PRE-START

PROJECT GEN NO. 1

JOB No. DATE

CUSTOMER DETAILS

COMPANY CONTACT

MAKE RUN HOURS

MODEL FLEET NO.

SERIAL NO. ENGINE

FOLLOW UP
CHECKLIST (all lines must be completed) OK NOT OK N/A REQ'D NOTES

Current electrical test tag displayed

Check engine oil level using dipstick

Check radiator, engine & pipework for leaks

Check fuel level & record

Check coolant level

Check fire extinguisher is in date

Check battery terminals

Check fan belt tension and serviceability

Maintenance reports

Operators manual

Emergency instructions visible (labelling)

EMERGENCY STOP FUNCTIONS

Visiual of electrical Installation

Fuel Hose connections secured and return is flowing

3-way Fuel valves are directing from the same tank

Overall cleanliness

COMMENTS

I hereby certify I have carried out the above tests, readings and inspections as per Schedule, and to the best of my knowledge.

VIKING TECHNICAN CUSTOMER

Page 1 of 15
PRE-START
PROJECT GEN NO. 2

JOB No. DATE 8/15/2022

CUSTOMER DETAILS

COMPANY CONTACT

MAKE RUN HOURS

MODEL FLEET NO.

SERIAL NO. ENGINE

FOLLOW UP
CHECKLIST (all lines must be completed) OK NOT OK N/A REQ'D NOTES

Current electrical test tag displayed ✓

Check engine oil level using dipstick

Check radiator, engine & pipework for leaks

Check fuel level & record

Check coolant level

Check fire extinguisher is in date

Check battery terminals

Check fan belt tension and serviceability

Maintenance reports

Operators manual

Emergency instructions visible (labelling)

EMERGENCY STOP FUNCTIONS

Visiual of electrical Installation

Fuel Hose connections secured and return is flowing

3-way Fuel valves are directing from the same tank

Overall cleanliness

COMMENTS

I hereby certify I have carried out the above tests, readings and inspections as per Schedule, and to the best of my knowledge.

VIKING TECHNICAN CUSTOMER

Page 2 of 15
PRE-START
PROJECT GEN NO. 3

JOB No. DATE 8/15/2022

CUSTOMER DETAILS

COMPANY CONTACT

MAKE RUN HOURS

MODEL FLEET NO.

SERIAL NO. ENGINE

FOLLOW UP
CHECKLIST (all lines must be completed) OK NOT OK N/A REQ'D NOTES

Current electrical test tag displayed ✓

Check engine oil level using dipstick

Check radiator, engine & pipework for leaks

Check fuel level & record

Check coolant level

Check fire extinguisher is in date

Check battery terminals

Check fan belt tension and serviceability

Maintenance reports

Operators manual

Emergency instructions visible (labelling)

EMERGENCY STOP FUNCTIONS

Visiual of electrical Installation

Fuel Hose connections secured and return is flowing

3-way Fuel valves are directing from the same tank

Overall cleanliness

COMMENTS

I hereby certify I have carried out the above tests, readings and inspections as per Schedule, and to the best of my knowledge.

VIKING TECHNICAN CUSTOMER

Page 3 of 15
DOC NO. VIK_ITR_GEN_020
COMMISSIONING RESULTS DATE: 2/2/2020
GENERATOR
REVISION: B

PROJECT: DATE: 8/15/2022


GENERATOR DETAILS
FLEET NO: GENERATOR SERIAL NO:

GENERATOR SIZE: RATED CURRENT:

ENGINE TYPE: ENGINE SERIAL NO.

ALTERNATOR TYPE: ALTERNATOR SERIAL NO.


SPEED GOVERNOR

MANUFACTURER: TYPE:

SERIAL NO. NOMINAL SPEED:

GAIN SETTING: DROOP SETTING:


AUTOMATIC VOLTAGE REGULATOR (AVR)

MANUFACTURER: TYPE:

NOMINAL VOLTAGE: SERIAL NO.


