Presented by
This report is authentic and has never been previously submitted for any university.
DATE……………….
DATE………………….
DATE………………….
ii
SHEET OF CORRECTIONS AFTER DEFENCE
This dissertation has been reviewed and corrected in accordance with the jury’s observations.
DATE……………………….…………….
CERTICATION
DATE………………………. DATE……………………...
DATE…………………………………. DATE……………………………….
3
DEDICATION
ii
ACKNOWLEDGEMENT
This dissertation becomes a reality, thanks to the kind support and encouragement from the
following individuals:
- I wish to first thank the Almighty God for his blessing hands over my life and his support
throughout this internship.
- Pr. IDRISSOU ALIOUM the rector of the University of Maroua for supporting us in
the course of this training.
- Pr. LOURA BENGUELLAH BENOIT the DEAN of the FMIP for the academic
guidance.
- Pr. GHOGOMU Richard TANWI the head of Department of Industrial Safety, Quality
and Environment and Vice Dean in charge of Programs and Academic Affaire, I want to
mark my sign of gratitude and expression for all his support and orientation in both
academic and professional aspects.
- To all the Teachers of the Faculty of Mines and Petroleum Industries precisely those of the
department of industrial safety, quality and environment for the knowledge, guidance and
support done toward us in the course of our training.
- General Director of SAGRI S.A Mr. ALHADJI NANA BOUBA DJODA for given us
the opportunity to have an internship.
- My professional supervisor Eng. Kingsly NCHAPDONG CHEFOR Assistant head of
quality management system for all his mental and physical efforts he made regarding my
professional work and life.
- Mmy family members MUM (BATEM Victorine and BATEM loveline) my dad (SUH
Romanus) my siblings (SAKWE Tuphan AYUK, LUM Miriam, AKWA Lindadel,
BATEM Royce) and uncles and aunts for this great efforts placed on me during the genesis
of my studies.
- Mr. WATARA of his kind supports and encouragements.
- The personnel of SAGRI S.A. for their encouragements and spirit of teamwork.
- Eng. NANJE Boris for his efforts place in going through my work for corrections.
iii
TABLE OF CONTENT
ABSTRACT ................................................................................................................................. x
RESUME .....................................................................................................................................xi
Context ...................................................................................................................................... 1
Objective ................................................................................................................................... 3
Hypothesis................................................................................................................................. 3
Introduction .................................................................................................................................. 5
iv
I.1.1.7 Politics of SAGRI S.A ............................................................................................. 14
I.2-Literature Review.................................................................................................................. 19
Introduction ................................................................................................................................ 28
v
II.2.1.5 Risk identification using 5WH tool. ................................................................... 32
Conclusion .................................................................................................................................. 41
Introduction ................................................................................................................................ 42
III.5 Professional Risks Assessment using the APR tool (table 12) ....................................... 50
RECOMMENDATIONS............................................................................................................ 72
ANNEX ....................................................................................................................................... II
vi
LIST OF FIGURES
vii
LIST OF TABLES
viii
LIST OF ABBREVIATIONS
UC: Unconformity
C: Conformity
ix
ABSTRACT
A study carried out at SAGRI during the period from May 2021 to August 2021
have as general objective; an assessment of professional risks within the production unit of SAGRI
S.A in order to reduce or eliminate all possible risks and proposed control preventive measures.
The first methodology use is risks identification, consists of a documentary review on similar works
of the same theme. Thereafter, brainstorming and checklist which were related to the organization,
25 out of 32 employees confirmed the existence of several risks found in the unit of production and
this risks were categorized by the different families by the help of ISHIKAWA diagram of which
we identified 14 problems in the family of Milieu,08 problems from material, 06 problems Man-
labour 05 from method. This risks were further prioritized by using the PARETO diagram which
we found that 80% of the problems or risks where caused by 20% of risks found in the family of
milieu. Furthermore, risk assessment was carried using the Preliminary Risk Analysis table
where 53% of risk due to internal circulation of forklift,55% confirms the existence of biological
risk 51% confirms risk of slip, trip, fall 52%, risk due to inadequate lightening 53% noise risk 55%.
To facilitate understandings, weekly site visits were carried out for better observing the medium,
detecting the risks related to each activity and the means set up to reduce / eliminate them. The
results categorized according to the Ishikawa diagram show that; investigations carried out from
the checklist and it gave the following risks problems; In addition, a risk analysis and evaluation
methodology was carried out by applying the preliminary risk analysis method and risks with high
gravity that acts as threats in the unit of production includes; risk of vibration, risk due to internal
circulation of forklift, risk due to inadequate lightening, risk of slip, trip, fall. To reduce/eliminate
these risks, an action plan was establishing in order to allow a better integration of QHSE aspects.
The application of the regulatory requirements in force, reinforce the capacities of the personnel
on risks related to quality, hygiene, safety and environment and instauration of synergy between
the personnel and the local populations on intervention strategies event of emergency which will
be a better strategy to integrate QHSE aspects a SAGRI S.A.
x
RESUME
Une étude réalisée à l’entreprise SAGRI durant la période de mai 2021 à août 2021 avoir
comme objectif général ; une évaluation des risques professionnels au sein de l'unité de production
de SAGRI SA afin de réduire ou d'éliminer tous les risques possibles et de proposer des mesures
préventives de contrôle. La première méthodologie utilisée est l'identification des risques, consiste
en une revue documentaire sur des œuvres similaires du même thème. Par la suite, brainstorming
et check-list qui étaient liés à l'organisation, 25 salariés sur 32 ont confirmé l'existence de plusieurs
risques retrouvés dans l'unité de production et ces risques ont été catégorisés par les différentes
familles à l'aide du schéma ISHIKAWA dont nous avons identifié 14 problèmes dans la famille
du Milieu,08 problèmes de matériel, 06 problèmes Homme-travail, 05 de méthode. Ces risques ont
été davantage hiérarchisés en utilisant le diagramme de PARETO dont nous avons constaté que
80% des problèmes ou des risques étaient causés par 20% des risques trouvés dans la famille du
milieu. De plus, l'évaluation des risques a été réalisée à l'aide du tableau d'Analyse Préliminaire
des risques où 53% du risque dû à la circulation interne du chariot élévateur, 55% confirme
l'existence d'un risque biologique 51% confirme le risque de glissade, trébuchement, chute 52%,
risque dû à un éclairage insuffisant 53% risque de bruit 55%. Pour faciliter les compréhensions,
des visites hebdomadaires sur site ont été effectuées pour une meilleure observation du milieu,
détecter les risques liés à chaque activité et les moyens mis en place pour les réduire/éliminer. Les
résultats classés selon le diagramme d'Ishikawa montrent que ; enquêtes menées de la liste de
contrôle et cela a donné les problèmes de risques suivants ; En outre, une méthodologie d'analyse
et d'évaluation des risques a été réalisée en appliquant la méthode d'analyse préliminaire des risques
et les risques à haute gravité qui agissent comme des menaces dans l'unité de production
comprennent ; risque de vibration, risque dû à la circulation interne du chariot élévateur, risque dû
à un éclairage insuffisant, risque de glissade, de trébuchement, de chute. Pour réduire/éliminer ces
risques, un plan d'action a été mise en place afin de permettre une meilleure intégration des aspects
QHSE a SAGRI SA
xi
GENERAL INTRODUCTION
In this introductory chapter we present our motivations for this study. Through the highlighting
of the context, the problematic as well as the objectives targeted by this work and its organization
Context
Risk management in terms of health, safety, the environment and working conditions are recent
concepts since they appeared in the 19th century with industrial development which constitutes the
hard core around which was built gradually the labor law. The search for working conditions that
guarantee the health, safety and environment of employees remains relevant and represents a
a major concern for many employers, as the risk is present in all activities carried out by man.
(Lyon and Folcroft, 2016)
.However, the news relating to industrial risks has been strong since the beginning of the years
2009. This year was indeed marked by numerous accidents. Major industrial risks as well as all
the debates that accompanied this sometimes dramatic news marked public opinion just like the
holding of the trial relating to the accident at the AZF plant (2001) which was held at
early (2009). We can cite some example of the most recent accidents: Ranging from the accident
in a quartz sand plant of the Jtngxln Mining group in China (2009) to that of the explosion of a
tank wagon filled with LPG (2009) in Italy passing through the explosion of the petrochemical site
of the company Total in Moselle (2009) to this list already long we can still add the one that
occurred in 2009 in the United States in the town of Bryan (Dey, 2001).
In Cameroon the public authorities in the concern of improving the conditions of workers
have fixed the general measures of hygiene and safety in the workplaces included in order 039 /
MTPS / IMT of 1984. Despite all these preventive measures, we can affirm that the zero risk does
not excite because the fires of Necotrans declared in (2017) and Fermencam declared in January,
2018 allow us to look into the concept of: "risk management". Soacam Agro-Industries is part of a
culture prevention of the risks to which its employees and equipment are exposed. This is how that
it never ceases to seek to set up working conditions that guarantee the safety and health of these
employees as well as the protection of the environment. Industry food SAGRI SA Cameroon who
welcomed us as part of our final internship study took the opportunity of our availability to once
again reflect on the actions or means to guarantee these employees better working conditions.
