0 BH 12@3m
10.0 BH 12@4.5m
0.0
0.075
0.002
2.000
4.750
0.425
110.0
100.0
90.0
80.0
70.0
60.0
50.0
Percentage Finer (%)
40.0
30.0
20.0 BH 13@3m
BH 13@4.5m
10.0
0.0
0.075
2.000
0.002
4.750
0.425
63
PROJECT : Geotechnical Investigations for Greenfield 'A' Warehouse Facility
110.0
100.0
90.0
80.0
70.0
Percentage Finer (%)
60.0
50.0
40.0
30.0
20.0 BH 14@3m
10.0 BH 14@4.5m
0.0
0.002
0.075
0.425
4.750
2.000
0.001 0.010 0.100 1.000 10.000
Particle Size (in mm)
110.0
100.0
90.0
80.0
70.0
60.0
50.0
Percentage Finer (%)
40.0
30.0
20.0 BH 15@3m
10.0 BH 15@4.5m
0.0
0.075
0.002
2.000
4.750
0.425
110.0
100.0
90.0
80.0
70.0
60.0
50.0
Percentage Finer (%)
40.0
30.0
20.0 BH 16@3m
BH 16@4.5m
10.0
0.0
0.075
0.002
2.000
4.750
0.425
64
PROJECT : Geotechnical Investigations for Greenfield 'A' Warehouse Facility
110.0
100.0
90.0
80.0
70.0
Percentage Finer (%)
60.0
50.0
40.0
30.0
20.0
BH 17@3m
10.0
BH 17@4.5m
0.0
0.002
0.075
0.425
4.750
2.000
0.001 0.010 0.100 1.000 10.000
Particle Size (in mm)
110.0
100.0
90.0
80.0
70.0
60.0
50.0
Percentage Finer (%)
40.0
30.0
20.0 BH 18@3m
10.0 BH 18@4.5m
0.0
0.075
0.002
2.000
4.750
0.425
110.0
100.0
90.0
80.0
70.0
60.0
50.0
Percentage Finer (%)
40.0
30.0
20.0 BH 19@3m
BH 19@4.5m
10.0
0.0
0.075
2.000
0.002
4.750
0.425
65
Annexure B2
DIRECT SHEAR TEST (UU TYPE)
Name of Project Geotechnical Investigations for Greenfield 'A' Warehousing Facility
Client Brit Logistics Pvt. Ltd.
Location Dobaspet, Bangalore
Date of Test 22-04-2023
Borehole No. BH 2 H (mm) L X B (mm) A (cm2) V (cm3)
Depth (m) 3.0 25.00 60 x 60 36.00 90.00
Test 1 Test 2 Test 3
Shear Shear Shear
Applied Applied Applied
Horizontal Corrected Stress Corrected Stress Corrected Stress
Load 'P' Load 'P' Load 'P'
Deformation (cm) Area A(cm²) σ Area A(cm²) σ Area A(cm²) σ
(kg) (kg) (kg)
(kg/cm2) (kg/cm2) (kg/cm2)
0 0.00 36.00 0.00 0.00 36.00 0.00 0.00 36.00 0.00
0.05 4.25 35.70 0.12 6.50 35.70 0.18 10.25 35.70 0.29
0.1 5.25 35.40 0.15 9.00 35.40 0.25 14.75 35.40 0.42
0.15 6.25 35.10 0.18 11.25 35.10 0.32 17.75 35.10 0.51
0.2 7.00 34.80 0.20 13.00 34.80 0.37 20.00 34.80 0.57
0.25 7.75 34.50 0.22 14.50 34.50 0.42 22.25 34.50 0.64
0.3 8.25 34.20 0.24 15.75 34.20 0.46 24.00 34.20 0.70
0.35 8.75 33.90 0.26 16.75 33.90 0.49 25.25 33.90 0.74
0.4 9.25 33.60 0.28 18.00 33.60 0.54 26.50 33.60 0.79
0.45 9.75 33.30 0.29 18.50 33.30 0.56 27.50 33.30 0.83
0.5 10.25 33.00 0.31 18.75 33.00 0.57 28.25 33.00 0.86
0.55 10.50 32.70 0.32 19.00 32.70 0.58 28.75 32.70 0.88
0.6 10.75 32.40 0.33 19.25 32.40 0.59 29.25 32.40 0.90
0.65 10.75 32.10 0.33 19.50 32.10 0.61 29.50 32.10 0.92
0.7 10.75 31.80 0.34 19.50 31.80 0.61 29.75 31.80 0.94
0.75 19.50 31.50 0.62 30.00 31.50 0.95
0.8 30.00 31.20 0.96
0.85 30.00 30.90 0.97
0.9
Normal Stress 'σ'
Shear Stress 'δ' ( kg/cm2)
(kg/cm2)
0.34 0.5
0.62 1.0 c ( kg/cm2) φ (Deg)
0.97 1.5 0.01 32
Stress Curve
1.2
Shear Stress (kg/cm2)
1.0
0.8
0.6
0.4
0.2
0.0
0.0 0.5 1.0 1.5 2.0
Normal stress (kg/cm2)
`
66
DIRECT SHEAR TEST (UU TYPE)
Name of Project Geotechnical Investigations for Greenfield 'A' Warehousing Facility
Client Brit Logistics Pvt. Ltd.
Location Dobaspet, Bangalore
Date of Test 22-04-2023
Borehole No. BH 3 H (mm) L X B (mm) A (cm2) V (cm3)
Depth (m) 3.0 25.00 60 x 60 36.00 90.00
Test 1 Test 2 Test 3
Shear Shear Shear
Applied Applied Applied
Horizontal Corrected Stress Corrected Stress Corrected Stress
Load 'P' Load 'P' Load 'P'
Deformation (cm) Area A(cm²) σ Area A(cm²) σ Area A(cm²) σ
(kg) (kg) (kg)
(kg/cm2) (kg/cm2) (kg/cm2)
0 0.00 36.00 0.00 0.00 36.00 0.00 0.00 36.00 0.00
0.05 5.25 35.70 0.15 8.00 35.70 0.22 12.75 35.70 0.36
0.1 7.50 35.40 0.21 11.25 35.40 0.32 16.50 35.40 0.47
0.15 8.75 35.10 0.25 14.25 35.10 0.41 19.50 35.10 0.56
0.2 9.75 34.80 0.28 15.00 34.80 0.43 21.50 34.80 0.62
0.25 10.75 34.50 0.31 16.00 34.50 0.46 23.25 34.50 0.67
0.3 11.25 34.20 0.33 17.00 34.20 0.50 24.50 34.20 0.72
0.35 11.50 33.90 0.34 17.75 33.90 0.52 25.75 33.90 0.76
0.4 11.75 33.60 0.35 18.25 33.60 0.54 26.50 33.60 0.79
0.45 12.00 33.30 0.36 18.75 33.30 0.56 27.25 33.30 0.82
0.5 12.00 33.00 0.36 19.50 33.00 0.59 27.75 33.00 0.84
0.55 12.00 32.70 0.37 20.00 32.70 0.61 28.25 32.70 0.86
0.6 20.25 32.40 0.63 28.50 32.40 0.88
0.65 20.50 32.10 0.64 28.75 32.10 0.90
0.7 20.75 31.80 0.65 29.00 31.80 0.91
0.75 20.75 31.50 0.66 29.25 31.50 0.93
0.8 29.25 31.20 0.94
0.85 29.25 30.90 0.95
0.9
Normal Stress 'σ'
Shear Stress 'δ' ( kg/cm2)
(kg/cm2)
0.37 0.5
0.66 1.0 c ( kg/cm2) φ (Deg)
0.95 1.5 0.08 30
Stress Curve
1.0
Shear Stress (kg/cm2)
0.8
0.6
0.4
0.2
0.0
0.0 0.5 1.0 1.5 2.0
Normal stress (kg/cm2)
`
67
DIRECT SHEAR TEST (UU TYPE)
Name of Project Geotechnical Investigations for Greenfield 'A' Warehousing Facility
Client Brit Logistics Pvt. Ltd.
Location Dobaspet, Bangalore
Date of Test 22-04-2023
Borehole No. BH 4 H (mm) L X B (mm) A (cm2) V (cm3)
Depth (m) 3.0 25.00 60 x 60 36.00 90.00
Test 1 Test 2 Test 3
Shear Shear Shear
Applied Applied Applied
Horizontal Corrected Stress Corrected Stress Corrected Stress
Load 'P' Load 'P' Load 'P'
Deformation (cm) Area A(cm²) σ Area A(cm²) σ Area A(cm²) σ
(kg) (kg) (kg)
(kg/cm2) (kg/cm2) (kg/cm2)
0 0.00 36.00 0.00 0.00 36.00 0.00 0.00 36.00 0.00
0.05 3.75 35.70 0.11 7.00 35.70 0.20 10.00 35.70 0.28
0.1 5.25 35.40 0.15 10.75 35.40 0.30 14.00 35.40 0.40
0.15 6.75 35.10 0.19 12.50 35.10 0.36 17.25 35.10 0.49
0.2 7.75 34.80 0.22 14.00 34.80 0.40 19.25 34.80 0.55
0.25 8.75 34.50 0.25 15.25 34.50 0.44 21.00 34.50 0.61
0.3 9.75 34.20 0.29 16.25 34.20 0.48 22.75 34.20 0.67
0.35 10.25 33.90 0.30 17.25 33.90 0.51 24.25 33.90 0.72
0.4 10.75 33.60 0.32 18.25 33.60 0.54 25.50 33.60 0.76
0.45 11.25 33.30 0.34 19.25 33.30 0.58 26.75 33.30 0.80
0.5 11.50 33.00 0.35 20.00 33.00 0.61 27.75 33.00 0.84
0.55 11.50 32.70 0.35 20.50 32.70 0.63 28.50 32.70 0.87
0.6 11.50 32.40 0.35 21.00 32.40 0.65 28.75 32.40 0.89
0.65 21.50 32.10 0.67 29.00 32.10 0.90
0.7 21.75 31.80 0.68 29.25 31.80 0.92
0.75 22.00 31.50 0.70 29.25 31.50 0.93
0.8 22.25 31.20 0.71
0.85 22.25 30.90 0.72
0.9 22.25 30.60 0.73
Normal Stress 'σ'
Shear Stress 'δ' ( kg/cm2)
(kg/cm2)
0.35 0.5
0.73 1.0 c ( kg/cm2) φ (Deg)
0.93 1.5 0.10 30
Stress Curve
1.2
Shear Stress (kg/cm2)
1.0
0.8
0.6
0.4
0.2
0.0
0.0 0.5 1.0 1.5 2.0
Normal stress (kg/cm2)
`
68
DIRECT SHEAR TEST (UU TYPE)
Name of Project Geotechnical Investigations for Greenfield 'A' Warehousing Facility
Client Brit Logistics Pvt. Ltd.