CIRCUIT BREAKER
MANUFACTURER: TYPE:

TRIP UNIT TYPE: BASE CURRENT (In):

TRIP UNIT SERIAL NO. L (I1max=In IEC60947.2)

TRIP CURVE SELECTION: t1 (I = 3 x I1)


S (SHORT CIRCUIT DELAYED) t2
I ( IxIN - INSTANTANEOUS ) t2
FREQUENCY SELECTION: InN (NEUTRAL)
GENERATOR CONTROLLER

MANUFACTURER: TYPE:

SERIAL NO. HARDWARE VERSION

CONTROLLER ADDRESS: CONFIRM PARAMETERS:

FIRMWARE VERSION: CONFIRM PARAMETERS:


ALTERNATOR

IR TEST 3Ø TO EARTH CT RATIO

SENSING CABLES SECURED CT s SECURED IN PLACE

EARTH LEAKAGE CT POWER CABLES SECURED

END FLOAT CABLE ENTRY GLANDS TIGHT

FLANGE MOUNTING BOLTS PHASE ROTATION


TEST INSTRUMENTS
MAKE / MODEL SERIAL NO CALIBRATION DATE

REMARKS

I hereby certify I have carried out the above tests, readings and inspections as per Schedule, and to the best of my knowledge.

NAME ELECTRICAL LICENCE NO. STATE SIGNATURE DATE

Page 4 of 15
VIKING INDUSTRIAL SALES PTY LTD ABN: 61 633 360 915

PROJECT: DATE:
GENERATOR PROTECTION
OPERATION
FUNCTION SETTING REMARKS
ACTION CONFIRMED
SD
EMERGENCY STOP 1 SD (SHUTDOWN) + CB TRIP
CB TRIP
SD
EMERGENCY STOP 2 SD (SHUTDOWN) + CB TRIP
CB TRIP
SD
EMERGENCY STOP 3 SD (SHUTDOWN) + CB TRIP
CB TRIP
SD
KEY SWITCH OFF SD (SHUTDOWN) + CB TRIP
CB TRIP
SD
HIGH WATER TEMP SWITCH 1 SD (SHUTDOWN) + CB TRIP
CB TRIP
SD
HIGH WATER TEMP SWITCH 2 SD (SHUTDOWN) + CB TRIP
CB TRIP
SD
LOW OIL PRESSURE SD (SHUTDOWN) + CB TRIP
CB TRIP
SD
OVERSPEED SD (SHUTDOWN) + CB TRIP
CB TRIP
SD
UNDERSPEED SD (SHUTDOWN) + CB TRIP
CB TRIP
SD
EARTH LEAKAGE TRIP ONLY + ALARM
CB TRIP
SD
FAN TRIP SD (SHUTDOWN) + CB TRIP
CB TRIP
SD
GCB TRIP TRIP ONLY
CB TRIP
SD
INTERTRIP TRIP ONLY + ALARM
CB TRIP
SD
BUS SENSING CB TRIP TRIP ONLY + ALARM
CB TRIP
SD
OVERVOLTAGE SD (SHUTDOWN) + CB TRIP
CB TRIP
SD
UNDERVOLTAGE SD (SHUTDOWN) + CB TRIP
CB TRIP
SD
OVER FREQUENCY SD (SHUTDOWN) + CB TRIP
CB TRIP
SD
UNDER FREQUENCY SD (SHUTDOWN) + CB TRIP
CB TRIP

REMARKS

I hereby certify I have carried out the above tests, readings and inspections as per Schedule, and to the best of my knowledge.