1
Conscious owing to the fact that his activity is not without risk like any industry, the General
Director of SAGRI has decided to go further in the search for working conditions that guarantee
the health and safety of its employees as well as the protection of the environment. This is how an
emergency plan, an environmental and social impact study and the audit were carried out. It is
therefore in this same context that we have been given the task of “propose a more consistent
approach to risk management in terms of health, safety and the environment which aims to improve
working conditions within factory ". The objective of this work is to help promote the conditions
of development that guarantee the health and safety of employees on the industrial site and residents
exposed to SAGRI activities. Created in 2011 in order to meet the demand processed tomato in the
country, SAGRI company is Aware of the fundamental place occupied by health, safety and the
environment at work, is now aiming to improve its working conditions. Job. It projects through a
better consideration of all the important factors of health, safety and the environment to develop its
risk management system and become a reliable and sustainable organization.
Problem statement
Risk management reduces the likelihood of occurrence and the severity of undesired events.by
systematically anticipating risks, assessing their importance and managing them, unwanted or
negative events can be brought under control. It at this point where Soacam Agro-Industries
(SAGRI SA) creating an HSE department with the aim to ensure health, safety and hygiene of
workers at their assign place of workplace. This department still faces numerous problems such as
priority of the company is to boosts its productivity, faces health and safety problems such as lack
of mandatory personal protective equipment’s (PPE), non-compliance with safety instructions and
the view of multiple problems, several near misses, incidents and accidents which were recorded
with respect to the company’s reports on incidents and accidents in the month of February 2021
where a worker fingers where crushed and chops off by rotating machinery in primary packaging
sub-unit, secondly a worker slipped off and fall on a floor where he sustained multiple injuries and
was both victims were hospitalised for some period of time. Faced with this kind of situation, the
company SAGRI S.A most set up an effective risk management in order to reduce or eliminates all
possible threats on worker on their task by application of some risk analysis methods like APR,
5WHs tools and also a proposal an HSE plan of intervention as a means of continue improvements
with respect to international standard ISO 31000 version 2018 and Cameroon legal framework of
2
degree number 039/MTPS/IMT of November 1984 relative to health & safety measures of workers
at work to eradicates all residual risk which may act as threats to workers.
Objective
Our study is made of one general objective and four specific objectives. Specific objectives we will
achieve our overall goal.
Principal objective
➢ The principal objective of our work is to carry out an assessment of professional risks within
the production unit of SAGRI S.A in order to reduce or eliminate all possible risks and
proposed control preventive measures.
Specific objectives
Hypothesis
Hypothesis 1: The poor management of health and safety of workers at the workplace has negative
impacts on the workers, increase cost of charges and reduce the productivity level.
Hypothesis 2: Risk assessment will help to reduce or to limit and to manage the numbers of risk
workers are exposed to existing hazards.
Importance of study
This work on risk assessments is very important as it forms an integral part of an occupational
health and safety management plan for every industry or organization.
Organization of dissertation
In order to carry out our study, a structured organization of our work is essential. To do this, we
have subdivided our work into three (03) chapters, in order to facilitate reading and comprehension.
The first chapter Theoretical framework and literature review which is the subject of brings
together general information on safety industrial and the different types of industrial risks, risk
management, the framework regulations for occupational health and safety as well as the
methodology used to achieve the objectives of our study; Second chapter devoted to the
framework of the study and the approach methodological, describes the SAGRI SA company and
then presents the different methods, tools and means used to solve the problem posed by the study;
The third chapter presents the results obtained at the end of our study in application of the
methodology set out in the previous chapter; Finally, the general conclusion recalls the problem,
the objectives of the study, the results of the study, then the recommendations aimed at ensuring
the application of HSE risk management within the factory.
4
CHAPTER I. THEORETICAL FRAMEWORK AND LITERATURE REVIEW
Introduction
For the purpose of making a meaningful and well understanding of our study, it is important
to have a close look on the notions of our area of study and on health and safety of workers and
review some of the literature work to the study. This chapter is meant to contain the review of
various literatures considered to be relevant to the study.
I.1-Theoretical Framework
SAGRI S.A is part of the NABO HOLDINGS group, which is a grouping of companies
belonging to ALHADJI NANA BOUBA DJODA. Other companies under this group include;
During operationalization in July 2013, the main objectives of SAGRI SA were as follows:
5
• Reduce the rate of unemployment;
• Make available to its customers’ double tomato concentrate of high quality at a low price;
Put in place a new sector of activities
SAGRI S.A is located 5000m from the road junction between the North-west and south-west
Regions, from the town of Douala and more specific along the road leading to TIKO with
geographical coordinates (4o07’56” N 9o34’48” E). Situated in BOMONO BA-MBENGUE village
in the DIBOMBARI sub-division of the Moungo Division, Littoral Region of Cameroon. This
industrial unit has a surface area of about 2.5 hectares.
6
I.1.1.4 Sector of activity and product of SAGRI SA
SAGRI S.A is an Agro-food processing enterprise and the only finished product of the
enterprise is double tomato concentrate with the brand name NEIMA TOMATO. The double
tomato concentrate is a diluted form of the triple concentrate of tomato (TCT, main raw material).
NEIMA tomato is conditioned in sachets of 70g and packaged in cartons each containing 50
sachets. This product is distributed in the CEMAC zone by SOACAM SA.
Production Department
The head of this department has an objective to ensure that the production target set by the
administration is attained while optimizing the cost of production. Production is done continuously
24h/24, 7days/7 ensured by operators working in shift. Activities at this point are coordinated at
each stage of production to ensure constant quality of the product.
Maintenance Department
This department has as objective to put at the disposal of the production department reliable
equipment for effective processing. To do so, they work in partners with contracting company to
ensure deep maintenance of this equipment and a different team responsible for partial maintenance
to assist operators.
7
They are in charge of managing administrative and personnel’s affairs. Some of this task are:
payment of employee, recruitment of employee, staff training, leave management etc.
Logistic department
This department that takes care of the supply of all the raw materials of the plant (TCT, salt,
cartons, scotch, wrapping film etc..) with the help of the purchasing department of the general
management. The triple tomato concentrate arrives from China in drums of about 250kg of
containment and is received by the storekeeper before being stored in the raw materials store.
Before storage, these products undergo a conformity analysis; in case of non-compliance, they are
returned. It is divided into three sub-activities:
• The raw materials store; who is responsible for storage and supplying production with a
request made with a purchase order and the storekeeper responds with proof that is the
delivery voucher;
• Service finished products; the factory two types of finished products: one local the other
export or Arabic these products have at least three to the production room and then transport
to the store fine products where they are delivered by the rule of first in first out;
• Service spare parts, it is a store where the spare parts are stored as its name indicates. These
parts are there to help the maintained department make replacements on the production line
during an outage.
8
I.1.1.5 Organigram of SAGRI S.A
General
administrator
internal audit
IT manager
services
planification
manager
commercial human
head of director of technical
and marketing resource
logistics finance department
director director
head of engineering
head of Responsable Responsable
network Legal HR head of flotte accounting and
commerce service client chaine supply
service technology
9
I.1.1.6 Neima double concentrate tomato process
- The triple concentrate tomato paste: this is the main raw material used for production
and is imported from China in drums having a brix of 36-38% cold break, and a weight
of 242-255kg per drum.
- Salt supplied by SASEL is being used as a preservative.
- Plastics films for packaging the NEIMA double concentrate tomato paste.
- Cartoons for secondary packaging of the sachet tomato paste.
- Scotch for sealing the cartons during packaging.
➢ De-stuffing process
This operation permits the transfer of the raw material to the storage tank by the help of a
suction pump (hoist). To the 4 drums of TCT to be de-stuffed, salt(7kg) and water is added to
facilitate adsorption by the pump and the operation usually last for at most 30 minutes. Before de-
stuffing, four samples from a batch (4 tanks) of the TCT is being collected by some laboratory
technician personnel for analysis. Parameters consider for analysis are: color, brix and pH and if
those parameters are ok then the operator at the de-stuffing can depot.
10
about 6 to 7 minutes before sending to the cooking tank. When homogeneity is attained, the hot
water and mixing values closed and the product is being transfer to the cooking tank.
➢ Concentration or Cooking tank
This operation is being carried out in a vacuum evaporator consisting of 2 layers of steel
surrounding the tomato paste so as to prevent the oxidation of the red pigment lycopene in the
tomato paste. The space between the layers is filled with water heated by hot vapour and the heat
is transferred by means of convection to the tomato mixture for cooking. The depression created
thanks to the vacuum pump favours the entrapment of water or dehydration of the product. During
this process, acids are being evaporated, condensed in a distillatory and collected as water. The
product obtained is passed through a temporal storage tank called the hopper and is progressively
passed through the pasteurizer for pasteurization.
➢ Pasteurization
The process is carried out in a tubular stainless steel in which the product and the vapour
circulate in a counter flow system. The pasteurizer consists of 13 tubes, which facilitates the
exchange of heat between the product and the hot vapour. The main aim of carrying out
pasteurization of the paste is to sterilize the paste by destroying or inactivating organisms and
enzymes that contribute to spoilage including vegetative bacteria but not bacteria spore hence
increasing the shelf life and stability of the paste. The hot water used for this process is at a
temperature of 95- 105 OC and the pasteurization process is carried out at a temperature of 89-93O
C.