Location Dobaspet, Bangalore
Date of Test 22-04-2023
Borehole No. BH 5 H (mm) L X B (mm) A (cm2) V (cm3)
Depth (m) 3.0 25.00 60 x 60 36.00 90.00
Test 1 Test 2 Test 3
Shear Shear Shear
Applied Applied Applied
Horizontal Corrected Stress Corrected Stress Corrected Stress
Load 'P' Load 'P' Load 'P'
Deformation (cm) Area A(cm²) σ Area A(cm²) σ Area A(cm²) σ
(kg) (kg) (kg)
(kg/cm2) (kg/cm2) (kg/cm2)
0 0.00 36.00 0.00 0.00 36.00 0.00 0.00 36.00 0.00
0.05 4.75 35.70 0.13 9.50 35.70 0.27 12.50 35.70 0.35
0.1 6.25 35.40 0.18 13.75 35.40 0.39 16.75 35.40 0.47
0.15 7.50 35.10 0.21 16.00 35.10 0.46 20.00 35.10 0.57
0.2 8.75 34.80 0.25 17.50 34.80 0.50 22.25 34.80 0.64
0.25 9.50 34.50 0.28 18.50 34.50 0.54 24.00 34.50 0.70
0.3 10.00 34.20 0.29 19.50 34.20 0.57 25.75 34.20 0.75
0.35 10.50 33.90 0.31 20.25 33.90 0.60 27.25 33.90 0.80
0.4 11.00 33.60 0.33 21.00 33.60 0.63 28.50 33.60 0.85
0.45 11.50 33.30 0.35 21.50 33.30 0.65 29.25 33.30 0.88
0.5 11.75 33.00 0.36 22.00 33.00 0.67 29.75 33.00 0.90
0.55 12.00 32.70 0.37 22.25 32.70 0.68 30.00 32.70 0.92
0.6 12.00 32.40 0.37 22.50 32.40 0.69 30.25 32.40 0.93
0.65 12.00 32.10 0.37 22.75 32.10 0.71 30.50 32.10 0.95
0.7 12.00 31.80 0.38 23.00 31.80 0.72 30.75 31.80 0.97
0.75 23.00 31.50 0.73 30.75 31.50 0.98
0.8 30.75 31.20 0.99
0.85
Normal Stress 'σ'
Shear Stress 'δ' ( kg/cm2)
(kg/cm2)
0.38 0.5
0.73 1.0 c ( kg/cm2) φ (Deg)
0.99 1.5 0.09 31
Stress Curve
1.2
Shear Stress (kg/cm2)
1.0
0.8
0.6
0.4
0.2
0.0
0.0 0.5 1.0 1.5 2.0
Normal stress (kg/cm2)
`
69
DIRECT SHEAR TEST (UU TYPE)
Name of Project Geotechnical Investigations for Greenfield 'A' Warehousing Facility
Client Brit Logistics Pvt. Ltd.
Location Dobaspet, Bangalore
Date of Test 22-04-2023
Borehole No. BH 6 H (mm) L X B (mm) A (cm2) V (cm3)
Depth (m) 3.0 25.00 60 x 60 36.00 90.00
Test 1 Test 2 Test 3
Shear Shear Shear
Applied Applied Applied
Horizontal Corrected Stress Corrected Stress Corrected Stress
Load 'P' Load 'P' Load 'P'
Deformation (cm) Area A(cm²) σ Area A(cm²) σ Area A(cm²) σ
(kg) (kg) (kg)
(kg/cm2) (kg/cm2) (kg/cm2)
0 0.00 36.00 0.00 0.00 36.00 0.00 0.00 36.00 0.00
0.05 5.25 35.70 0.15 8.25 35.70 0.23 12.50 35.70 0.35
0.1 6.50 35.40 0.18 12.00 35.40 0.34 17.50 35.40 0.49
0.15 7.50 35.10 0.21 14.75 35.10 0.42 20.75 35.10 0.59
0.2 8.50 34.80 0.24 16.25 34.80 0.47 22.75 34.80 0.65
0.25 9.25 34.50 0.27 17.75 34.50 0.51 24.75 34.50 0.72
0.3 9.75 34.20 0.29 19.00 34.20 0.56 26.25 34.20 0.77
0.35 10.25 33.90 0.30 19.75 33.90 0.58 27.75 33.90 0.82
0.4 10.75 33.60 0.32 20.25 33.60 0.60 28.75 33.60 0.86
0.45 11.25 33.30 0.34 20.75 33.30 0.62 30.00 33.30 0.90
0.5 11.25 33.00 0.34 21.00 33.00 0.64 31.00 33.00 0.94
0.55 11.25 32.70 0.34 21.25 32.70 0.65 31.50 32.70 0.96
0.6 11.25 32.40 0.35 21.50 32.40 0.66 31.75 32.40 0.98
0.65 21.75 32.10 0.68 32.00 32.10 1.00
0.7 22.00 31.80 0.69 32.00 31.80 1.01
0.75 22.00 31.50 0.70
0.8
0.85
Normal Stress 'σ'
Shear Stress 'δ' ( kg/cm2)
(kg/cm2)
0.35 0.5
0.70 1.0 c ( kg/cm2) φ (Deg)
1.01 1.5 0.02 33
Stress Curve
1.2
Shear Stress (kg/cm2)
1.0
0.8
0.6
0.4
0.2
0.0
0.0 0.5 1.0 1.5 2.0
Normal stress (kg/cm2)
`
70
DIRECT SHEAR TEST (UU TYPE)
Name of Project Geotechnical Investigations for Greenfield 'A' Warehousing Facility
Client Brit Logistics Pvt. Ltd.
Location Dobaspet, Bangalore
Date of Test 22-04-2023
Borehole No. BH 7 H (mm) L X B (mm) A (cm2) V (cm3)
Depth (m) 3.0 25.00 60 x 60 36.00 90.00
Test 1 Test 2 Test 3
Shear Shear Shear
Applied Applied Applied
Horizontal Corrected Stress Corrected Stress Corrected Stress
Load 'P' Load 'P' Load 'P'
Deformation (cm) Area A(cm²) σ Area A(cm²) σ Area A(cm²) σ
(kg) (kg) (kg)
(kg/cm2) (kg/cm2) (kg/cm2)
0 0.00 36.00 0.00 0.00 36.00 0.00 0.00 36.00 0.00
0.05 4.75 35.70 0.13 7.50 35.70 0.21 11.25 35.70 0.32
0.1 6.00 35.40 0.17 10.75 35.40 0.30 14.50 35.40 0.41
0.15 7.25 35.10 0.21 13.50 35.10 0.38 17.50 35.10 0.50
0.2 8.25 34.80 0.24 15.50 34.80 0.45 19.75 34.80 0.57
0.25 8.75 34.50 0.25 17.25 34.50 0.50 21.50 34.50 0.62
0.3 9.25 34.20 0.27 18.75 34.20 0.55 23.00 34.20 0.67
0.35 9.75 33.90 0.29 19.75 33.90 0.58 24.50 33.90 0.72
0.4 10.25 33.60 0.31 20.25 33.60 0.60 25.75 33.60 0.77
0.45 10.75 33.30 0.32 20.50 33.30 0.62 26.75 33.30 0.80
0.5 11.25 33.00 0.34 20.75 33.00 0.63 27.50 33.00 0.83
0.55 11.50 32.70 0.35 21.00 32.70 0.64 28.00 32.70 0.86
0.6 11.75 32.40 0.36 21.25 32.40 0.66 28.50 32.40 0.88
0.65 11.75 32.10 0.37 21.25 32.10 0.66 28.75 32.10 0.90
0.7 0.00 31.80 0.00 29.00 31.80 0.91
0.75 0.00 31.50 0.00 29.25 31.50 0.93
0.8 0.00 31.20 0.00 29.25 31.20 0.94
0.85
Normal Stress 'σ'
Shear Stress 'δ' ( kg/cm2)
(kg/cm2)
0.37 0.5
0.66 1.0 c ( kg/cm2) φ (Deg)
0.94 1.5 0.08 30
Stress Curve
1.0
Shear Stress (kg/cm2)
0.8
0.6
0.4
0.2
0.0
0.0 0.5 1.0 1.5 2.0
Normal stress (kg/cm2)
`
71
DIRECT SHEAR TEST (UU TYPE)
Name of Project Geotechnical Investigations for Greenfield 'A' Warehousing Facility
Client Brit Logistics Pvt. Ltd.