NAME ELECTRICAL LICENCE NO. STATE SIGNATURE DATE

Page 5 of 15
Page 6 of 15
PROJECT: DATE:
GENERATOR LOAD TEST

TEST START TIME AMBIENT TEMPERATURE

TEST LOCATION
VOLTAGE CURRENT ENGINE VALUES
TIME LOAD(kW)
OIL P OIL T COOL T COOL T CHARGE
L1 L2 L3 IL1 IL2 IL3 (BAR) (°C) (GUN) (GAUGE) VOLTAGE RPM HZ

PARALLELLING

MEASURE DEAD CAN BUS NUMBER OF GENERATORS ON THE BUS

GOVERNOR RESPONDS TO BIAS VARIATION AVR RESPONDS TO BIAS VARIATION

POWER MANAGEMENT ENABLED MODE SET TO REL %

LOAD RES START LOAD RES STOP


REMARKS

I hereby certify I have carried out the above tests, readings and inspections as per Schedule, and to the best of my knowledge.

RESPONSIBLE PERSON

NAME ELECTRICAL LICENCE NO. STATE SIGNATURE DATE

CLIENT SIGN-OFF FOR ACCEPTANCE

NAME SIGNATURE DATE


Page 7 of 15
DOC NO. VIK_ITR_GEN_020
COMMISSIONING RESULTS DATE: 2/2/2020
GENERATOR
REVISION: B

PROJECT: DATE: 8/15/2022


GENERATOR DETAILS
FLEET NO: GENERATOR SERIAL NO:

GENERATOR SIZE: RATED CURRENT:

ENGINE TYPE: ENGINE SERIAL NO.

ALTERNATOR TYPE: ALTERNATOR SERIAL NO.


SPEED GOVERNOR

MANUFACTURER: TYPE:

SERIAL NO. NOMINAL SPEED:

GAIN SETTING: DROOP SETTING:


AUTOMATIC VOLTAGE REGULATOR (AVR)

MANUFACTURER: TYPE:

NOMINAL VOLTAGE: SERIAL NO.


CIRCUIT BREAKER
MANUFACTURER: TYPE:

TRIP UNIT TYPE: BASE CURRENT (In):

TRIP UNIT SERIAL NO. L (I1max=In IEC60947.2)

TRIP CURVE SELECTION: t1 (I = 3 x I1)


S (SHORT CIRCUIT DELAYED) t2
I ( IxIN - INSTANTANEOUS ) t2
FREQUENCY SELECTION: InN (NEUTRAL)
GENERATOR CONTROLLER

MANUFACTURER: TYPE:

SERIAL NO. HARDWARE VERSION

CONTROLLER ADDRESS: CONFIRM PARAMETERS:

FIRMWARE VERSION: CONFIRM PARAMETERS:


ALTERNATOR

IR TEST 3Ø TO EARTH CT RATIO

SENSING CABLES SECURED CT s SECURED IN PLACE

EARTH LEAKAGE CT POWER CABLES SECURED

END FLOAT CABLE ENTRY GLANDS TIGHT

FLANGE MOUNTING BOLTS PHASE ROTATION


TEST INSTRUMENTS
MAKE / MODEL SERIAL NO CALIBRATION DATE
3/1/2020

REMARKS

I hereby certify I have carried out the above tests, readings and inspections as per Schedule, and to the best of my knowledge.

