Contents
1. Introduction .............................................................................................................. 3
2. Calculations ............................................................................................................. 3
2.1. Design Specifications ......................................................................................... 3
2.2. Given Data ......................................................................................................... 3
2.3. Schematic Diagram ............................................................................................ 4
2.4. Ts diagram (ideal): ................................................................................................ 4
2.5. Formulas ............................................................................................................... 5
3. Calculations ............................................................................................................. 5
4. Results ................................................................................................................... 17
...................................................................................................................................... 17
5. EES (Engineering Equation Solver) ....................................................................... 17
5.1. Code ................................................................................................................ 18
5.2. Results ............................................................................................................. 19
5.3. Parametric Study.............................................................................................. 20
5.3.1. P-1 vs Efficiency ........................................................................................ 20
5.3.2. P-6 vs Efficiency ........................................................................................ 20
5.3.3. T-1 vs Efficiency ........................................................................................ 21
6. Conclusion ............................................................................................................. 21
Page 2 of 21
1. Introduction
This report covers the Complex Engineering Problem (CEP) of designing a Steam
Power Plant to produce 250MW of Electricity.
• One Reheat
• Two Feed heaters ( One Open & One Closed )
It includes varied aspects like the mathematical Calculation and EES. This report
talks in length about the scope of the CEP, methodology employed, parametric
study, and discusses the results obtained. Results obtained are shown with the
help of graphs and tables to better grasp the concept.
2. Calculations
2.1. Design Specifications
Following were the steps involved in designing this CEP.
Enthalpy
Entropy
Pressure
Temperature
Work Done
Mass Flowrate
Thermal Efficiency
2.2. Given Data
Turbine 1 Inlet Pressure = 8 Mpa
Condenser Pressure = 0.008 MPa
Turbine 1 temperature = 480 º C
Page 3 of 21
2.3. Schematic Diagram
REHEAT 3-4
SECOND
TURBINE 4-6
FEEDWATER
HEATERS( 5-9) (2-
12)
Page 4 of 21
2.5. Formulas
𝑋𝑛 = 𝑆𝑛 − 𝑆𝑓/𝑆𝑔 − 𝑆𝑓
𝐻𝑛 = 𝐻𝑓 + 𝑥𝑛𝐻𝑓𝑔
𝑌’ = 𝐻11 − 𝐻10/𝐻2 − 𝐻12
𝑌” = ((1 − 𝑌’)𝐻8 + 𝑌’𝐻13 – 𝐻9))/(𝐻8 − 𝐻5)
Work done by turbine:
3. Calculations
Page 5 of 21
Page 6 of 21
Page 7 of 21
Page 8 of 21
Page 9 of 21
Page 10 of 21
Page 11 of 21
Page 12 of 21
Page 13 of 21
Page 14 of 21
Page 15 of 21
Page 16 of 21
4. Results
Page 17 of 21
5.1. Code
Page 18 of 21
5.2. Results
Page 19 of 21
5.3. Parametric Study
5.3.1. P-1 vs Efficiency
Page 20 of 21
5.3.3. T-1 vs Efficiency
6. Conclusion
The aim of this CEP was to understand how Power plant works and how different
operations inside it take place and how to use mathematical/theoretical concepts
while doing a project or a solving a real-world problem.
We also analyzed how varying different parameters effect the efficiency of the
system.
Page 21 of 21