Location Dobaspet, Bangalore
Date of Test 22-04-2023
Borehole No. BH 8 H (mm) L X B (mm) A (cm2) V (cm3)
Depth (m) 3.0 25.00 60 x 60 36.00 90.00
Test 1 Test 2 Test 3
Shear Shear Shear
Applied Applied Applied
Horizontal Corrected Stress Corrected Stress Corrected Stress
Load 'P' Load 'P' Load 'P'
Deformation (cm) Area A(cm²) σ Area A(cm²) σ Area A(cm²) σ
(kg) (kg) (kg)
(kg/cm2) (kg/cm2) (kg/cm2)
0 0.00 36.00 0.00 0.00 36.00 0.00 0.00 36.00 0.00
0.05 5.50 35.70 0.15 7.75 35.70 0.22 11.00 35.70 0.31
0.1 7.00 35.40 0.20 10.75 35.40 0.30 14.75 35.40 0.42
0.15 8.25 35.10 0.24 13.50 35.10 0.38 17.50 35.10 0.50
0.2 8.75 34.80 0.25 15.00 34.80 0.43 20.00 34.80 0.57
0.25 9.25 34.50 0.27 17.00 34.50 0.49 22.00 34.50 0.64
0.3 9.75 34.20 0.29 18.25 34.20 0.53 24.00 34.20 0.70
0.35 10.25 33.90 0.30 19.25 33.90 0.57 25.50 33.90 0.75
0.4 10.75 33.60 0.32 20.00 33.60 0.60 26.50 33.60 0.79
0.45 11.00 33.30 0.33 20.50 33.30 0.62 27.50 33.30 0.83
0.5 11.25 33.00 0.34 21.00 33.00 0.64 28.25 33.00 0.86
0.55 11.25 32.70 0.34 21.25 32.70 0.65 28.50 32.70 0.87
0.6 11.25 32.40 0.35 21.25 32.40 0.66 28.75 32.40 0.89
0.65 11.25 32.10 0.35 21.25 32.10 0.66 28.75 32.10 0.90
0.7 0.00 31.80 0.00
0.75
0.8
0.85
Normal Stress 'σ'
Shear Stress 'δ' ( kg/cm2)
(kg/cm2)
0.35 0.5
0.66 1.0 c ( kg/cm2) φ (Deg)
0.90 1.5 0.09 29
Stress Curve
1.0
Shear Stress (kg/cm2)
0.8
0.6
0.4
0.2
0.0
0.0 0.5 1.0 1.5 2.0
Normal stress (kg/cm2)
`
72
DIRECT SHEAR TEST (UU TYPE)
Name of Project Geotechnical Investigations for Greenfield 'A' Warehousing Facility
Client Brit Logistics Pvt. Ltd.
Location Dobaspet, Bangalore
Date of Test 22-04-2023
Borehole No. BH 9 H (mm) L X B (mm) A (cm2) V (cm3)
Depth (m) 3.0 25.00 60 x 60 36.00 90.00
Test 1 Test 2 Test 3
Shear Shear Shear
Applied Applied Applied
Horizontal Corrected Stress Corrected Stress Corrected Stress
Load 'P' Load 'P' Load 'P'
Deformation (cm) Area A(cm²) σ Area A(cm²) σ Area A(cm²) σ
(kg) (kg) (kg)
(kg/cm2) (kg/cm2) (kg/cm2)
0 0.00 36.00 0.00 0.00 36.00 0.00 0.00 36.00 0.00
0.05 3.75 35.70 0.11 7.00 35.70 0.20 10.00 35.70 0.28
0.1 5.00 35.40 0.14 11.25 35.40 0.32 13.25 35.40 0.37
0.15 6.00 35.10 0.17 13.00 35.10 0.37 16.50 35.10 0.47
0.2 6.75 34.80 0.19 15.00 34.80 0.43 18.50 34.80 0.53
0.25 7.50 34.50 0.22 16.75 34.50 0.49 20.50 34.50 0.59
0.3 8.25 34.20 0.24 18.25 34.20 0.53 22.00 34.20 0.64
0.35 9.00 33.90 0.27 19.25 33.90 0.57 23.50 33.90 0.69
0.4 9.50 33.60 0.28 20.00 33.60 0.60 24.75 33.60 0.74
0.45 10.00 33.30 0.30 20.50 33.30 0.62 25.75 33.30 0.77
0.5 10.25 33.00 0.31 20.75 33.00 0.63 26.75 33.00 0.81
0.55 10.50 32.70 0.32 20.75 32.70 0.63 27.50 32.70 0.84
0.6 10.75 32.40 0.33 20.75 32.40 0.64 28.25 32.40 0.87
0.65 11.00 32.10 0.34 20.75 32.10 0.65 28.75 32.10 0.90
0.7 11.00 31.80 0.35 29.00 31.80 0.91
0.75 29.00 31.50 0.92
0.8 29.00 31.20 0.93
0.85
Normal Stress 'σ'
Shear Stress 'δ' ( kg/cm2)
(kg/cm2)
0.35 0.5
0.65 1.0 c ( kg/cm2) φ (Deg)
0.93 1.5 0.06 30
Stress Curve
1.0
Shear Stress (kg/cm2)
0.8
0.6
0.4
0.2
0.0
0.0 0.5 1.0 1.5 2.0
Normal stress (kg/cm2)
`
73
DIRECT SHEAR TEST (UU TYPE)
Name of Project Geotechnical Investigations for Greenfield 'A' Warehousing Facility
Client Brit Logistics Pvt. Ltd.
Location Dobaspet, Bangalore
Date of Test 22-04-2023
Borehole No. BH 10 H (mm) L X B (mm) A (cm2) V (cm3)
Depth (m) 3.0 25.00 60 x 60 36.00 90.00
Test 1 Test 2 Test 3
Shear Shear Shear
Applied Applied Applied
Horizontal Corrected Stress Corrected Stress Corrected Stress
Load 'P' Load 'P' Load 'P'
Deformation (cm) Area A(cm²) σ Area A(cm²) σ Area A(cm²) σ
(kg) (kg) (kg)
(kg/cm2) (kg/cm2) (kg/cm2)
0 0.00 36.00 0.00 0.00 36.00 0.00 0.00 36.00 0.00
0.05 4.50 35.70 0.13 7.50 35.70 0.21 10.50 35.70 0.29
0.1 5.75 35.40 0.16 11.25 35.40 0.32 14.25 35.40 0.40
0.15 6.75 35.10 0.19 14.00 35.10 0.40 17.25 35.10 0.49
0.2 7.50 34.80 0.22 16.75 34.80 0.48 20.00 34.80 0.57
0.25 8.25 34.50 0.24 18.50 34.50 0.54 22.50 34.50 0.65
0.3 9.00 34.20 0.26 19.75 34.20 0.58 24.25 34.20 0.71
0.35 9.50 33.90 0.28 20.50 33.90 0.60 26.00 33.90 0.77
0.4 10.00 33.60 0.30 21.00 33.60 0.63 27.50 33.60 0.82
0.45 10.50 33.30 0.32 21.25 33.30 0.64 28.25 33.30 0.85
0.5 10.75 33.00 0.33 21.50 33.00 0.65 29.00 33.00 0.88
0.55 10.75 32.70 0.33 21.75 32.70 0.67 29.25 32.70 0.89
0.6 10.75 32.40 0.33 22.00 32.40 0.68 29.25 32.40 0.90
0.65 10.75 32.10 0.33 22.00 32.10 0.69 29.25 32.10 0.91
0.7 29.25 31.80 0.92
0.75
0.8
0.85
Normal Stress 'σ'
Shear Stress 'δ' ( kg/cm2)
(kg/cm2)
0.33 0.5
0.69 1.0 c ( kg/cm2) φ (Deg)
0.92 1.5 0.06 30
Stress Curve
1.0
Shear Stress (kg/cm2)
0.8
0.6
0.4
0.2
0.0
0.0 0.5 1.0 1.5 2.0
Normal stress (kg/cm2)
`
74
DIRECT SHEAR TEST (UU TYPE)
Name of Project Geotechnical Investigations for Greenfield 'A' Warehousing Facility
Client Brit Logistics Pvt. Ltd.
Location Dobaspet, Bangalore
Date of Test 22-04-2023
Borehole No. BH 11 H (mm) L X B (mm) A (cm2) V (cm3)
Depth (m) 3.0 25.00 60 x 60 36.00 90.00
Test 1 Test 2 Test 3
Shear Shear Shear
Applied Applied Applied
Horizontal Corrected Stress Corrected Stress Corrected Stress
Load 'P' Load 'P' Load 'P'
Deformation (cm) Area A(cm²) σ Area A(cm²) σ Area A(cm²) σ
(kg) (kg) (kg)
(kg/cm2) (kg/cm2) (kg/cm2)
0 0.00 36.00 0.00 0.00 36.00 0.00 0.00 36.00 0.00
0.05 4.25 35.70 0.12 7.25 35.70 0.20 10.75 35.70 0.30
0.1 5.25 35.40 0.15 10.75 35.40 0.30 14.50 35.40 0.41
0.15 6.25 35.10 0.18 13.75 35.10 0.39 17.50 35.10 0.50
0.2 7.00 34.80 0.20 16.25 34.80 0.47 20.50 34.80 0.59
0.25 8.00 34.50 0.23 18.25 34.50 0.53 22.75 34.50 0.66
0.3 8.75 34.20 0.26 20.00 34.20 0.58 25.00 34.20 0.73
0.35 9.50 33.90 0.28 20.50 33.90 0.60 26.25 33.90 0.77
0.4 10.00 33.60 0.30 20.75 33.60 0.62 27.00 33.60 0.80
0.45 10.50 33.30 0.32 21.00 33.30 0.63 27.75 33.30 0.83
0.5 10.75 33.00 0.33 21.25 33.00 0.64 28.25 33.00 0.86
0.55 11.00 32.70 0.34 21.50 32.70 0.66 28.50 32.70 0.87
0.6 11.25 32.40 0.35 21.50 32.40 0.66 28.75 32.40 0.89
0.65 11.25 32.10 0.35 29.00 32.10 0.90
0.7 11.25 31.80 0.35 29.00 31.80 0.91
0.75 29.00 31.50 0.92
0.8
0.85
Normal Stress 'σ'
Shear Stress 'δ' ( kg/cm2)
(kg/cm2)
0.35 0.5
0.66 1.0 c ( kg/cm2) φ (Deg)
0.92 1.5 0.08 30
Stress Curve
1.0
Shear Stress (kg/cm2)
0.8
0.6
0.4
0.2
0.0
0.0 0.5 1.0 1.5 2.0
Normal stress (kg/cm2)
`
75
DIRECT SHEAR TEST (UU TYPE)
Name of Project Geotechnical Investigations for Greenfield 'A' Warehousing Facility
Client Brit Logistics Pvt. Ltd.