NAME ELECTRICAL LICENCE NO. STATE SIGNATURE DATE

Page 8 of 15
PROJECT: DATE:
GENERATOR PROTECTION

FUNCTION SETTING OPERATION REMARKS


ACTION CONFIRMED
SD
EMERGENCY STOP 1 SD (SHUTDOWN) + CB TRIP
CB TRIP
SD
EMERGENCY STOP 2 SD (SHUTDOWN) + CB TRIP
CB TRIP
SD
EMERGENCY STOP 3 SD (SHUTDOWN) + CB TRIP
CB TRIP
SD
KEY SWITCH OFF SD (SHUTDOWN) + CB TRIP
CB TRIP
SD
HIGH WATER TEMP SWITCH 1 SD (SHUTDOWN) + CB TRIP
CB TRIP
SD
HIGH WATER TEMP SWITCH 2 SD (SHUTDOWN) + CB TRIP
CB TRIP
SD
LOW OIL PRESSURE SD (SHUTDOWN) + CB TRIP
CB TRIP
SD
OVERSPEED SD (SHUTDOWN) + CB TRIP
CB TRIP
SD
UNDERSPEED SD (SHUTDOWN) + CB TRIP
CB TRIP
SD
EARTH LEAKAGE TRIP ONLY + ALARM
CB TRIP
SD
FAN TRIP SD (SHUTDOWN) + CB TRIP
CB TRIP
SD
GCB TRIP TRIP ONLY
CB TRIP
SD
INTERTRIP TRIP ONLY + ALARM
CB TRIP
SD
BUS SENSING CB TRIP TRIP ONLY + ALARM
CB TRIP
SD
OVERVOLTAGE SD (SHUTDOWN) + CB TRIP
CB TRIP
SD
UNDERVOLTAGE SD (SHUTDOWN) + CB TRIP
CB TRIP
SD
OVER FREQUENCY SD (SHUTDOWN) + CB TRIP
CB TRIP
SD
UNDER FREQUENCY SD (SHUTDOWN) + CB TRIP
CB TRIP

REMARKS

I hereby certify I have carried out the above tests, readings and inspections as per Schedule, and to the best of my knowledge.

NAME ELECTRICAL LICENCE NO. STATE SIGNATURE DATE

Page 9 of 15
Page 10 of 15
PROJECT: DATE:
GENERATOR LOAD TEST

TEST START TIME 08:30:00 AM AMBIENT TEMPERATURE

TEST LOCATION
VOLTAGE CURRENT ENGINE VALUES
TIME LOAD(kW)
OIL P OIL T COOL T COOL T CHARGE
L1 L2 L3 IL1 IL2 IL3 (BAR) (°C) (GUN) (GAUGE) VOLTAGE RPM HZ

PARALLELLING

MEASURE DEAD CAN BUS NUMBER OF GENERATORS ON THE BUS

GOVERNOR RESPONDS TO BIAS VARIATION AVR RESPONDS TO BIAS VARIATION

POWER MANAGEMENT ENABLED MODE SET TO REL %

LOAD RES START LOAD RES STOP

REMARKS

I hereby certify I have carried out the above tests, readings and inspections as per Schedule, and to the best of my knowledge.

RESPONSIBLE PERSON
NAME ELECTRICAL LICENCE NO. STATE SIGNATURE DATE

CLIENT SIGN-OFF FOR ACCEPTANCE


NAME SIGNATURE DATE

Page 11 of 15
DOC NO. VIK_ITR_GEN_020
COMMISSIONING RESULTS DATE: 2/2/2020
GENERATOR
REVISION: B

PROJECT: DATE: 8/15/2022


GENERATOR DETAILS
FLEET NO: GENERATOR SERIAL NO:

GENERATOR SIZE: RATED CURRENT:

ENGINE TYPE: ENGINE SERIAL NO.

ALTERNATOR TYPE: ALTERNATOR SERIAL NO.


SPEED GOVERNOR

MANUFACTURER: TYPE:

SERIAL NO. NOMINAL SPEED:

GAIN SETTING: DROOP SETTING:


AUTOMATIC VOLTAGE REGULATOR (AVR)

MANUFACTURER: TYPE:

NOMINAL VOLTAGE: SERIAL NO.


