TUBS

Nickel Laterite Project


BUSSINES OVERVIEW

• Green Field Nickel Laterite Project Located in Morowali Area,


Central Sulawesi, Indonesia
• Previously ANTAM Concessions
PROJECT LOCATION

• TUBS Project Located in Petasia


Timur Area, Morowali, Central
Sulawesi
• Project area is about 1.450 Ha
INFRASTRUCTURE INDICATIVE

PT.TUBS MINERAL 1.450 Ha

• Distance from IUP to indicative JETTY

port site is about 6.7 Km


GEOLOGY REGIONAL

• Based on Indonesian Geological


Map, AUC Project Located in
Ultramafic Formation (Red) and
Larona Formation in the northern
part.
• The Ultramafic Formation well
known as Nickel Lateritic bearing.
PROJECT VS OTHER MINING LICENSE

• Based on Indonesian Mining


License Database, AUC Project
overlap with PT. Sinar Morowali
Rehoboth License.
• About 277 Ha Overlap with PT
Sinar Morowali Rehoboth
PROJECT VS FOREST

• TUBS Project Not Overlap with


protection forest
• Northern part of IUP located in
production forest
• Southern part of IUP located in
free forest area
• Most of the exploration activity
done in southern part of IUP
EXPLORATION ACTIVITIES

• 2001 - Ground Geophysical


survey (Resistivity ) to
estimate depth of bedrock
done by ANTAM
• 2012 – 23 Bore Holes, 3
Channel Sampling and 1 Test
pit was undertake in
southern part of IUP
• 2012 – 392 sample has
analysed in Minertech
Indonesia Lab Kendari.
CORE PICTURE

203

204

205

206

207

Core Picture at Hole DHMT07


INSITU TONNAGES STATEMENT

Based On Tubs Exploration report that compiled by TUBS Geologist Mr.


Gunawan, it is stated :
• LATERITE ZONE : Inferred resource in area 300 Ha in southern part area,
with Ni Grade ≥ 1.75% Is about 5.400.000 WMT
• LIMONITE ZONE : Inferred resource in area 300 Ha in southern part area,
with Ni Grade ≥ 1.20% - 1.75% Is about 17.280.000 WMT
CHALLENGE and OPPORTUNITIES

Challenge
• Clean and Clear is still on application stages
• Northern part overlap with other IUP

Opportunities
• Relatively High Grade Nickel Deposit
• Short distance to port site (relatively low operational cost)
• Most exploration done in south part area in APL Area and not
overlap with other IUP
• IUP owner is family of Morowali Bupati
BUSSINES SCHEME OPPORTUNITIES

Acquisition
• Opportunities Acquire 75% of Project Shares
• Project Value for 75% Shares is IDR 30 Billion
• With IDR 200 Million (Negotiable) the investor allowed to
undertake full due diligent.
• With IDR 2.5 Billion the investor allowed to mine the project,
Remaining payment can be payed based on Nickel
Shipping/Product Selling
APPENDIX
INFRASTRUCTURE MAP
BOREHOLE DISTIBUTION MAP
BOREHOLE COORDINATES
TESTPIT PICTURE AT TPH01
DRILLING ACTIVITIES

DHMT04

RHA-12
ASSAY RESULT EXAMPLE
ASSAY RESULT EXAMPLE
ASSAY RESULT EXAMPLE