Location Dobaspet, Bangalore
Date of Test 22-04-2023
Borehole No. BH 12 H (mm) L X B (mm) A (cm2) V (cm3)
Depth (m) 3.0 25.00 60 x 60 36.00 90.00
Test 1 Test 2 Test 3
Shear Shear Shear
Applied Applied Applied
Horizontal Corrected Stress Corrected Stress Corrected Stress
Load 'P' Load 'P' Load 'P'
Deformation (cm) Area A(cm²) σ Area A(cm²) σ Area A(cm²) σ
(kg) (kg) (kg)
(kg/cm2) (kg/cm2) (kg/cm2)
0 0.00 36.00 0.00 0.00 36.00 0.00 0.00 36.00 0.00
0.05 4.75 35.70 0.13 7.00 35.70 0.20 10.00 35.70 0.28
0.1 6.25 35.40 0.18 10.00 35.40 0.28 13.75 35.40 0.39
0.15 7.00 35.10 0.20 12.50 35.10 0.36 17.00 35.10 0.48
0.2 7.75 34.80 0.22 14.50 34.80 0.42 19.50 34.80 0.56
0.25 8.50 34.50 0.25 16.00 34.50 0.46 21.25 34.50 0.62
0.3 9.00 34.20 0.26 17.50 34.20 0.51 23.00 34.20 0.67
0.35 9.50 33.90 0.28 18.50 33.90 0.55 24.50 33.90 0.72
0.4 9.75 33.60 0.29 19.25 33.60 0.57 25.50 33.60 0.76
0.45 10.00 33.30 0.30 19.75 33.30 0.59 26.50 33.30 0.80
0.5 10.25 33.00 0.31 20.25 33.00 0.61 27.25 33.00 0.83
0.55 10.50 32.70 0.32 20.50 32.70 0.63 27.75 32.70 0.85
0.6 10.75 32.40 0.33 20.75 32.40 0.64 28.25 32.40 0.87
0.65 11.00 32.10 0.34 20.75 32.10 0.65 28.50 32.10 0.89
0.7 11.00 31.80 0.35 20.75 31.80 0.65 28.75 31.80 0.90
0.75 11.00 31.50 0.35 28.75 31.50 0.91
0.8 28.75 31.20 0.92
0.85 28.75 30.90 0.93
Normal Stress 'σ'
Shear Stress 'δ' ( kg/cm2)
(kg/cm2)
0.35 0.5
0.65 1.0 c ( kg/cm2) φ (Deg)
0.93 1.5 0.06 30
Stress Curve
1.0
Shear Stress (kg/cm2)
0.8
0.6
0.4
0.2
0.0
0.0 0.5 1.0 1.5 2.0
Normal stress (kg/cm2)
`
76
DIRECT SHEAR TEST (UU TYPE)
Name of Project Geotechnical Investigations for Greenfield 'A' Warehousing Facility
Client Brit Logistics Pvt. Ltd.
Location Dobaspet, Bangalore
Date of Test 22-04-2023
Borehole No. BH 13 H (mm) L X B (mm) A (cm2) V (cm3)
Depth (m) 3.0 25.00 60 x 60 36.00 90.00
Test 1 Test 2 Test 3
Shear Shear Shear
Applied Applied Applied
Horizontal Corrected Stress Corrected Stress Corrected Stress
Load 'P' Load 'P' Load 'P'
Deformation (cm) Area A(cm²) σ Area A(cm²) σ Area A(cm²) σ
(kg) (kg) (kg)
(kg/cm2) (kg/cm2) (kg/cm2)
0 0.00 36.00 0.00 0.00 36.00 0.00 0.00 36.00 0.00
0.05 4.50 35.70 0.13 6.75 35.70 0.19 10.75 35.70 0.30
0.1 5.75 35.40 0.16 9.75 35.40 0.28 14.50 35.40 0.41
0.15 6.75 35.10 0.19 11.75 35.10 0.33 17.75 35.10 0.51
0.2 7.75 34.80 0.22 13.25 34.80 0.38 20.00 34.80 0.57
0.25 8.50 34.50 0.25 15.00 34.50 0.43 21.75 34.50 0.63
0.3 9.00 34.20 0.26 16.25 34.20 0.48 23.25 34.20 0.68
0.35 9.25 33.90 0.27 17.25 33.90 0.51 24.75 33.90 0.73
0.4 9.50 33.60 0.28 18.25 33.60 0.54 25.75 33.60 0.77
0.45 9.75 33.30 0.29 19.00 33.30 0.57 26.75 33.30 0.80
0.5 10.00 33.00 0.30 19.75 33.00 0.60 27.50 33.00 0.83
0.55 10.25 32.70 0.31 20.25 32.70 0.62 28.00 32.70 0.86
0.6 10.50 32.40 0.32 20.75 32.40 0.64 28.25 32.40 0.87
0.65 10.75 32.10 0.33 21.25 32.10 0.66 28.50 32.10 0.89
0.7 11.00 31.80 0.35 21.50 31.80 0.68 28.50 31.80 0.90
0.75 11.00 31.50 0.35 21.50 31.50 0.68 28.50 31.50 0.90
0.8 11.00 31.20 0.35 21.50 31.20 0.69
0.85
Normal Stress 'σ'
Shear Stress 'δ' ( kg/cm2)
(kg/cm2)
0.35 0.5
0.69 1.0 c ( kg/cm2) φ (Deg)
0.90 1.5 0.10 29
Stress Curve
1.0
Shear Stress (kg/cm2)
0.8
0.6
0.4
0.2
0.0
0.0 0.5 1.0 1.5 2.0
Normal stress (kg/cm2)
`
77
DIRECT SHEAR TEST (UU TYPE)
Name of Project Geotechnical Investigations for Greenfield 'A' Warehousing Facility
Client Brit Logistics Pvt. Ltd.
Location Dobaspet, Bangalore
Date of Test 22-04-2023
Borehole No. BH 14 H (mm) L X B (mm) A (cm2) V (cm3)
Depth (m) 3.0 25.00 60 x 60 36.00 90.00
Test 1 Test 2 Test 3
Shear Shear Shear
Applied Applied Applied
Horizontal Corrected Stress Corrected Stress Corrected Stress
Load 'P' Load 'P' Load 'P'
Deformation (cm) Area A(cm²) σ Area A(cm²) σ Area A(cm²) σ
(kg) (kg) (kg)
(kg/cm2) (kg/cm2) (kg/cm2)
0 0.00 36.00 0.00 0.00 36.00 0.00 0.00 36.00 0.00
0.05 3.75 35.70 0.11 7.25 35.70 0.20 10.00 35.70 0.28
0.1 5.50 35.40 0.16 11.50 35.40 0.32 13.75 35.40 0.39
0.15 6.75 35.10 0.19 14.50 35.10 0.41 17.25 35.10 0.49
0.2 7.75 34.80 0.22 16.75 34.80 0.48 20.00 34.80 0.57
0.25 8.50 34.50 0.25 18.25 34.50 0.53 22.00 34.50 0.64
0.3 9.00 34.20 0.26 19.25 34.20 0.56 23.50 34.20 0.69
0.35 9.50 33.90 0.28 20.00 33.90 0.59 25.00 33.90 0.74
0.4 10.00 33.60 0.30 20.50 33.60 0.61 26.00 33.60 0.77
0.45 10.25 33.30 0.31 20.75 33.30 0.62 26.75 33.30 0.80
0.5 10.50 33.00 0.32 21.00 33.00 0.64 27.50 33.00 0.83
0.55 10.75 32.70 0.33 21.25 32.70 0.65 28.25 32.70 0.86
0.6 11.00 32.40 0.34 21.25 32.40 0.66 28.75 32.40 0.89
0.65 11.25 32.10 0.35 29.00 32.10 0.90
0.7 11.25 31.80 0.35 29.25 31.80 0.92
0.75 11.25 31.50 0.36 29.50 31.50 0.94
0.8 29.50 31.20 0.95
0.85 29.50 30.90 0.95
Normal Stress 'σ'
Shear Stress 'δ' ( kg/cm2)
(kg/cm2)
0.36 0.5
0.66 1.0 c ( kg/cm2) φ (Deg)
0.95 1.5 0.06 31
Stress Curve
1.2
Shear Stress (kg/cm2)
1.0
0.8
0.6
0.4
0.2
0.0
0.0 0.5 1.0 1.5 2.0
Normal stress (kg/cm2)
`
78
DIRECT SHEAR TEST (UU TYPE)
Name of Project Geotechnical Investigations for Greenfield 'A' Warehousing Facility
Client Brit Logistics Pvt. Ltd.