➢ Packaging Process
Two types of packaging are being employed in NEIMA namely primary and secondary
packaging. The primary packaging involves the filling of the pasteurized paste in the plastic film
with the help of a packaging machine (UNIVERSAL PACK). The plastic film is being mounted
on the machine, unfolded and filled progressively; the sachets of DCT on leaving the machine
weigh between 70-73g per sachet in a row of seven (07) and column of 10. The secondary
packaging is done after cooling. Here, the DCT is folded in 10 sachets and packed in a carton. A
carton filled with DCT weigh 3.5kg and it contain 50 sachets of DCT.
➢ Cooling Process
11
After the primary packaging process, the packaged paste is passed through a four cooling
chamber for adequate cooling. In the first cooling chamber, water is poured on the sachets and this
water is stored back in a tank, which is reused for the next cooling stage by performing a closed
cycle replaced by water reaches the temperature of 35oc. The second and third cooling chamber is
supplied with water from the cooling tower; it cools continuously in a circuit. The fourth chamber
is the chilling tower, which is not functional.
➢ Palletization
Here, the pelleted cartons of NEIMA double concentrate are been stored for 4 days under
which its quality is been controlled and there’s separation of the bad cartons from the good ones
before transportation to consumers.
12
flow diagram of neima double concentrate tomato production
13
I.1.1.7 Politics of SAGRI S.A
In an objective to fasten these measures, the management deliberately opted for the
implementation and permanent improvement of a management system for the security of food
(SMSDA) based on good production practices and conditioning according to ISO 22000: 2018
norm exigencies.
These taken measures reflect the constant worry of the company to meet legal exigencies,
regulations and expectation of other interested parties. Thus, they rely on the following five pillars:
14
I.1.1.8 Identity of SAGRI S.A
LOGO
Phone : 79 99 68 88 / 79 99 62 77 / 77 11 78 44
E-mail : Sagri.neima@yahoo.fr
Officer (CEO)
15
I.1.2 Presentation of conceptual framework
The study of risk began after World War 2. Risk management has long been associated
with the use of market insurance to protect individuals and companies from various losses
associated with accidents. Different forms of pure risk management, alternatives to market
insurance, surfaced during the 1950s when market Insurance was perceived as very costly and
incomplete (Lyon and Hollcroft 2016). The use of derivatives as financial risk management
instruments arose during the 1970s, and expanded quite rapidly during the 1980s, as companies
intensified their financial risk management. International risk regulation began in the 1990s,
prompting financial firms to develop internal risk management models and capital calculation
formulas to hedge against unanticipated risks and reduce regulatory capital. Governance of risk
management became essential, integrated risk management was introduced and the first risk
manager positions were created (Lyon, and Hollcroft 2016). According to the ILO estimates, every
year over 2.3 million women and men die at work from an occupational injury or disease. Over
350,000 deaths are due to fatal accidents and almost 2 million deaths are due to fatal work-related
diseases (World day for safety and health at work, 2015)
➢ Risk: ISO 45001 defines risks as the combination of the likelihood of occurrence of a work-
related hazardous event(s) or exposure(s) and the severity of injury or ill health that can be
caused by the event(s) or exposure(s).
➢ Professional risks: Risks that acts as threats in a workplace/an occupation (OSH).
➢ Likelihood: Chance of something happening (ISO Guide 73/ANSI/ASSE Z690.1-201
➢ Risk identification: Is a process that is used to find, recognize, and describe the risks that
could affect the achievement of objectives (ISO 45001:2018).
➢ Risk analysis: Is a process that is used to understand the nature, sources, and causes of the
risks that have been identified and to estimate the level of risk (ISO 45001:2018).
16
➢ Risk Assessment: Process of evaluating the risk arising from a hazard taking into account
the adequacy of any existing controls, and deciding whether the risk is acceptable or not.
➢ Qualitative Risk assessments a risk assessment based on subjective ratings (ISO 45001).
➢ Quantitative Risk Assessments: A risk assessment based on numerical ratings (ISO
45001)
➢ Event an Occurrence or change of a particular set of circumstances (ISO Guide
73/ANSI/ASSEZ690.1-2011).
➢ Risk evaluation: Is a process that is used to compare risk analysis results with risk criteria
in order to determine whether or not a specified level of risk is acceptable or tolerable (ISO
45001:2018)
➢ Severity: Severity is defined as the degree of injury or illness which is reasonably
predictable
➢ Risk Control: Process of deciding how and to what extent, reduce or eliminate risk factors
by considering the risk assessment, engineering factors, and social, economic and political
concerns.
➢ Residual Risk: The risk remaining after risk reduction measures have been taken
(ANSI/ASSE Z590.3-2011).
17
I.1.2 Juridical and Institutional framework
Management of
ISO 45001 2018 occupational health
and safety.
18
I.1.2.2 National framework for management of professional risks
The labour code, law n°92-007 of the 14th August 1992, in its title 6 prescribes occupational
safety and health conditions at work as well as several other legal texts of Decree N° 039 /MTPS
/IMT of the 26th November 1984 establishing general health and safety measures at workplace.
I.2-Literature Review
Risk concept the perception of the potential harm associated with a hazardous situation
relates to the concept of risk. The term risk has several meanings. Likewise, the risks may be very
varied nature and many classifications have been proposed. Definitions of risk at two dimensions
are quite close. Risk is a measure of danger combining a measurement of the occurrence of an
adverse event and a measurement of its effects or consequences. And according to OHSAS 18001,
a risk is the combination of the probability and the consequence (s) of the occurrence. However,
there are slightly more definitions complex in which a third dimension appears: acceptability of
the risk, threshold in below which we accept the existence of the danger although its seriousness
and probability of occurrence are not zero. In the remainder of this work, the term risk is
unambiguously linked to the risks incurred in the management of systems.
X X
Hazard Vulnerability Elements-at-risk
19
I.2.2 risk management concept
Organizations, whether they realize it or not, are exposed to hazards and their risks each day
capable of significantly affecting the ability to achieve important business goals or even remain in
business. Risk assessment is an important and sophisticated tool used to assess an organization’s
operational risks so that proper decisions can be made to avoid or effectively mitigate and manage
risks to an acceptable level. It is considered the cornerstone of risk management and the basis for
the practice of Safety. Europe, the importance of operational risk assessment is well known and
publicized as indicated in the following statement from the European Agency for Safety and Health
at Work (EU-OSHA, 2015).
ISO Guide 73/ANSIZ690.1-2011 states that there are three distinct components to the act of “risk
assessment” which are given as follows:
IDENTIFY HAZARDS
AND RISKS
ANALYSE RISKS
RISK MANAGEMENT
PROCESS
EVALUATE RISKS
20
I.2.2.1 Risk identification
The key components of risk identification are the identification of the causes and source of
the risk (hazard in the context of physical harm), events, situations, or circumstances, which could
have a material impact upon objectives and the nature of that impact. Once identified, existing
controls for the risk should also be identified (ISO 31010/ANSI Z690.3-2011). Methods for
identifying existing and potential hazards/risks in the workplace are many. A likely starting point
might begin with collecting available information about the operations to be assessed. Some
hazards are easily identified intuitively or through recent or past experience, while others require
more systematic methods of identification. Depending on the operation or subject of the
assessment, the level of effort will vary accordingly. A simple job or task may only require a job
hazard analysis, while a more complex system may require a series of methods to identify existing
and potential hazards. There are many ways to go about identifying hazards and operations for
assessment, but a systematic approach will likely be more thorough and reliable. Some of the more
common methods and sources used by safety professionals to identify hazards are listed in the
following:
•Brainstorming.
•Checklists.
•Accident/incident investigations
21
Identify Potential harm/ill health condition
Risk analysis involves developing an “understanding” of the risk. This analysis of each
hazard/risk includes the following tasks:
•An estimation of the risk level. The level of risk takes into consideration a combination of the
possible consequences and likelihood. A single event or task can have many possible consequences
and impact multiple assets. Risk analysis can be qualitative, semi quantitative, or quantitative in
nature depending upon of the assessment and available data. Qualitative analyses are the most
common and use descriptors such as “high,” “serious,” “medium,” and “low” for degrees of
severity of consequence, likelihood of occurrence, and risk level. Semi quantitative methods use
numerical ratings for consequence and likelihood to produce a level of risk, which are based on
qualitative descriptive criteria rather than quantitative data. And finally, quantitative analyses,
which are not as common, use estimated values for consequences and their likelihood producing
numerical values of risk in specific units defined in the context. As stated by ISO 31010/ANSI
Z690.3, full quantitative analysis may not always be possible or desirable due to insufficient
information or the needs of the assessment. In many cases, a comparative semi quantitative or
qualitative ranking of risks by qualified assessors is desired for the assessment.
Risk evaluation involves comparing the estimated risk levels with the defined risk criteria to
determine the significance of the level and type. It is based on the combination of estimated
consequences and likelihood and uses information from the hazard/risk identification and risk
analysis phases to make recommendations for decision makers. These decisions may include
implementing further controls, other forms of risk treatment, or avoiding the hazard or operation
all together. Additional inputs to the decision-making process include legal, financial, ethical, and
other considerations. Decisions on treating a risk will likely depend on the costs and benefits of
22
risk and the costs and benefits of implementing improved controls. The “as low as reasonably
practicable” or criteria is used to determine when the cost of further reduction is disproportionate
to the benefits gained in risk reduction and safety (Manuela, 2008). An illustration of the AS LOW
AS REASONABLE PRACTICABLE principle reprinted with permission from ANSI/ASSE
Z690.3 (Courtesy of ASSE) and Fred Manuela. The selected risk assessment matrix is used to
consider both the consequence and likelihood risk levels for each risk. The risk assessment matrix
example provided in is qualitative in nature with risks ranging from “high” to “low.” In the example
matrix, risks that fall in the “low” category would most likely be considered acceptable by an
organization, while those in the “medium” category may be considered acceptable with some
additional controls. Risks in the “serious” category would require immediate action, and those in
the “high” category are considered the highest risk and would be unacceptable to an organization,
requiring immediate action to avoid or reduce the risk to acceptable levels. In each case, the criteria
for severity of consequence and likelihood of occurrence will need to be customized and defined
by the organization’s stakeholders.