CIRCUIT BREAKER
MANUFACTURER: TYPE:

TRIP UNIT TYPE: BASE CURRENT (In):

TRIP UNIT SERIAL NO. L (I1max=In IEC60947.2)

TRIP CURVE SELECTION: t1 (I = 3 x I1)


S (SHORT CIRCUIT DELAYED) t2
I ( IxIN - INSTANTANEOUS ) t2
FREQUENCY SELECTION: InN (NEUTRAL)
GENERATOR CONTROLLER

MANUFACTURER: TYPE:

SERIAL NO. HARDWARE VERSION

CONTROLLER ADDRESS: CONFIRM PARAMETERS:

FIRMWARE VERSION: CONFIRM PARAMETERS:


ALTERNATOR

IR TEST 3Ø TO EARTH CT RATIO

SENSING CABLES SECURED CT s SECURED IN PLACE

EARTH LEAKAGE CT POWER CABLES SECURED

END FLOAT CABLE ENTRY GLANDS TIGHT

FLANGE MOUNTING BOLTS PHASE ROTATION


TEST INSTRUMENTS
MAKE / MODEL SERIAL NO CALIBRATION DATE
3/1/2020

REMARKS

I hereby certify I have carried out the above tests, readings and inspections as per Schedule, and to the best of my knowledge.

NAME ELECTRICAL LICENCE NO. STATE SIGNATURE DATE

Page 12 of 15
PROJECT: DATE:
GENERATOR PROTECTION

FUNCTION SETTING OPERATION REMARKS


ACTION CONFIRMED
SD
EMERGENCY STOP 1 SD (SHUTDOWN) + CB TRIP
CB TRIP
SD
EMERGENCY STOP 2 SD (SHUTDOWN) + CB TRIP
CB TRIP
SD
EMERGENCY STOP 3 SD (SHUTDOWN) + CB TRIP
CB TRIP
SD
KEY SWITCH OFF SD (SHUTDOWN) + CB TRIP
CB TRIP
SD
HIGH WATER TEMP SWITCH 1 SD (SHUTDOWN) + CB TRIP
CB TRIP
SD
HIGH WATER TEMP SWITCH 2 SD (SHUTDOWN) + CB TRIP
CB TRIP
SD
LOW OIL PRESSURE SD (SHUTDOWN) + CB TRIP
CB TRIP
SD
OVERSPEED SD (SHUTDOWN) + CB TRIP
CB TRIP
SD
UNDERSPEED SD (SHUTDOWN) + CB TRIP
CB TRIP
SD
EARTH LEAKAGE TRIP ONLY + ALARM
CB TRIP
SD
FAN TRIP SD (SHUTDOWN) + CB TRIP
CB TRIP
SD
GCB TRIP TRIP ONLY
CB TRIP
SD
INTERTRIP TRIP ONLY + ALARM
CB TRIP
SD
BUS SENSING CB TRIP TRIP ONLY + ALARM
CB TRIP
SD
OVERVOLTAGE SD (SHUTDOWN) + CB TRIP
CB TRIP
SD
UNDERVOLTAGE SD (SHUTDOWN) + CB TRIP
CB TRIP
SD
OVER FREQUENCY SD (SHUTDOWN) + CB TRIP
CB TRIP
SD
UNDER FREQUENCY SD (SHUTDOWN) + CB TRIP
CB TRIP

REMARKS

I hereby certify I have carried out the above tests, readings and inspections as per Schedule, and to the best of my knowledge.

NAME ELECTRICAL LICENCE NO. STATE SIGNATURE DATE

Page 13 of 15
Page 14 of 15
PROJECT: DATE:
GENERATOR LOAD TEST

TEST START TIME 08:30:00 AM AMBIENT TEMPERATURE

TEST LOCATION
VOLTAGE CURRENT ENGINE VALUES
TIME LOAD(kW)
OIL P OIL T COOL T COOL T CHARGE
L1 L2 L3 IL1 IL2 IL3 (BAR) (°C) (GUN) (GAUGE) VOLTAGE RPM HZ

PARALLELLING

MEASURE DEAD CAN BUS NUMBER OF GENERATORS ON THE BUS

GOVERNOR RESPONDS TO BIAS VARIATION AVR RESPONDS TO BIAS VARIATION

POWER MANAGEMENT ENABLED MODE SET TO REL %

LOAD RES START LOAD RES STOP

REMARKS

I hereby certify I have carried out the above tests, readings and inspections as per Schedule, and to the best of my knowledge.