Location Dobaspet, Bangalore
Date of Test 22-04-2023
Borehole No. BH 15 H (mm) L X B (mm) A (cm2) V (cm3)
Depth (m) 3.0 25.00 60 x 60 36.00 90.00
Test 1 Test 2 Test 3
Shear Shear Shear
Applied Applied Applied
Horizontal Corrected Stress Corrected Stress Corrected Stress
Load 'P' Load 'P' Load 'P'
Deformation (cm) Area A(cm²) σ Area A(cm²) σ Area A(cm²) σ
(kg) (kg) (kg)
(kg/cm2) (kg/cm2) (kg/cm2)
0 0.00 36.00 0.00 0.00 36.00 0.00 0.00 36.00 0.00
0.05 5.25 35.70 0.15 8.00 35.70 0.22 11.25 35.70 0.32
0.1 6.75 35.40 0.19 11.25 35.40 0.32 14.50 35.40 0.41
0.15 8.00 35.10 0.23 13.25 35.10 0.38 17.50 35.10 0.50
0.2 8.75 34.80 0.25 15.00 34.80 0.43 20.25 34.80 0.58
0.25 9.25 34.50 0.27 16.25 34.50 0.47 22.50 34.50 0.65
0.3 9.75 34.20 0.29 17.50 34.20 0.51 24.00 34.20 0.70
0.35 10.25 33.90 0.30 18.50 33.90 0.55 24.75 33.90 0.73
0.4 10.50 33.60 0.31 19.25 33.60 0.57 25.50 33.60 0.76
0.45 10.75 33.30 0.32 19.75 33.30 0.59 26.25 33.30 0.79
0.5 10.75 33.00 0.33 20.25 33.00 0.61 27.00 33.00 0.82
0.55 10.75 32.70 0.33 20.50 32.70 0.63 27.50 32.70 0.84
0.6 10.75 32.40 0.33 20.75 32.40 0.64 28.00 32.40 0.86
0.65 21.00 32.10 0.65 28.25 32.10 0.88
0.7 28.50 31.80 0.90
0.75 28.50 31.50 0.90
0.8
0.85
Normal Stress 'σ'
Shear Stress 'δ' ( kg/cm2)
(kg/cm2)
0.33 0.5
0.65 1.0 c ( kg/cm2) φ (Deg)
0.90 1.5 0.06 30
Stress Curve
1.0
Shear Stress (kg/cm2)
0.8
0.6
0.4
0.2
0.0
0.0 0.5 1.0 1.5 2.0
Normal stress (kg/cm2)
`
79
DIRECT SHEAR TEST (UU TYPE)
Name of Project Geotechnical Investigations for Greenfield 'A' Warehousing Facility
Client Brit Logistics Pvt. Ltd.
Location Dobaspet, Bangalore
Date of Test 24-04-2023
Borehole No. BH 16 H (mm) L X B (mm) A (cm2) V (cm3)
Depth (m) 3.0 25.00 60 x 60 36.00 90.00
Test 1 Test 2 Test 3
Shear Shear Shear
Applied Applied Applied
Horizontal Corrected Stress Corrected Stress Corrected Stress
Load 'P' Load 'P' Load 'P'
Deformation (cm) Area A(cm²) σ Area A(cm²) σ Area A(cm²) σ
(kg) (kg) (kg)
(kg/cm2) (kg/cm2) (kg/cm2)
0 0.00 36.00 0.00 0.00 36.00 0.00 0.00 36.00 0.00
0.05 5.25 35.70 0.15 7.50 35.70 0.21 10.50 35.70 0.29
0.1 6.75 35.40 0.19 10.25 35.40 0.29 13.25 35.40 0.37
0.15 8.00 35.10 0.23 12.50 35.10 0.36 16.25 35.10 0.46
0.2 9.00 34.80 0.26 14.50 34.80 0.42 19.25 34.80 0.55
0.25 9.75 34.50 0.28 16.75 34.50 0.49 21.00 34.50 0.61
0.3 10.25 34.20 0.30 18.25 34.20 0.53 22.50 34.20 0.66
0.35 10.75 33.90 0.32 19.50 33.90 0.58 24.00 33.90 0.71
0.4 11.00 33.60 0.33 20.00 33.60 0.60 25.00 33.60 0.74
0.45 11.25 33.30 0.34 20.50 33.30 0.62 26.00 33.30 0.78
0.5 11.25 33.00 0.34 20.75 33.00 0.63 26.50 33.00 0.80
0.55 11.25 32.70 0.34 21.00 32.70 0.64 27.00 32.70 0.83
0.6 11.25 32.40 0.35 21.25 32.40 0.66 27.50 32.40 0.85
0.65 21.25 32.10 0.66 27.75 32.10 0.86
0.7 28.00 31.80 0.88
0.75 28.25 31.50 0.90
0.8 28.25 31.20 0.91
0.85
Normal Stress 'σ'
Shear Stress 'δ' ( kg/cm2)
(kg/cm2)
0.35 0.5
0.66 1.0 c ( kg/cm2) φ (Deg)
0.91 1.5 0.08 29
Stress Curve
1.0
Shear Stress (kg/cm2)
0.8
0.6
0.4
0.2
0.0
0.0 0.5 1.0 1.5 2.0
Normal stress (kg/cm2)
`
80
DIRECT SHEAR TEST (UU TYPE)
Name of Project Geotechnical Investigations for Greenfield 'A' Warehousing Facility
Client Brit Logistics Pvt. Ltd.
Location Dobaspet, Bangalore
Date of Test 24-04-2023
Borehole No. BH 17 H (mm) L X B (mm) A (cm2) V (cm3)
Depth (m) 3.0 25.00 60 x 60 36.00 90.00
Test 1 Test 2 Test 3
Shear Shear Shear
Applied Applied Applied
Horizontal Corrected Stress Corrected Stress Corrected Stress
Load 'P' Load 'P' Load 'P'
Deformation (cm) Area A(cm²) σ Area A(cm²) σ Area A(cm²) σ
(kg) (kg) (kg)
(kg/cm2) (kg/cm2) (kg/cm2)
0 0.00 36.00 0.00 0.00 36.00 0.00 0.00 36.00 0.00
0.05 3.75 35.70 0.11 6.50 35.70 0.18 10.25 35.70 0.29
0.1 4.75 35.40 0.13 10.00 35.40 0.28 14.25 35.40 0.40
0.15 5.75 35.10 0.16 12.50 35.10 0.36 17.50 35.10 0.50
0.2 6.75 34.80 0.19 14.50 34.80 0.42 20.00 34.80 0.57
0.25 7.50 34.50 0.22 16.00 34.50 0.46 22.00 34.50 0.64
0.3 8.25 34.20 0.24 17.25 34.20 0.50 23.75 34.20 0.69
0.35 8.75 33.90 0.26 18.50 33.90 0.55 25.50 33.90 0.75
0.4 9.25 33.60 0.28 19.50 33.60 0.58 26.50 33.60 0.79
0.45 9.75 33.30 0.29 20.25 33.30 0.61 27.50 33.30 0.83
0.5 10.00 33.00 0.30 21.00 33.00 0.64 28.25 33.00 0.86
0.55 10.25 32.70 0.31 21.25 32.70 0.65 29.00 32.70 0.89
0.6 10.50 32.40 0.32 21.50 32.40 0.66 29.50 32.40 0.91
0.65 10.75 32.10 0.33 21.75 32.10 0.68 29.75 32.10 0.93
0.7 10.75 31.80 0.34 21.75 31.80 0.68 30.00 31.80 0.94
0.75 10.75 31.50 0.34 21.75 31.50 0.69 30.00 31.50 0.95
0.8 30.00 31.20 0.96
0.85
Normal Stress 'σ'
Shear Stress 'δ' ( kg/cm2)
(kg/cm2)
0.34 0.5
0.69 1.0 c ( kg/cm2) φ (Deg)
0.96 1.5 0.04 32
Stress Curve
1.2
Shear Stress (kg/cm2)
1.0
0.8
0.6
0.4
0.2
0.0
0.0 0.5 1.0 1.5 2.0
Normal stress (kg/cm2)
`
81
DIRECT SHEAR TEST (UU TYPE)
Name of Project Geotechnical Investigations for Greenfield 'A' Warehousing Facility
Client Brit Logistics Pvt. Ltd.
Location Dobaspet, Bangalore
Date of Test 24-04-2023
Borehole No. BH 18 H (mm) L X B (mm) A (cm2) V (cm3)
Depth (m) 3.0 25.00 60 x 60 36.00 90.00
Test 1 Test 2 Test 3
Shear Shear Shear
Applied Applied Applied
Horizontal Corrected Stress Corrected Stress Corrected Stress
Load 'P' Load 'P' Load 'P'
Deformation (cm) Area A(cm²) σ Area A(cm²) σ Area A(cm²) σ
(kg) (kg) (kg)
(kg/cm2) (kg/cm2) (kg/cm2)
0 0.00 36.00 0.00 0.00 36.00 0.00 0.00 36.00 0.00
0.05 4.50 35.70 0.13 7.25 35.70 0.20 10.75 35.70 0.30
0.1 5.75 35.40 0.16 10.50 35.40 0.30 14.50 35.40 0.41
0.15 7.00 35.10 0.20 12.75 35.10 0.36 17.75 35.10 0.51
0.2 8.00 34.80 0.23 14.25 34.80 0.41 20.50 34.80 0.59
0.25 8.75 34.50 0.25 15.75 34.50 0.46 22.50 34.50 0.65
0.3 9.50 34.20 0.28 17.00 34.20 0.50 23.75 34.20 0.69
0.35 10.00 33.90 0.29 18.00 33.90 0.53 25.00 33.90 0.74
0.4 10.50 33.60 0.31 18.75 33.60 0.56 26.00 33.60 0.77
0.45 10.75 33.30 0.32 19.50 33.30 0.59 26.75 33.30 0.80
0.5 10.75 33.00 0.33 20.00 33.00 0.61 27.25 33.00 0.83
0.55 10.75 32.70 0.33 20.50 32.70 0.63 27.75 32.70 0.85
0.6 10.75 32.40 0.33 20.75 32.40 0.64 28.25 32.40 0.87
0.65 21.00 32.10 0.65 28.75 32.10 0.90
0.7 21.25 31.80 0.67 29.00 31.80 0.91
0.75 21.50 31.50 0.68 29.25 31.50 0.93
0.8 21.50 31.20 0.69 29.50 31.20 0.95
0.85 29.50 30.90 0.95
0.9 29.50 30.60 0.96
Normal Stress 'σ'
Shear Stress 'δ' ( kg/cm2)
(kg/cm2)
0.33 0.5
0.69 1.0 c ( kg/cm2) φ (Deg)
0.96 1.5 0.03 32
Stress Curve
1.2
Shear Stress (kg/cm2)
1.0
0.8
0.6
0.4
0.2
0.0
0.0 0.5 1.0 1.5 2.0
Normal stress (kg/cm2)
`
82
DIRECT SHEAR TEST (UU TYPE)
Name of Project Geotechnical Investigations for Greenfield 'A' Warehousing Facility
Client Brit Logistics Pvt. Ltd.