There is a panoply of risks in the industrial world, but which differ according to the
activity.
After the construction industry and the woodworking trades, the agro-food industries are one
of the sectors of activity causing the most work accidents and occupational diseases.
➢ Biological risk
This risk is linked to exposure to biological agents. They can be bacteria, viruses, fungi
or parasites. Contamination can be through the skin, through the conjunctiva, by ingestion or
through the respiratory tract.
➢ Chemical hazard
The chemical risk includes the risks associated with the storage of products, their transport in and
outside the company, and their handling. Risks can be linked to their properties physico-chemical
(flammability, instability) or their toxic properties (harmful, corrosive, irritant, etc.).
23
➢ Risk of thermal burns: This risk manifests itself in contact with solids, liquids or
vapours having a high temperature, in contact with flames, when projecting incandescent
elements, when handling cold products.
➢ Electrical hazard
These are the risks of electrocution (passage of electric current) or electrocution (death of
the victim), indirect contact, ignition of an arc or spark, lightning strike.
➢ Explosive risk
➢ Fire risk
A fire can take various forms: Either the flames are predominant with a significant release of
heat, either the fumes are dense, either polluting or toxic gases are emitted, there are many
risks associated with the fire: burns, asphyxiation, irritation, etc.
These are the risks associated with handling objects to accomplish a task (screwdriver, cutter,
scalpel, etc.) or passing them from one state to another (e.g. Opening / closing a door).
➢ Risk associated with repetitive actions
Repetitive gestures are gestures repeated at a relatively high rate, involving excessive
extensions or contractions, or even twisting movements of a part of the body that can lead to
musculoskeletal disorders (MSDs).
These are restrictive gestures and postures resulting from workstations and operating
methods that do not meet ergonomic requirements. This risk is all the greater as the posture
is prolonged over time and there is no interruption in the task to be accomplished.
(Relaxation, other task…).
24
➢ Risk of manual handling
Risk associated with any operation of transporting or supporting a load, including lifting,
laying, pushing, pulling, carrying or moving, which requires the physical effort of one or
more workers. The risk arises when handling is done without mechanical assistance (forklift,
forklift).
These are the risks of shocks or collisions by moving masses, of overturning or crushing.
These risks are mainly linked to the use of pallet trucks, trolleys, overhead cranes, etc.
➢ Mechanical risk
It results from mechanical contact resulting from material contact involving force, energy and
pressure that can result in bodily injury.
These are essentially the risks of falling objects linked to storage on several levels, or in
bulk in large quantities.
Falling from a height can occur when working or accessing at height. The risk generated by
the fall can be a trauma, a shock, a fracture.
➢ Risk related to the thermal environment
In a cold environment, we will rather see the appearance of chills, colds, sore throats, reduced
dexterity, and numbness. In a hot environment, you may have profuse sweating and feel
fatigue, nausea, dizziness, decreased alertness.
➢ Lighting risk
Poor lighting can be the cause of more or less significant physical disorders depending
on the degree of lighting deficiency and the sensitivity of the person. Insufficient lighting
25
compared to the level of precision required for the task, excessive strain on the muscles of
the eyes causes visual fatigue. It Is characterized by three types of symptoms:
- Eye effects: tearing, burning, stinging ...
- Poor lighting can also be the cause of bad handling, embarrassment in carrying out
the work activity. These circumstances are sometimes the cause of accidental situations.
The quality of the air can present conditions of comfort or discomfort but also
particularities likely to affect the conditions of health and safety at work. The risks involved
can be: discomfort, aggression on the respiratory tract (odour’s, dust, etc.) or an allergy
reaction.
➢ Noise
This risk is linked to all sounds that produce an unpleasant, annoying or even painful
hearing sensation. The noise can be continuous or impulsive, it can also come from various
ringing tones (telephones, sirens, horns).
➢ Risk Associates with screen work: Working intensively in front of a screen can
cause health problems. Visual fatigue, tingling, Musculoskeletal disorders related to work
postures (neck pain or joint disorders for example); Stress, nervousness.
Night work imposes a shifted pace of work and life for employees. The biological cycle can
lead to periods of reduced vigilance during night work.
Working with changing schedules can be difficult because it requires a lot of organization on
the part of the worker, in his personal and professional life.
Walking on slippery, uneven or obstructed ground may cause a fall or cause a twist of a joint
or an impact against a material element.
26
We group together all the situations that expose a worker to stress or moral violence in
the course of his work. For stress, 5 factors are distinguished: the task, the organization of
work, work relations, the physical environment and the socio-economic environment. Moral
violence can be harassment, overt side-lining, repeated bullying or mockery
27
CHAPTER II. MATERIALS AND METHODOLOGY
Introduction
This chapter presents the different materials, procedure, methods and techniques used in our
work, it looks at how data were gathered for the work and the help in the accurateness of our
study so as to attain our objective.
II.1 materials
No Material Role
28
-company’s checklists and permit to work.
II.2 Methodology
Table 04 below summarizes our methodological step. It gives a result with respect to each
specific objective in synoptic a representation of the methods and tools used and leads us towards
the results allowing us to achieve our general goal.
We say: "A well identified problem is half solved". So the first step of the preventive
approach of our work consisted in clearly circumscribing the risks present at the SAGRI.SA. To
do this we have collected at the level of each work unit, the information on the work situation. This
was information obtained during interviews with responsible for each work unit on the one hand
and on the other hand for the observations made on the ground.
The initial diagnosis is an important phase to objectively analyze the practice of managing health
and safety risks in the system improving working conditions on workplace. This phase includes
surveys, data collection and analysis.
29
II.2.1.2 desk study
➢ Documentary review
Here the documentary research aimed to bring together and structure all the information
relating to our study topic. This phase was based on written and graphic sources of information. It
consisted in consulting documents such as: The emergency plan, accident reports.
➢ Direct observation
Direct observation is one of the data collection techniques used. The observations made on
the whole site, in particular inside and outside buildings, in the corridors and bare spaces, allowed
us to see at first contact the devices of safety in place within the plant to ensure the health and
safety of workers but also to detect deviations and non-conformities with respect to order 039 /
MTPS / IMT. The data collected are photographs that were taken on an ad hoc basis thanks to a
camera.
II.2.1.3 Collection of data.
Data collection is the second step of this goal. It was made during a month in two parts:
primary data collection and secondary data collection
This was data collected by us. It was done through interviews. The interviews took place
during interviews with the various stakeholders. We have developed a questionnaire sent to some
SAGRI SA staff this questionnaire included so-called "open" questions which required a form
developed response whether by a short or long sentence and questions said "Closed" intended to
be answered by yes or no. For this, all questions were asked in accordance with order 039 / MTPS
/ IMT of 26 November 1984 laying down health and safety measures in the workplace.
We submitted the questionnaire to 32 (thirty-two) people because they are always present in the
daily shift to describe their activity and the risks to which they are exposed during
the performance of their task. Twelve questions were addressed to each of them, the principle being
to find out if employees are aware of what the risk is in terms of health, safety, environment and
what their capacity to react to an unforeseen event are.
30
These are data obtained through existing documentation. It was made at
through the consultation of various documents such as the SAGRI audit, the emergency plan, the
study environmental and social impact analysis of SAGRI SA data, research on
internet and the use of courses given in university.
We have consulted the accident / incident investigation reports, the reports of QHSE
department meetings and we mainly had access to the Health & Safety performance of the
company for the period of 2020.
We visited a few websites. They took us to the work on the theme of risk management. We also
consulted investigation reports, dissertations and thesis.
➢ Exploitation of some courses from the Faculty of Mines and Petroleum Industries.
We have exploited some courses offered in some Universities in the world, including the
University of Maroua -Faculty of mines and petroleum industries.
Risk identification must be carried out in order to find out the causes and consequences of
all possible risks presents in the production unit with the help of a questionnaire (checklist) and
look for the existing control measures put in place.
A checklist is a technique that can be used to identify and manage risks, its often by the form
of questionnaire to check the conformities of activities below is the selected checklist used to
identify risks in the production unit of SAGRI SA.
31
Table 4 : Questionnaire (checklist) for risk identification
References
It is a quality tool that allowed us to ask good questions before tackling the situation or
problem. It is a very important tool because it made it possible to identify all the important elements
when choosing a solution. The 5WHYs can be represented as follows;
WHY? WHO?
Why does it The 5WHY Who is affected?
happen? approach
WHERE?
WHEN?
Where does it
When did it
actually takes
32
Figure 5 : representation of 5WHY tool
Importance of 5WHYs
➢ It helps to quickly identify the root causes of a problem.
➢ Its helps to differentiate between the contributing factors of a problem and its root causes.
➢ It helps to determine between the different root causes of a problem.
➢ It can be learned easily and does not require statistic data’s to be used.