Location Dobaspet, Bangalore
Date of Test 24-04-2023
Borehole No. BH 19 H (mm) L X B (mm) A (cm2) V (cm3)
Depth (m) 3.0 25.00 60 x 60 36.00 90.00
Test 1 Test 2 Test 3
Shear Shear Shear
Applied Applied Applied
Horizontal Corrected Stress Corrected Stress Corrected Stress
Load 'P' Load 'P' Load 'P'
Deformation (cm) Area A(cm²) σ Area A(cm²) σ Area A(cm²) σ
(kg) (kg) (kg)
(kg/cm2) (kg/cm2) (kg/cm2)
0 0.00 36.00 0.00 0.00 36.00 0.00 0.00 36.00 0.00
0.05 3.75 35.70 0.11 6.75 35.70 0.19 9.50 35.70 0.27
0.1 4.75 35.40 0.13 10.00 35.40 0.28 13.25 35.40 0.37
0.15 5.75 35.10 0.16 12.00 35.10 0.34 16.50 35.10 0.47
0.2 6.50 34.80 0.19 14.00 34.80 0.40 18.50 34.80 0.53
0.25 7.00 34.50 0.20 15.50 34.50 0.45 20.25 34.50 0.59
0.3 7.50 34.20 0.22 17.50 34.20 0.51 22.00 34.20 0.64
0.35 8.00 33.90 0.24 19.25 33.90 0.57 23.25 33.90 0.69
0.4 8.50 33.60 0.25 20.25 33.60 0.60 24.25 33.60 0.72
0.45 9.00 33.30 0.27 20.75 33.30 0.62 25.50 33.30 0.77
0.5 9.25 33.00 0.28 21.25 33.00 0.64 26.25 33.00 0.80
0.55 9.50 32.70 0.29 21.50 32.70 0.66 27.00 32.70 0.83
0.6 9.75 32.40 0.30 21.75 32.40 0.67 27.50 32.40 0.85
0.65 10.00 32.10 0.31 22.00 32.10 0.69 28.00 32.10 0.87
0.7 10.25 31.80 0.32 22.00 31.80 0.69 28.25 31.80 0.89
0.75 10.25 31.50 0.33 28.50 31.50 0.90
0.8 10.25 31.20 0.33 28.75 31.20 0.92
0.85 28.75 30.90 0.93
0.9 28.75 30.60 0.94
Normal Stress 'σ'
Shear Stress 'δ' ( kg/cm2)
(kg/cm2)
0.33 0.5
0.69 1.0 c ( kg/cm2) φ (Deg)
0.94 1.5 0.04 31
Stress Curve
1.2
Shear Stress (kg/cm2)
1.0
0.8
0.6
0.4
0.2
0.0
0.0 0.5 1.0 1.5 2.0
Normal stress (kg/cm2)
`
83
Annexure C
SECON PRIVATE LIMITED
AN ISO-9001 : 2015 Certified Company
# 147, 7B Road, EPIP, Whitefield Bangalore 560066, India
TEST REPORT TC-6433
Geotech Division - Secon Private
Issued To: Test Report No.: MR-2023-004
Limited, Bangalore
Date of Receipt of Rock TC643323000000015F
08-04-2023 to 17-04-2023 Discipline - Mechanical Testing Date of Issue: 24-04-2023
samples:
Date of Testing: 10-04-2023 to 24-04-2023 Group - Rock Cores Sample ID: 363, 363A
Sample Condition: Good No. of Pages: 1
Point Load Index (PLI) -
BH No. Tested Depth (m) Core piece No. Sample Type IS 8764:1998 (RA 2019) (MPa)
Unsoaked Soaked
3 Core 1.71
BH 06 9.0 - 10.5
5 Core 2.44
2 Core 2.17
BH 12 9.0 - 10.5
4 Core 1.42
2 Core 1.30
BH 18 13.5 - 15.0
3 Core Failed at Minimum Load
3 Core 1.15
BH 19 18.5 - 20.0
4 Core Failed at Minimum Load
Authorised Signatory
K.R.Lenin Page No. 1 of 1
Technical Manager
NOTE:
(i) Test Results refer only to the tested samples and parameters.
(ii) Samples will be disposed after 3 months from the date of completion of testing.
(iii) In case of dispute, our liability is limited to the terms and conditions specified by client
(iv) This certificate can not be reproduced or distributed wholly or in part and cannot be used as evidence in a court of law
and should not be used in any form of media without the prior written permission from SECON
(v) Any dispute arising from this report is subject to Bangalore Jurisdiction only.
(vi) Sampling is not carried out by Geotechnical Laboratory - Secon Private Limited Unless otherwise specified
END OF THE TEST REPORT
84
Results of Laboratory Tests on rock samples
4 - - - - - 0.61 0.25 - -
4 - 0.21 - - - - - - -
BH 12 9.5-10.5
6 - - - - - - - 46.65 24.18
13.5-15.0 3 - 0.29 - - - - - - -
BH 18 4 - - - - - - - 11.51 -
15.0 - 16.0
5 2.65 0.79 3.39 2.69 3.53 - - - -
85
Annexure C1
Point Load Strength Index of Rock Result (IS 8764 -1998)
Soaked Sample Details
86
Point Load Strength Index of Rock Result (IS 8764 -1998)
UnSoaked Sample Details
87
Point Load Strength Index of Rock Result (IS 8764 -1998)
Unsoaked Sample Details
88
Point Load Strength Index of Rock Result (IS 8764 -1998)
Unsoaked Sample Details
89
Annexure C2
UNCONFINED COMPRESSIVE STRENGTH ROCK MATERIALS (IS 9143 -1979)
(Unsoaked)
P 112000
UCS =
A 2326.0
90
UNCONFINED COMPRESSIVE STRENGTH ROCK MATERIALS (IS 9143 -1979)
(Soaked)
P 90000
UCS =
A 2326.0
91
UNCONFINED COMPRESSIVE STRENGTH ROCK MATERIALS (IS 9143 -1979)
(Unsoaked)
P 107700
UCS =
A 2308.9
92
UNCONFINED COMPRESSIVE STRENGTH ROCK MATERIALS (IS 9143 -1979)
(Soaked)
P 55800
UCS =
A 2308.9
93
UNCONFINED COMPRESSIVE STRENGTH ROCK MATERIALS (IS 9143 -1979)
(Unsoaked)
P 26400
UCS =
A 2297.0
94
UNCONFINED COMPRESSIVE STRENGTH ROCK MATERIALS (IS 9143 -1979)
(Unsoaked)
P 52000
UCS =
A 2314.0
95
Annexure C3
Brazilian (Split) Tensile Strength of Rock Result (IS 10082 -1981)
Sample Details
Calculation
Split Tensile Strength in (Mpa)= 11.31
Calculation
Split Tensile Strength in (Mpa)= 11.70
96
Brazilian (Split) Tensile Strength of Rock Result (IS 10082 -1981)
Sample Details
Calculation
Split Tensile Strength in (Mpa)= 3.53
Calculation
Split Tensile Strength in (Mpa)= 3.92
97
Annexure C4
MODULUS OF ELASTICITY OF ROCK CORE SAMPLE (IS 9221 - 1979)
Project: Geotechnical Investigations for Greenfield 'A' Warehousing Facility Borehole No. BH 06
Client: Brit Logistics Pvt. Ltd. Depth (m) 9.5 - 10.5
Date of Testing 24-04-2023 Piece No. 4
Specimen Photograph (Before Test) Specimen Photograph (AfterTest)
60.00
2.00E-04
50.00
40.00 1.50E-04
Lateral Strain
Stress Mpa
30.00
1.00E-04
20.00
5.00E-05
10.00
0.00 0.00E+00
0.000 0.000 0.000 0.001 0.001 0.001 0 0.0002 0.0004 0.0006 0.0008 0.001
Strain Axial Stain
Test Results
Modulus of Elasticity (MPa) Poisson's Ratio
0.61 E+05 0.25
98
MODULUS OF ELASTICITY OF ROCK CORE SAMPLE (IS 9221 - 1979)
Project: Geotechnical Investigations for Greenfield 'A' Warehousing Facility Borehole No. BH 12
Client: Brit Logistics Pvt. Ltd. Depth (m) 9.5 - 10.5
Date of Testing 24-04-2023 Piece No. 7
Specimen Photograph (Before Test) Specimen Photograph (AfterTest)
50.00
2.00E-04
40.00
1.50E-04
Lateral Strain
Stress Mpa
30.00
1.00E-04
20.00
5.00E-05
10.00
0.00 0.00E+00
0.000 0.000 0.000 0.001 0.001 0.001 0 0.0002 0.0004 0.0006 0.0008 0.001
Strain Axial Stain
Test Results
Modulus of Elasticity (MPa) Poisson's Ratio
0.75 E+05 0.38
99
ANNEXURE D
LABORATORY TEST RESULTS OF TRIAL PIT SOIL SAMPLES
Specific gravity G -
(RA 2020) (RA 2021)
Tested depth (m)
Sample Nature
2.5 mm
5.0 mm
2.5 mm
5.0 mm
(g/cc)
OMC
MDD
(%)
Silt (%) Clay (%)
Medium
Coarse
Fine
TP 01 1 BS CI 0 0 23 13 50 14 42 22 20 30 15.17 2.56 1.79 15.4 7.39 6.89 15.14 14.04
100
PROJECT Geotechnical Investigation for Greenfield 'A' Warehousing Facility
CLIENT Brit Logistics Private Limited
LOCATION Avverehalli
TRAIL PIT NO. TP 01
Compaction Curve
1.80
MDD: 1.792 g/cc
OMC: 15.4 %
1.78
1.76
1.74
1.72
1.70
1.68
Dry Density (g/cc)
1.66
1.64
1.62
1.60
1.58
1.56
1.54
1.52
1.50
5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
Moisture Content (%)
101
PROJECT Geotechnical Investigation for Greenfield 'A' Warehousing Facility
CLIENT Brit Logistics Private Limited
LOCATION Avverehalli
TRAIL PIT NO. TP 02
Compaction Curve
1.88
MDD: 1.87 g/cc
OMC: 14.5 %
1.86
1.84
1.82
1.80
1.78
1.76
Dry Density (g/cc)
1.74
1.72
1.70
1.68
1.66
1.64
1.62
1.60
1.58
5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Moisture Content (%)
102
PROJECT Geotechnical Investigation for Greenfield 'A' Warehousing Facility
CLIENT Brit Logistics Private Limited
LOCATION Avverehalli
TRAIL PIT NO. TP 03
Compaction Curve
1.92
MDD: 1.91 g/cc
1.90 OMC: 13.9%
1.88
1.86
1.84
1.82
1.80
Dry Density (g/cc)
1.78
1.76
1.74
1.72
1.70
1.68
1.66
1.64
1.62
1.60
4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
Moisture Content (%)
103
CBR CURVE - TP 01
PROJECT Geotechnical Investigation for Greenfield 'A' Warehousing Facility
CLIENT Brit Logistics Private Limited
LOCATION Avverehalli
TP No. TP 01
400.00
Unsoaked Sample
CBR(2.5mm) = 15.14%
CBR(5.0mm) = 14.04%
300.00
250.00
Load (kgf)
200.00
150.00
100.00
50.00
Unsoaked
4 day-Soaked
0.00
0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0
Deflection (mm)
104
CBR CURVE - TP 02
PROJECT Geotechnical Investigation for Greenfield 'A' Warehousing Facility
CLIENT Brit Logistics Private Limited
LOCATION Avverehalli
TP No. TP 02
400.00
Unsoaked Sample
CBR(2.5mm) = 16.25%
CBR(5.0mm) = 14.77%
300.00
250.00
Load (kgf)
200.00
150.00
100.00
50.00
Unsoaked
4 day-Soaked
0.00
0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0
Deflection (mm)
105
CBR CURVE - TP 03
PROJECT Geotechnical Investigation for Greenfield 'A' Warehousing Facility
CLIENT Brit Logistics Private Limited
LOCATION Avverehalli
TP No. TP 03
450.00
Unsoaked Sample
CBR(2.5mm) = 17.36%
CBR(5.0mm) = 16.00%
400.00
4-day Soaked Sample
CBR(2.5mm) = 8.13%
CBR(5.0mm) = 7.63%
350.00
300.00
250.00
Load (kgf)
200.00
150.00
100.00
50.00
Unsoaked
4 day-Soaked
0.00
0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0
Deflection (mm)
106
Annexure E
SECON PRIVATE LIMITED
AN ISO-9001 : 2015 Certified Company
# 147, 7B Road, EPIP, Whitefield Bangalore 560066, India TC-6433
TEST REPORT
Geotech Division-Secon
Issued To: Private Limited, Test Report No: CS-2023-003
Bangalore. TC643323000000013F
Date of receipt of samples : 08.04.23 to 17.04.23 Discipline-Chemical Testing Matrix: Soil
Group-Soil 24.04.2023
Date of testing: 11.04.23 to 18.04.23 Date of Issue:
Sample ID : 363, 363 A No of Pages: 2
Sample Details Parameters
pH @ 25°C Total Soluble Chloride as Cl Sulphates
Sl No BH NO Depth (m) IS: 2720 (Part 26):1987 (SOP NO.SOP/GTC-L/08 Issue No.1) mg/kg IS 2720 :(Part 27):1977 mg/kg
NABL Accredited NABL Accredited NABL Accredited
1 BH 2 3.00 6.01 69.98 30.81
2 BH 3 3.00 6.26 49.98 43.43
3 BH 4 3.00 6.23 59.98 26.84
4 BH 5 3.00 6.04 39.99 35.13
5 BH 6 3.00 6.03 49.98 16.45
6 BH 7 3.00 6.12 59.98 16.18
7 BH 8 3.00 6.07 79.98 21.5
8 BH 9 3.00 6.42 59.98 18.5
9 BH 10 3.00 6.11 69.98 17.94
10 BH 11 3.00 6.02 39.99 29.64
11 BH 12 3.00 6.40 59.98 15.16
12 BH 13 3.00 7.08 69.98 18.31
13 BH 14 3.00 6.12 79.98 21.13
14 BH 15 3.00 6.08 69.98 20.75
15 BH 16 3.00 6.03 59.98 6.35
Authorised Signatory
Page No:1 of 2
Chemical Testing
107
Annexure E
SECON PRIVATE LIMITED
AN ISO-9001 : 2015 Certified Company
# 147, 7B Road, EPIP, Whitefield Bangalore 560066, India TC-6433
TEST REPORT
Geotech Division-Secon
Issued To: Private Limited, Test Report No: CS-2023-003
Bangalore. TC643323000000013F
Date of receipt of samples : 08.04.23 to 17.04.23 Discipline-Chemical Testing Matrix: Soil
Group-Soil 24.04.2023
Date of testing: 11.04.23 to 18.04.23 Date of Issue:
Sample ID : 363, 363 A No of Pages: 2
Sample Details Parameters
pH @ 25°C Total Soluble Chloride as Cl Sulphates
Sl No BH NO Depth (m) IS: 2720 (Part 26):1987 (SOP NO.SOP/GTC-L/08 Issue No.1) mg/kg IS 2720 :(Part 27):1977 mg/kg
NABL Accredited NABL Accredited NABL Accredited
16 BH 17 3.00 6.83 69.98 32.28
17 BH 18 3.00 6.32 49.98 20.00
18 BH 19 3.00 6.81 59.98 17.1
Authorised Signatory
Page No:2 of 2
Chemical Testing
NOTE :
(i) Test Results refer only to the tested samples and parameters.
(ii) Samples will be disposed after 3 months from the date of completion of testing.
(iii) In case of dispute, our liability is limited to the terms and conditions specified by client
(iv) This certificate can not be reproduced or distributed wholly or in part and cannot be used as evidence
in a court of law and should not be used in any form of media without the prior written permission from SECON
(v) Any dispute arising from this report is subject to Bangalore Jurisdiction only.
(vi) Sampling is not carried out by Geotechnical Laboratory - Secon Private Limited . END OF THE TEST REPORT
108
ANNEXURE F
NET SBC CALCULATIONS : c-f SHEAR CRITERIA (GENERAL SHEAR FAILURE) AS PER IS:6403
Relevant GT Design Data: All the boreholes Design Computations
Depth = 1.2 , 1.5 and 2.0 m 2.0 m UBC (1) +(2) +(3) (Refer below)
Width G= 2.58
Nc, Nq and Ng Bearing capacity factors related to f Sc, Sq and Sg Shape factors SBC UBC/FOS w= 16.55%
GWT- At the Base of Footing dc, dq and dg Depth factors FOS 2.5 Factor of Safety e=w*Gs= 0.1655*2.58
2
(Design Assumption) UBC Net Ultimate bearing capacity (t/m ) e= 0.427
SBC 2
Net safe bearing capacity (t/m ) gsub= ((Gs-1)/(1+e))*gw
gsub= 1.107 t/m3
SQUARE FOOTINGS
Depth of
√Nf = tan(45
Location foundation( Width (m) D/B ( 45+ f/2) Sc Sq Sg L/B dc dq = dg Phi
+f/2)
m)
1.5 2.00 0.75 60.50 1.767 1.30 1.20 0.80 1.00 1.265 1.133 31
All BHs 2.0 2.00 1.00 61.00 1.804 1.30 1.20 0.80 1.00 1.361 1.180 31
3.0 2.00 1.50 61.00 1.804 1.30 1.20 0.80 1.00 1.541 1.271 31
Depth of 0.50 * g *
Cohesion c 3 g '* D*(Nq- 3 SBC =
Location foundation( Width (m) 2 Nc Nq Ng c*Nc*Sc*dc g' (t/m ) g (t/m ) B*Ng*Sg*dg*0. UBC
(t/m ) 1) * Sq*dq UBC/2.5
m) 5
Depth of
√Nf = tan(45
Location foundation( Width (m) D/B ( 45+ f/2) Sc Sq Sg L/B dc dq = dg Phi
+f/2)
m)
1.5 3.00 0.50 60.50 1.767 1.30 1.20 0.80 1.00 1.177 1.088 31
All BHs 2.0 3.00 0.67 61.00 1.804 1.30 1.20 0.80 1.00 1.241 1.120 31
3.0 3.00 1.00 61.00 1.804 1.30 1.20 0.80 1.00 1.361 1.180 31
Depth of 0.50 * g *
Cohesion c 3 g' * D*(Nq- 3 SBC =
Location foundation( Width (m) 2 Nc Nq Ng c*Nc*Sc*dc g'(t/m ) g (t/m ) B*Ng*Sg*dg*0. UBC
(t/m ) 1) * Sq*dq UBC/2.5
m) 5
Depth of
√Nf = tan(45
Location foundation( Width (m) D/B ( 45+ f/2) Sc Sq Sg L/B dc dq = dg Phi
+f/2)
m)
1.5 4.00 0.38 60.50 1.767 1.30 1.20 0.80 1.00 1.133 1.066 31
All BHs 2.0 4.00 0.50 61.00 1.804 1.30 1.20 0.80 1.00 1.180 1.090 31
3.0 4.00 0.75 61.00 1.804 1.30 1.20 0.80 1.00 1.271 1.135 31
Depth of 0.50 * g *
Cohesion c 3 g' * D*(Nq- 3 SBC =
Location foundation( Width (m) 2 Nc Nq Ng c*Nc*Sc*dc g' (t/m ) g (t/m ) B*Ng*Sg*dg*0. UBC
(t/m ) 1) * Sq*dq UBC/2.5
m) 5
C= 1.5 log 10
Layer H (m) qc (T/m2) po (T/m2) (qc/p0) Δp (p0+Δp/p0) S (mm)