Also called cause-effect diagram or fishbone diagram, or even 5M, the ISHIKAWA diagram
is a special problem-solving tool. More advanced than the 5P (5 Why) and widely used by quality
specialists, this tool aims at categorizing causes which have an influence or which are at the origin
of an effect. The notion of effect refers to the problem we are trying to solve. Once the effect has
been defined, the list of causes which have an influence on the effect must be drawn up, then comes
the classification of these causes into different families which will constitute the edges of the
ISHIKAWA
- (M) Material: These are the causes linked to the various consumables used; raw materials and
materials used and more generally the process inputs, documents, information,
- (M) Machine: equipment, machines, computer hardware, software, technologies,
- (M) Method: specifications (operating mode, process logic), laws, regulations, procedures,
information flows
- (M) Man-labour: the causes linked to human intervention are listed here; habits, personal
qualification, etc.
- (M) Milieu: the workplace, its physical organization, working conditions, each branch receives
other causes or categories hierarchized according to Diagram. The level of detail. The terms
"Means" or "Machines" often replace the category "Equipment". However, there are several
variants of the 5M diagram: - A first variant structured around 6M, which adds to the previous 5
areas that of "Measurement":8M, which adds to the previous one the categories "Management”
and "Means financial Another adds a ninth M, that of "Maintenance" added in the production
universes. Indeed, a lack of maintenance or a bad maintenance can be at the origin of faults (effect).
The 5M diagram can be represented as;
33
METHOD MATERIA MILIEU
L
Potential
Consequences
causes
MAN-
LABOUR MACHINE
Once the risk has been identified, it is necessary to determine its importance. An assessment
would therefore be necessary insofar as it is necessary to compare the estimated risk with given
criteria. This evaluation was carried out with the help of the QHSE manager of SAGRI.SA as well
as of certain employees to ensure that all possible types of risk are taken into account.
The objective of the risk assessment being to quantify the risk, it is therefore appropriate to rate
the risk taking into account:
The pareto diagram is a cause analysis tool that sorts out vital risks problems from a series of causes
by prioritizing them in a graphical manner in a descending order of the identified risks, according
to the law of pareto, 80% of the identified problems or risk was caused by 20% of elements present
in a particular family of risk Categorized in the 5M family of risks as shown below;
unit of production
in a particular family
34
Pareto chart procedure
3. Collect data, recording the category each time, or assemble data that already exist.
5. Determine the appropriate scale for the measurement you have calculated. The maximum
value will be the highest sub-total from step 5. Mark the scale on the left side of the chart.
6. Construct and label bars for each category. Place the tallest at the left, then next tallest to
its right, and so on. If there are many categories with small measurements, they can be grouped
into others.
7. Trace a line of 80% against 20% of the Pareto law so as to determine the principal cause
of the problems among the multiple problems found in the given workplace.
We carry out analysis method to identify and evaluates dangerous situations of risk or
hazards; which further helps us to verify short comings. Treat risks at the levels of acceptability
and also shows the best procedures on how to manage major risks. Is systematic and simple to
apply. Its principles can be represented as
Principle of APR
35
3. identify the causes and consequences of dangers and its
existing control measures
APR approach;
Initial risks residual risks
36
II.2.3 Risk Evaluation and Prioritization
The analysis and evaluation (quantified rating) of the risks makes it possible to define those
that are the most important. The classification criteria used appear in the proposed risk assessment
(severity x frequency = occupational risk index). It later allows, according to the results obtained,
to deduce the priority level of treatment of risky situations. At this stage, the analysis of the
causality of service accidents that have occurred and the studies carried out following the revelation
of occupational diseases are important indicators. Likewise, the study (statistical, i.e. anonymous)
absenteeism per work unit can be indicative of malfunctions
Table 5 : Shell risks analysis approach assessment of professional risks in the production unit.
LIKELIHOOD
Extremely Often likely unlikely Very unlikely
likely
Could happen Could happen Could happen
Could happen at some time but very but probably
SEVERITY
at any time rarely never will
10 08 06 04
Death or permanent
disability or extreme
damage to 100 80 60 40
equipment or
property 10
Long term illness or
serious injury or
major damage to 80 64 48 32
property or
equipment 08
37
Medical
treatment several 60 48 36 24
days off work or
minor damage to
equipment or
property 06
First Aid needed or
negligible property
damaged 04 40 32 24 16
Key
Frequency/gravity of an event likely to occur: 80-100
Frequency/gravity of an event unlike to occur: 48-79
Gravity
Gravity is the character of what is important, of what cannot be considered lightly, of what
can have unfortunate consequences. Gravity characterizes overall all the consequences among
different classes of importance. This classification is usually done by experts. An even number
of gravity classes should be defined in order to avoid the tendency to retain the middle position
of an odd classification. Revealing and distinctive terms should also be chosen to avoid
misinterpretation in the event of an audit or request for expert advice. Indeed, some simply
prefer to number gravity classes (level 0, level 1, level 2, and level 3) (Mazouni, 2008).
Frequency of occurrence
The frequency of occurrence of an event is the measure of the average number of occurrences
expected in a given time frame under known conditions. This frequency is estimated over a given
period of time (year, day, time, etc.)
Calculating risks score (initial risk)
38
At this stage, the identified risks/hazards are rated in frequency and their gravity of occurrence in
a criticity matrix shown above of using the SHELL RISK MATRIX. All this is calculated without
taking into account the initial preventive control measures put in place by SAGRI SA.
Denoted as Ri = P X G (General risks calculation) or Ri = (P X E) X G
Where; Ri =initial risks.
P= probability of occurrence
G= gravity
E= a given element.
Risk Evaluation scale
Evaluation Scale
Score Category Action Required
Isolate the hazard immediately. Take corrective measures on high
80-100 Critical
priority and eliminate the hazard as soon as possible.
Isolate the hazard as soon as practicable, Engineering control and
50-79 High administrative controls need to be taken. Regularly monitor the
cause(s) until rectification.
Must fix the cause(s) when time and resources permit.
30-49 Medium
Administrative control is to be taken.
Need to monitor and consider. Administrative control is to be taken
<29 Low
& use appropriate PPEs
The results of risks analysis that are been carried out will enable us to define priorities and
planning prevention and protection actions. The HSE plan will be based on the risks to be taken
into account:
• Time parameter: which precisely defines the actual mastery of duration of elaboration of
HSE plan.
• Actor’s parameter: which defines the person in-charge to carry out functions.
39
• Financial parameter: which will determine the amount that would be spend to elaborate
such programs
• Monitoring parameter: determines how the elaboration plan will be follow-up.
Table: 7 summarized methodological approach for our work.
40
Conclusion
Coming to the end of this chapter that has as goal to presents the different materials and
method used during the realization of our work. The first step was the study of initial diagnostic
(company’s state of existence) by the use of several tools such as desk study, observations.
Secondly was to carry out risk assessments where several tools were applied such as checklist
(questionnaire), brainstorming, 5WH, 5M diagram/ISHIKAWA for identification of professional
risks. Followed by risk analysis where identified professional risks are being analysed with respect
to causes and consequences and existing control measures put in place. Finally, a proposal plan of
intervention to be put in place with the help of an excel software.
41
CHAPTER III-RESULTS AND DISCUSSION
Introduction
In this chapter, we will present in detail the different results obtained after having applied in
our methodology. Each result is either followed by a discussion or interpretation or in a comment
form.
III.1 Identification of risks using checklist.
The risks identified in the unit of production by the help of a checklist (Questionnaire) in annex 2
where 15 questions of risks were being posed to 32 workers and 29 workers confirmed the
following risks.
➢ Poor working position of worker (standing, sitting or bending for a long duration of time.
➢ Limited space for execution of job task
➢ No designated area for the circulation of forklift and pedestrians.
➢ Wet soil and floor.
➢ Inadequate lightening
➢ Limited space for the execution of daily task.
➢ Poor circulation of fresh air due to absence of natural or mechanical ventilation systems.
➢ Sometimes the workshop experiencing overcrowding.
➢ Bad weather condition.
➢ Low power supply.
➢ Noise intensity greater than 85Db.
➢ Uneven and rough floor.
➢ No designated path for circulation forklifts and pedestrians.
➢ Negligence of mandatory PPE.
➢ Insufficient labour to carry out job tasks
➢ Lack of motivation to workers.
➢ Lack of appropriate training to workers.
➢ Negligence of safety instructions put in place
42
➢ workers are involving in lifting, pulling, pushing of loads containing sachets of tomato
with weight greater than 20kg for about 4hours only males are allowed to carry out de-
stuffing.
➢ Inappropriate rags and moppets to clean and dry floor.
➢ Presence of chemical products.
➢ Poor quality of plastic films.
➢ Unsuitable footwear
After using the 5M analysis, the following results of risks where obtained;
(M) Method:
➢ Poor working position of worker (standing, sitting or bending for a long period of time).
➢ The inappropriate procedure of work.
➢ Poor cleaning techniques.
➢ Lack of precaution during repair of machine.
(M) Machine:
(M) Material:
43
➢ Absence of reflective jackets
➢ Usage of rusty equipment.
➢ Poor quality of plastic films.
➢ Unsuitable footwear.
➢ Limited mandatory materials to be used daily e.g. face mask.
(M) Man-labour:
(M) Milieu:
➢ Vibration of machines rendering a noisy environment
➢ Limited space for execution of job task
➢ No designated area for the circulation of forklift and pedestrians.
➢ Wet soil and floor
➢ Inadequate lightening; the 5M can be represented below as;
➢ Limited space for the execution of daily task.
➢ Poor circulation of fresh air due to absence of natural or mechanical ventilation systems.
➢ Sometimes the workshop experiencing overcrowding.
➢ Bad weather condition.
➢ Low power supply.
➢ Noise intensity greater than 85Db.
➢ Uneven and rough floor.
➢ No designated path for circulation forklifts and pedestrians.
➢ Pathway not traced. The 5M/ISHIKAWA will be best represented in figure 1
44
identification of professional risk identified and categorized in the 5M/ISHIKAWA method.
➢ Some machines are out of ➢ The working position of ➢ Inappropriate rags and
date worker (standing, sitting or moppets to clean and dry
➢ Lack of proper maintenance bending for a long period of floor
➢ Presence of rusty time) ➢ Presence of chemical products
equipment ➢ The procedure of work ➢ Faulty wires and electric
➢ Machines run longer than ➢ Poor cleaning techniques outlet
planned ➢ Lack of precautions during ➢ Presence of defective pallets
➢ Lack of qualified repairer repair machines ➢ Usage of rusty equipment
➢ Poor quality of plastic films
Risks
➢ Negligence of PPI ➢ Vibration of machines rendering a noisy
➢ Lack of motivation environment
➢ Insufficient training ➢ Limited space for execution of job task
➢ Negligence of safety instructions put in ➢ No designated area for the circulation of
place forklift and pedestrians.
➢ Lack of training program ➢ Wet soil and floor
Man ➢ Miss handling of products Milieu ➢ Inadequate lightening
➢ Fatigue ➢ Hot environment
45
III.3 Prioritization of identified professional risks using Pareto diagram
From the risks identified and categorized using the 5M diagram in figure 9, the professional risk
identified must be prioritized to so as to sort out the major risks that are present in the unit of
production, all the professional risk identified using the diagrams which gave the following results
as follows; in the family of MILEU which recorded 14 professional risks, followed by risks found
in the family of MATERIAL with 8 identified risks, thirdly by risks found in the family of MAN-
LABOUR with 7 identified risks, while in the family of MACHINE with 6 identified risks and
lastly, in the family of METHOD with 4 identified risks as represented in table 8. In order to
prioritize these risks, they have to be calculated into frequencies (%) and in cumulative frequencies
(%).
TOTAL 28 100
Effective
FREQUENCY= x100
Total effectives
46
From the statistics of identified risks obtained from table 19, the risk found in the families of milieu
with 14 identified risks, secondly those in materials with an 8 identified risks and man-labour with
6 identified risks, 6 risks identified in the family of machine and lastly,4 risks identified in the
family of machine.as shown on figure 10.
80
47
III.4 Results obtained from Identification of risks using 5WH
• Problem 1.
After carrying out a brainstorming with a line operator which a member of his group had an
accident and was hospitalized for some days and the results from the 5WH questions from table.
Table 9 : Risk identified from problem 1 using 5WH in the line unit.
Who is affected?
WHEN? When does it actually take • During the night shift on the 07/05 2020
place? (from the company’s archives)
This first problem encountered in the line-sub unit were a worker finger was crushed by
movable machinery because the victims wanted to resolve a problem of the machine that’s not
guarded and without any supervision or help which made him hospitalize for some weeks. We can
48
conclude that risk due to running unguarded machineries should be well identified and take
immediate preventive measures. Below is a second case identified.
Problem 2.
After carrying out a brainstorming with in the de-stuffing workshop which a forklifts had an
accident where part of the wall of the entrance was damaged the results from the 5WH questions
from table.
Table 10 : Risk identified from problem 2 using 5WH in the line unit.
Who is affected?
WHEN? When does it actually take • During the day on the 07/06/2021
place?
WHY? Why did it really happen? • The forklift operator lost control as a
result of reversing the forklift at a high
speed.
From problem 2 case identified in the production with the help of the 5WH analysis we could
say that risks due to internal circulations of forklifts and the risk due to manual handling/working
with mobile machinery acts as big threats of risks in the production unit precisely the line sub-unit.
49
III.5 Professional Risks Assessment using the APR tool (table 12)
From the results obtain from observations, interviews and questionnaires from 21 personnel’s
in SAGRI SA, it could be noted that 19 of the 21 personnel’s confirms that following types of risks
professional risk found in the production unit. The risk found in table 12 based on;
50
Lastly, human resources which is the last mode of preventive measures shown in table 12
Table 11 : professional risks assessment using the APR method
due to expose to the due to storage pallets designated to -narrow path markup
1-9 workers
displacem following danger; containing cartons of Victims may fork lifters. designated -prioritizing safety over
ent and -Crushing; the DCT on the path sustain from -Provisions of for forklift speed.
internal backward movement meant for the bruises, safety circulations ORGANIZATIONAL
circulatio of forklift in contact movements for lifters. fracture, body pictogram on 8 6 48 -no specific - Ensure that overhead
ns of with pedestrians. -overcrowding at the trauma, prohibition of walkways for and side clearances in
forklifts. -Struck; falling load site due execution of properties climbing on pedestrians. aisles ensure that
of forklift on many tasks with damage. the forklift and doorways are adequate
workers. limited space that is manual pallet to permit safe operation
-Colliding of forklift not suitable for the jack. of the forklift and to
with pedestrians. execution of more accommodate the load
2) The emission of than one task. being moved.
poisonous gases. -unstable load - Ensure that the
containing TCT forklift’s travel path is
drums, which are not, kept clear and free of
attached the forklift. hazards
-insufficient lightening HUMAN RESOURCE
in the workplace. Pedestrians must wear a
piece of highly visible
clothing.
51
ORGANIZATIONAL
-Limit exposure times to
uncomfortable physical
environments
(arrangement of breaks).
risk due - Limited space for the -Impaired Provision of a Mechanical TECHNICAL
TRANSPORTTION PROCESS OF TCT INTO
fatigue RESOURCE
, transportation,
52
Workers are expose to The workshop TECHNICAL
noise due to noise induced is indicated by *employers must carry
continuous running of hearing pictograms. (> *workers out a toolbox talk for the
risk due line production Lost. to 80 dB) show no sensibilisation of
to internal machines such as the Occupational *Personal interest in workers on the
working mixing reservoir, stress. protections are putting on an importance of wearing
environm noise Cooking bunker and Tinnitus made available ear an ear protection during
ental the pasturisator with a [ringing in the to agents to 6 4 32 protection workers and the type of
Condition noise intensity greater ear]. enter or work provided to t hazards during the
1-9 workers
53
- Wet floor; as a result TECHNICAL
of the following; -Signaling dangers of
-as a result of dilution wet floor.
of TCT with water -Organization of the
that usually pours on -constant wet circulation of people.
1-9 workers
Risk due Struck, colliding May as results of Sustain injuries Provision of a De-stuffing ORGANIZATIONAL
to with the aspirator failure of remote from struck, or safety helmet. operators are Collectives
working pump against the control to respond colliding. aware of the * Install protections to
under wall. correctly during de- type risk that retain falling objects or
1 worker
6 4 24 PPE CONTROL.
*PPE (Helmet)
HUMAN RESOURCE
-train workers on risk
analysis
Collapsing objects
54
Infection of the skin as TECHNICAL
a result of; - Appropriate protective
-exposure of the skin -provision of -some equipment (gloves,
in contact with TCT Usually for safety gloves. workers are masks, etc.) in good
paste ;with pH allergic may -Awareness of not in condition and correctly
TRANSPORTATION PROCESS OF TCT
l risk in contact with mold and yeast count, contact with eating, gloves. • Procedures for
Potential infectious coliforms, TCT. drinking near 6 8 48 -workers are reporting malfunctions
biological agents. Staphylococcus *wrinkle of the workstations) exposed to • Hygiene rules.
aureus, Salmonella) hands and biological • Contaminant
for about 5hours fingers risk for screening.
-the prolonged 6hours of • Work organization
exposure of the hands work (limitation of exposed
with water which duration. personnel, reduction of
makes them exposure time).
vulnerable to micro- HUMAN RESOURCE
organisms. • Identification of
exposed agents.
TECHNICAL
risk due workers lifting De-stuffing workers Musculoskeleta Handling is -workers Collectives:
to manual heavy loads with are involve in lifting, l disorder; facilitated by handle load • Adapted mechanical
handling Hands and manual pulling, pushing of May result to the use of tools of more than aid
jack lift. loads containing muscle strain, i.e. pallet 50kg for • Layout of premises
sachets of tomato with body and the truck, etc.) distance of and workstations
weight greater than skin disorder/ 6 6 36 about ORGANIZATIONAL
20kg for about 4hours deformation in 1meter. Organize and reduce
only males are long term. handling
allowed to carry out • Reduce the weight of
depotage. loads
2-9 workers
55
Risk due -handling or working -women working with -sustain injury -provision of -workers -sensibilisation of
to manual with sharp objects scissors to remove example; a safety gloves show no workers on the need or
4-9 workers
handling (Scissors). tomato content in the wounds during the interest in importance of safety
and sachets for a period of execution 6 6 36 putting on gloves when handling
equipmen 6hours. Of job task. safety gloves sharp objects.
t.