1 4 693.1702 3.87 268.36 17.74 0.75 25.62
112
SETTLEMENT CALCULATION AS PER IS 8009 PART 1
As per Cl.9.1.2, Method Based on Static Cone Penetration Test
Dobaspet Site
Design Assumptions
Existing Ground Level 0.0 m Shape of the footing Square
Founding Level 2.0 m Width of footing (B) 2.0 m
Depth of Influence 4.0 m Length of footing (L) 2.0 m
Allowable settlement 50.0 mm Depth of Foundation (D) 2.0 m
Water Table correction 0.5 Facter of Safety 2.5
Reference Borehole ALL Depth Factor 1.0
Net SBC (based on shear critieria) 35 T/m2 Rigidity Factor 0.8
Existing Ground Level Layer 1
GWL N value 22
Correction
factor 1.5
Corr.N 1.5*22= 33
Founding Level B= 2m 2m
Layer 1 Ave. N value -22 Ncorr - 33
Stiff Clayey Silt Thickness - 4.0 m
gsub 1.107 t/m3 4.0 m
Depth of Influence 6m
C= 1.5 log 10
Layer H (m) qc (T/m2) po (T/m2) (qc/p0) Δp (p0+Δp/p0) S (mm)
1 4 652 4.43 220.87 22.95 0.79 33.00
113
SETTLEMENT CALCULATION AS PER IS 8009 PART 1
As per Cl.9.1.2, Method Based on Static Cone Penetration Test
Dobaspet Site
Design Assumptions
Existing Ground Level 0.0 m Shape of the footing Square
Founding Level 3.0 m Width of footing (B) 2.0 m
Depth of Influence 4.0 m Length of footing (L) 2.0 m
Allowable settlement 50.0 mm Depth of Foundation (D) 3.0 m
Water Table correction 0.5 Facter of Safety 2.5
Reference Borehole ALL Depth Factor 1.0
Net SBC (based on shear critieria) 51 T/m2 Rigidity Factor 0.8
Existing Ground Level Layer 1
GWL N value 24
Correction
factor 1.3
Corr.N 1.3*24= 31
Founding Level B= 2m 3m
Layer 1 Ave. N value -24 Ncorr - 31
Stiff Clayey Silt Thickness - 4.0 m
gsub 1.107 t/m3 4.0 m
Depth of Influence 7m
C= 1.5 log 10
Layer H (m) qc (T/m2) po (T/m2) (qc/p0) Δp (p0+Δp/p0) S (mm)
1 4 632 5.54 171.28 33.38 0.85 45.55
114
SETTLEMENT CALCULATION AS PER IS 8009 PART 1
As per Cl.9.1.2, Method Based on Static Cone Penetration Test
Dobaspet Site
Design Assumptions
Existing Ground Level 0.0 m Shape of the footing Square
Founding Level 1.5 m Width of footing (B) 3.0 m
Depth of Influence 6.0 m Length of footing (L) 3.0 m
Allowable settlement 50.0 mm Depth of Foundation (D) 1.5 m
Water Table correction 0.5 Facter of Safety 2.5
Reference Borehole ALL Depth Factor 1.0
Net SBC (based on shear critieria) 31 T/m2 Rigidity Factor 0.8
Existing Ground Level Layer 1
GWL N value 21
Correction
factor 1.6
Corr.N 1.6*21= 34
C= 1.5 log 10
Layer H (m) qc (T/m2) po (T/m2) (qc/p0) Δp (p0+Δp/p0) S (mm)
1 6 693 4.98 208.72 20.54 0.71 46.97
115
SETTLEMENT CALCULATION AS PER IS 8009 PART 1
As per Cl.9.1.2, Method Based on Static Cone Penetration Test
Dobaspet Site
Design Assumptions
Existing Ground Level 0.0 m Shape of the footing Square
Founding Level 2.0 m Width of footing (B) 3.0 m
Depth of Influence 6.0 m Length of footing (L) 3.0 m
Allowable settlement 50.0 mm Depth of Foundation (D) 2.0 m
Water Table correction 0.5 Facter of Safety 2.5
Reference Borehole ALL Depth Factor 1.0
Net SBC (based on shear critieria) 33 T/m2 Rigidity Factor 0.8
Existing Ground Level Layer 1
GWL N value 22
Correction
factor 1.5
Corr.N 1.5*22= 33
Founding Level B= 3m 2m
Layer 1 Ave. N value -22 Ncorr - 33
Stiff Clayey Silt Thickness - 6.0 m
gsub 1.107 t/m3 6.0 m
Depth of Influence 8m
C= 1.5 log 10
Layer H (m) qc (T/m2) po (T/m2) (qc/p0) Δp (p0+Δp/p0) S (mm)
1 6 652 5.54 176.69 21.55 0.69 53.93
116
SETTLEMENT CALCULATION AS PER IS 8009 PART 1
As per Cl.9.1.2, Method Based on Static Cone Penetration Test
Dobaspet Site
Design Assumptions
Existing Ground Level 0.0 m Shape of the footing Square
Founding Level 3.0 m Width of footing (B) 3.0 m
Depth of Influence 6.0 m Length of footing (L) 3.0 m
Allowable settlement 50.0 mm Depth of Foundation (D) 3.0 m
Water Table correction 0.5 Facter of Safety 2.5
Reference Borehole ALL Depth Factor 1.0
Net SBC (based on shear critieria) 28 T/m2 Rigidity Factor 0.8
Existing Ground Level Layer 1
GWL N value 24
Correction
factor 1.3
Corr.N 1.3*24= 31
Founding Level B= 3m 3m
Layer 1 Ave. N value -24 Ncorr - 31
Stiff Clayey Silt Thickness - 6.0 m
gsub 1.107 t/m3 6.0 m
Depth of Influence 11 m
C= 1.5 log 10
Layer H (m) qc (T/m2) po (T/m2) (qc/p0) Δp (p0+Δp/p0) S (mm)
1 6 632 6.64 142.73 17.28 0.56 53.87
117
SETTLEMENT CALCULATION AS PER IS 8009 PART 1
As per Cl.9.1.2, Method Based on Static Cone Penetration Test
Dobaspet Site
Design Assumptions
Existing Ground Level 0.0 m Shape of the footing Square
Founding Level 1.5 m Width of footing (B) 4.0 m
Depth of Influence 8.0 m Length of footing (L) 4.0 m
Allowable settlement 50.0 mm Depth of Foundation (D) 1.5 m
Water Table correction 0.5 Facter of Safety 2.5
Reference Borehole ALL Depth Factor 1.0
Net SBC (based on shear critieria) 22 T/m2 Rigidity Factor 0.8
Existing Ground Level Layer 1
GWL N value 21
Correction
factor 1.6
Corr.N 1.6*21= 34
C= 1.5 log 10
Layer H (m) qc (T/m2) po (T/m2) (qc/p0) Δp (p0+Δp/p0) S (mm)
1 8 693 6.09 170.77 14.24 0.52 56.48
118
SETTLEMENT CALCULATION AS PER IS 8009 PART 1
As per Cl.9.1.2, Method Based on Static Cone Penetration Test
Dobaspet Site
Design Assumptions
Existing Ground Level 0.0 m Shape of the footing Square
Founding Level 2.0 m Width of footing (B) 4.0 m
Depth of Influence 8.0 m Length of footing (L) 4.0 m
Allowable settlement 50.0 mm Depth of Foundation (D) 2.0 m
Water Table correction 0.5 Facter of Safety 2.5
Reference Borehole ALL Depth Factor 1.0
Net SBC (based on shear critieria) 20 T/m2 Rigidity Factor 0.8
Existing Ground Level Layer 1
GWL N value 22
Correction
factor 1.5
Corr.N 1.5*22= 33
Founding Level B= 4m 2m
Layer 1 Ave. N value -22 Ncorr - 33
Stiff Clayey Silt Thickness - 8.0 m
gsub 1.107 t/m3 8.0 m
Depth of Influence 10 m
C= 1.5 log 10
Layer H (m) qc (T/m2) po (T/m2) (qc/p0) Δp (p0+Δp/p0) S (mm)
1 8 652 6.64 147.24 12.45 0.46 57.38
119
SETTLEMENT CALCULATION AS PER IS 8009 PART 1
As per Cl.9.1.2, Method Based on Static Cone Penetration Test
Dobaspet Site
Design Assumptions
Existing Ground Level 0.0 m Shape of the footing Square
Founding Level 3.0 m Width of footing (B) 4.0 m
Depth of Influence 8.0 m Length of footing (L) 4.0 m
Allowable settlement 50.0 mm Depth of Foundation (D) 3.0 m
Water Table correction 0.5 Facter of Safety 2.5
Reference Borehole ALL Depth Factor 1.0
Net SBC (based on shear critieria) 18 T/m2 Rigidity Factor 0.8
Existing Ground Level Layer 1
GWL N value 24
Correction
factor 1.3
Corr.N 1.3*24= 31
Founding Level B= 4m 3m
Layer 1 Ave. N value -24 Ncorr - 31
Stiff Clayey Silt Thickness - 8.0 m
gsub 1.107 t/m3 8.0 m
Depth of Influence 11 m
C= 1.5 log 10
Layer H (m) qc (T/m2) po (T/m2) (qc/p0) Δp (p0+Δp/p0) S (mm)
1 8 632 7.75 122.34 10.28 0.37 55.21
120
Annexure G
Core Box Photographs
BH 2 BH 3
BH 4 BH 5
BH 6 BH 7
121
BH 8 BH 9
BH 10 BH 11
BH 12 BH 13
122
BH 14 BH 15
BH 16 BH 17
BH 18 BH 19
123