Workers are - should be an increase
risk Prolonged working -workers are workers are Limited submitted to of employers so as to
related to posture at work. summited to submitted to workers for the 6hours of facilitate and minimize
physical prolonged standing strain and execution of working stress during work.
activities (de-stuffing operator) stress said tasks. 8 4 32 while -they should implement
1-9 workers
risk due
to internal -internal heating of -dizziness ORGANIZATIO
working workplace; which -headache Provision of a NAL
TRANSFORMATION TO DCT
(thermal high thermal primary packaging of concentrate fans. ventilation system physical
environm temperature TCT at a temperature -heat raches 8 4 32 is insufficient, environments
ent) greater than 80 (arrangement of
degrees. breaks).
TECHNICAL
Put in place
palliative
equipment (, air
conditioning, etc.)
56
TECHNICAL
-continuous running of - Noisy rooms -employers must
-noise the line machineries Noise induced are indicated - workers shows carry out a toolbox
such as mixing hearing lost. by pictograms. no interest in talk for the
risk due bunker, pasturisator Occupational (> to 80 dB) putting on an ear sensibilisation of
to internal with noise intensity stress. Tinnitus *Personal 8 8 64 protection workers on the
working greater than 85dB to a [ringing in the protections are provided to the importance of
environm duration exposure of ear]. made available them wearing an ear
6-9 workers
ORGANIZATIO
- vibrations - muscle, - no warning signs NAL
risk originating from neurological or of risk due to -Limit the periods
1 worker
57
TECHNICAL
*Signaling
dangers of wet
floor.
*Organization of
the circulation of
-Wet floor; as a - Bruising, Constant wet people.
6-9 workers
58
-the increase in -provision of
thermal temperature is working in a ORGANIZATIO
high thermal as close system -doors are always NAL
risk due temperature a result of the -Impaired and with open, not -Limit exposure
to internal following; sensory the help of a respecting the time to
PRIMARY PACKAGING OF DCT.
working -heat from hot paste of abilities(vision, mechanical close system uncomfortable
environm DCT with temperature hearing) and ventilation conception. physical
ental of about 890C physical system 6 4 24 -insufficient air environments
3-4 workers
59
-Noisy rooms TECHNICAL
-continuous running of are indicated -employers must
primary packaging -noise induced by pictograms. carry out a toolbox
machinery hearing (> to 80 dB) -Hearing talk for the
and the pasturisator Lost. *Personal protection is not sensibilisation of
PRIMARY PACKAGING.
risk due with a noise intensity Occupational protections are use correctly by workers on the
to internal greater than 85dB stress. made available workers. importance of
working -noise which is about Tinnitus to agents to wearing an ear
3-4 workers
environm 1meters from the [ringing in the enter or work protection during
ental refilling sub unit , in ear]. in these noisy 8 4 32 workers and the
Condition which workers are Difficulties in premises type of hazards
. exposed to high communicating during the
intensity of noise for exposition of high
6hours or working intensity of noise.
duration all this is as ORGANIZATIO
result of the opened NAL
doors. Isolate workspaces
from noise sources
(partitions, doors,
Windows...)
Limit exposure
times to
uncomfortable
physical
environments(arran
gement of breaks)
60
TECHNICAL
Collectives:
• Equipment
suitable for use
• Emergency cut-
off device
• Equipment
complying with
current standards
risks • proper machine
PRIMARY PACKAGING
61
LINE UNIT/ SECONDARY PACKAGING
ORGANIZATIO
NAL
-Handling is -insufficient • Adapted work
Musculoskeleta facilitated by amount of workers clothes
-risk -working with - the prolonged l disorder; the use of to carry out job • Organize and
related to scotching machine, standing by workers May result to tools. task. reduce handling
manual and manual while working for muscle strain, (, hand truck, • Reduce the
handling. Jack forklift. about 6hours of body and the pallet truck, 6 4 24 weight of loads
duration engaged in skin disorder/ etc.) • Procedures for
activities like deformation in *The agents handling heavy
scotching of cartons, long term. concerned loads with 2 people
filling sachets in benefit from • Organize
cartons and later on medical recovery times
palletizing for storage surveillance. HUMAN
in the magazine RESOURCE
• Training of
agents in the
gestures and
8-9 workers
postures to be
implemented
• Monitoring and
medical fitness
62
-risk - working in region - exposure of workers - Noise induced -*provision of -workers are TECHNICAL
related to of high noise to high noise hearing lost. hear protection exposed to noise *employers must
physical intensity originating Occupational from for 6hours of carry out a toolbox
activities. from the cooling stress. continuous duration. talk for the
tower machinery Tinnitus high intensity sensibilisation of
which emits noise [ringing in the of noise in the workers on the
greater than 85dB ear]. workplace importance of
Difficulties in *Noisy rooms wearing an ear
communicating are indicated protection during
by pictograms. workers and the
(> to 80 dB) 8 4 32 type of hazards
during the
exposition of high
intensity of noise
8-9 workers
PPE
*putting on ear
protection should
be obligatory.
Table 00 risk analysis and evaluation in the production unit (SAKWE 2021)
From the table above risks analysis done in the production unit done with the method APR (Preliminary Risk Analysis) the risk
with the highest risk score is noise with (64) caused by continuous running of the line machineries such as mixing bunker, pasturisator with noise
intensity greater than 85dB to a duration exposure of 6hours, which as a threat and most be taken into account as fast as possible. Follow by risk due
to the internal moving of forklifts with a risk score of (48) preventive measures should be implemented as fast as possible.
63
Interpretation of risk analysis table in the de-stuffing sub-unit
The pi-chart in figure14 statistics of professional risks identified in the de-stuffing sub unit
shows that risk due to internal displacements accounts in 14%, followed by risk as a result of
manual handling, biological risks, high temperature, slip, trip, fall, prolonged standing posture risks
with percentage of risk 11% and the least; machinery vibration and slip, trip fall with a percentage
of 11% and others 7%.
64
Interpretation of table in the line sub-unit
The pi-chart figure 14 statistics of risks identified in the LINE sub unit shows that risk due
to noise accounts in 27% so as risk as a result of high temperature, followed by risk as a result of
manual handling with percentage of risk 20% and the least; machinery vibration and slip, trip fall
with a percentage of 13%.
Noise
27%
Machinery
vibration
High thermal 13%
temperature Slip trip fall
27% 13%
Manual
handeling
20%
Figure 12 : Frequency of risk occurrence in percentage in line sub-unit (SAKWE LENYA 2021)
65
Interpretation of table professional risks in the primary & secondary sub-unit.
The pi-chart figure 15 statistics of risks identified in the the primary and secondary packaging
sub-unit, shows that risk due to noise accounts in 25%, followed by due to manual handling and
risks of cuts, burn, crushing, ergonomic results to 19% while, while risk as a result of high
temperature accounts in 18%.
Figure 13 : Frequency of risks occurrence in percentage in the primary and secondary packaging
sub-unit (SAKWE LENYA 2021)
66
III.6 Risk evaluation in the production unit
After carrying out risk analysis and judged by their criticity of the 3 sub-unit in the
production as it has that the risks found in the line sub-unit has the highest number of threats and
immediate preventive control measures should be implemented.
6
6
5
4
4
3
3
2
2
1 1 1
1
0 0
0
de-stuffing sub-unit line sub-unit primary and secondary
packaging sub-unit
From the graph below is could be seen that de-stuffing sub-unit came out with the highest
value of risk recording, followed by LINE unit and the least of them the primary and secondary
packaging unit
67
III.7 Proposed prevention plan
After having identifying, assessing and prioritizing risks in the production unit, we were able to come out with a prevention plan
of action with the help of the method 5WHs. The table 12 below shows a proposed HSE prevention plan for SAGRI S.A.
Unit Identified risks Proposed actions Person in charge Status of the action
Fall of even foot -Tidy equipment’s in the site, place Workers Partially done
materials on the appropriate
position
68
Explosion -Restrict smoking on the site HSE Agent Partially done
Exposure to noise -Put-on PPE; plug ears to reduce HSE Agent Not done
noise intensity
Insalubrity of the work site -Place trash cans in the offices HSE Agent Partial done
Alteration of the view - Install anti-reflector screen HSE Agent Not done
Risks due to internal Carryout preventive maintenance of Director of the mechanical Partially done
circulations of forklifts forklifts workshop
69
-Drive at normal speed
-Recycle drivers
Inhalation of dust Put on PPE when working HSE Agent Partially done
The proposed HSE prevention plan above was implemented so as to reduce the gravity and frequency of occurrence of provisional
risks present in the unit of production of SAGRI S.A.
Conclusion
From the above results which begins with risk identification by the use of brainstorming and questionnaires which were related to
the organization, 25 out of 32 employees confirmed that 53% of risk due to internal circulation of forklift,55% confirms the existence of
biological risk 51% confirms risk of slip, trip, fall 52%, risk due to inadequate lightening 53% noise risk 55%. To facilitate
understandings, weekly site visits were carried out for better observing the medium, detecting the risks related to each activity and the
means set up to reduce / eliminate them. The results categorized according to the Ishikawa diagram show that; investigations carried out
from the checklist and it gave the following risks problems; we identify 06 problems in (Machines & Milieu),07 problems (Man-labour,)
04 problems (method) 05(materials) In addition, a risk analysis and evaluation methodology was carried out by applying the preliminary
risk analysis method and risks with high gravity that acts as threats in the unit of production includes; risk of vibration, risk due to internal
circulation of forklift, risk due to inadequate lightening, risk of slip, trip, fall. To reduce/eliminate these risks, an action plan was
establishing in order to allow a better integration of QHSE aspects.
70
GENERAL CONCLUSION
Coming to an end of this work, which has been carried out as a partial fulfilment of a thesis
end of year studies viewing to obtain a master’s degree of engineering in Industrial Safety, Quality
and Environment. With an objective to conduct professional risks management within the unit of
production in SAGRI S.A.
An assessment of professional risks within the production unit of SAGRI S.A in order to
reduce or eliminate all possible risks and proposed control preventive measures. The first
methodology use is risks identification, consists of a documentary review on similar works of the
same theme. Thereafter, brainstorming and checklist which were related to the organization, 25 out
of 32 employees confirmed the existence of several risks found in the unit of production and this
risks were categorized by the different families by the help of ISHIKAWA diagram of which we
identified 14 problems in the family of Milieu,08 problems from material, 06 problems Man-
labour 05 from method. This risks were further prioritized by using the PARETO diagram which
we found that 80% of the problems or risks where caused by 20% of risks found in the family of
milieu. Furthermore, risk assessment was carried using the Preliminary Risk Analysis table
where 53% of risk due to internal circulation of forklift,55% confirms the existence of biological
risk 51% confirms risk of slip, trip, fall 52%, risk due to inadequate lightening 53% noise risk 55%.
To facilitate understandings, weekly site visits were carried out for better observing the medium,
detecting the risks related to each activity and the means set up to reduce / eliminate them. The
results categorized according to the Ishikawa diagram show that; investigations carried out from
the checklist and it gave the following risks problems; Inaddition, a risk analysis and evaluation
methodology was carried out by applying the preliminary risk analysis method and risks with high
gravity that acts as threats in the unit of production includes; risk of vibration, risk due to internal
circulation of forklift, risk due to inadequate lightening, risk of slip, trip, fall. To reduce/eliminate
these risks, an action plan was establishing in order to allow a better integration of QHSE aspects.
The application of the regulatory requirements in force, reinforce the capacities of the personnel
on risks related to quality, hygiene, safety and environment and instauration of synergy between
the personnel and the local populations on intervention strategies event of emergency which will
be a better strategy to integrate QHSE aspects a SAGRI S.A.
71
RECOMMENDATIONS
-SAGRI S.A should consider installation of abrasive floor mat or replacing worn flooring in order
to eliminate risk due to wet floor, tomato spills on the floor
-Provision of an injection –molded PVC footwear which allows a boot to be made with up to 3
different PVC compounds for upper (chemical resistance), the midsole (comfort) and the outsole
(abrasive resistance) to eliminate liquid penetration and provides maximum slip-resistance.
-SAGRI S.A should be certified with ISO 45001 version 2018 occupational safety management
system in under to better plan and manage and protection of worker’s safety at workplace.
72
BIBLIOGRAPHIC REFERENCES
AFSCA (2005). Auto-control, in your company too. Brochure, April 2005. D/2005/10413/6.
AFSCA (2007). Risk assessment as a basic process for a formal opinion of the Scientific
Committee (General Pragmatic Approach). DRAFT-Version 5: 19-3-07.
Barthelemy, B., & Courreges, (2004). RISKS MANAGEMENT: Global optimization (ed. 2nd
edition). Paris: Organisation Edition. CEI 300-3-9. (1995). Management of Security functioning.
CEI. Page 78-89
Bennet WL, Steed LL. An integrated approach to food safety. 1999; 32:37-42.
Bruce K. Lyon, and Bruce Folcroft. (2016) the fundamental of risk assessment page 49.
Bruno Schaffer’s (2009) Coleac001-pip-module-3-uk-pp(1) chapter 2.page 7, 51, 55 and 51
Dey, P.K. (2001). Decision support system for risk management: a case study, Journal of
Management Decision, 39(8): 634-649.
Fedotov, I.A.; Saux, M.; Rantanen. 1998. “Occupational health services”, in Encyclopedia of
occupational health and safety, 4th ed., Vol. I (Geneva, ILO),pp. 161–62.
Global plan of action on workers’ health: 2008–2017. Sixtieth World Health Assembly.WHA
60.26. Agenda item; 2007. p. 12–13.
John Wiley & Sons (2010) Risk Management standard (nationally adopted from ISO 31000) Risk
Assessment: A Practical Guide to Assessing Operational Risks, First Edition. Edited by Georgi
Popov
Nichan Margossian (2003). Généralité et définition. In : L’Usine Nouvelle (Ed) : Risques
professionnels Caractéristiques- Règlementation- Prévention.2ème édition. Dunod, Paris. P: 1- 31
ISO Guide 73:2009, Risk management — Vocabulary
73
ANNEX
Magasin
pièces de rechange Guéritte
Entrée
TCT
Chaudière
Mélangeur
Cuve
Salle de eau
CIP
Bac eau
stockage
chaude
dépotage interne
Boule de
concentration
Cuve et Trémie
tampon
Cloche à vide
MAGASIN Pasteurisateur
MAGASIN STOCKAGE MATIERES PREMIERES Armoire
de commande
Cooling
PRODUIT FINI tower
Ensacheuse
Convoyeur
Mosquée
Tunnel de
refroidissement
Surpress eu r
Dateuse
Lave main
Pédiluve
Echantillothèque
Bureau Méthodes
Laboratoire et Procédures
Toilettes Toilettes
femmes Toilettes
hommes Vestiaire femmes Vestiaire hommes
Magasin stockage
Sel & Scotch
vers l’administration
(mezzanine)
Entrée du personnel
Sortie du personnel
Passage cloutée pour la circulation du personnel
II
Annex 2 checklist
Checklist (questionnaire)
The results of the questionnaire below is relative to the Cameroon legal framework relative
to health & safety measures of workers at work of decree number 039/MTPS/IMT of November
1984 to check conformity relative to the health and safety to employees in SAGRI S.A, it is made
of 15 questions selected to question 32 workers in the company.
Table 00 checklist relative to HSE legal framework of Cameroon to SAGRI S.A(SAKWE 2021.)
III
Article 4.- The employer is required to make
1,3 available to workers and maintain
the premises, installations and
tools suitable for the work to be
carried out so as to provide
workers with
adequate protection against
industrial accidents and any
damage to their workers. health
Depending on the nature of the
work, the appropriate protective
equipment will consist of:
a) respiratory masks when the
nature of the industry or the work
to be performed does not allow 20 12 Provisions and
sufficient elimination of gases, follow-up of all
(62.5%) (37.5%)
vapors, dust or other noxious equipment to be
fumes; rightly used and
b) glasses or visors intended to maintained
protect the worker against any
solid, liquid or gaseous
projections liable to cause injuries;
c) glasses and other protective
measures against radiation of all
kinds harmful to the
eyesight;
d) protection against all dangerous
projections and against possible
falling objects;
e) gloves, gauntlets, muffs,
headgear, hoods and special
IV
footwear, for the appropriate
protection of workers against
hazardous projections, fumes and
contact;
f) special clothing and / or
equipment intended for the
protection of
workers in the performance of
dangerous or simply dirty tasks;
g) any other apparatus, devices or
accessories suitable for protecting
the worker against the risks
associated
with his activity
V
requirements of the internal
regulations, in particular with
regard to concerning:
a) the execution of the work;
b) the use and maintenance in good
condition of the equipment,
machinery, machines, installations
placed at its
disposal;
c) the use and maintenance of the
personal protective equipment
provided to him.
VI
Article 18.- The work rooms are kept in a 100 / Daily check-up
constant state of cleanliness procedure.
(100%)
VII
conditions resulting from their (62.5%) (37.5%) from their home in
working hours or the distance from relation to their
their home in relation to their places of work.
places of work, The employer is
required to provide them with
canteens in the form of special
rooms completely separate from
the work rooms.
refences
00
Personnel: 32
HSE CHECKLISTS TO CHECK
Date: 09/05/2021
Unit: production unit
Possible risks that may occur with respect to the ILO YES NO N/A TOTAL SCORE
VIII
Are Barriers, warning signs, designated walkways or X
other safeguards provided where pedestrians may be
exposed to the risk of collision with a forklift?
Are forklifts and pedestrians moving on the same path? X
IX
Are glass surfaces of workplace equipped with blackout X
system?
Is the level of lightening sufficient in interior circulation X
spaces (corridors, halls, stair cases) and exterior
(70flux)? 45% YES
Are lightening controls easily accessible and located in X 55% NO
the dark?
Are regular maintenance of light fixtures, emergency X
lightening, blinds as well as replacement of detective or
worn lamps carried out regularly/
NOISE
MANUAL HANDLING
X
Are awareness of basic hygiene (washing hands, not X
eating or drinking at workplace) is dispensed to workers
,instructions are posted in the toilets, sanitary facilities
are cleaned and disinfected regularly?
Are potential infectious diseases and mode of X
contamination identified?
Are instructions and operating procedures aimed at X
preventing the risk of contamination drawn up?
Are various means of protection against biological X
agents indicated or protocols are applicable (gloves,
masks, coveralls, disinfectants etc.)?
Are waste regularly collected and removed? X
XI
ANNEX 4
INCIDENT/ACCIDENT/NEAR MISS REPORT
Manuel
§8
Référence :
INCIDENT/ACCIDENT/NEAR MISS Date MAJ :
REPORT Version
Page
II
01 victim sustaining -massaging - Good health
Accident due to external observed in some
23/12/2020 -amoxicillin. AT THE ROAD
circulation on road site. days.
SITE.