Professional Documents
Culture Documents
HSE RISK & IMPACT ASSESSMENT FORM RM TEAM (Name and Designation) DOCUMENT REFERENCE NO.: RA/TTC-00
BU/DEPARTMENT: Team Tec Construction Pte Ltd RM LEADER: Maha REVISION NO.: 0
PROCESS/ACTIVITY LOCATION: Civil work for Fire water line repair works @ ARLANXEO RA MEMBER 2: Dinesh NAME: Malar
Likelihood
Likelihood
Risk and
Risk and
Target Date
Severity
Severity
Impact
Impact
Level
Level
Implemetation of
No. Work activity Hazard Possible Injury / Ill Health Existing Risk Controls Additional controls Remarks
on person Implementa
tion
Engineering control : NA
pinch point hand/ finger injury 3 1 3
site survey & Administrative control:
2 1. Apply valid PTW prior start work. Site Supervisor Immediate
Measurments
2. check and clear any obstruction in the access 3 1 3
noise pollution noise induced deficiency area.
PPE :
1. Use cut resistant level 3 gloves 3 1 3
2. All personal to wear basic PPE
personal injury/ minor
Slip,trip & fall
fracture
Page 1 of 9
TEAM TEC CONSTRUCTION PTE LTD
HSE RISK & IMPACT ASSESSMENT FORM RM TEAM (Name and Designation) DOCUMENT REFERENCE NO.: RA/TTC-00
BU/DEPARTMENT: Team Tec Construction Pte Ltd RM LEADER: Maha REVISION NO.: 0
PROCESS/ACTIVITY LOCATION: Civil work for Fire water line repair works @ ARLANXEO RA MEMBER 2: Dinesh NAME: Malar
Likelihood
Likelihood
Risk and
Risk and
Target Date
Severity
Severity
Impact
Impact
Level
Level
Implemetation of
No. Work activity Hazard Possible Injury / Ill Health Existing Risk Controls Additional controls Remarks
on person Implementa
tion
personal injury/ minor
Slip,trip & fall Elimination: Not Possible
fracture
Substitution : Not Possible
3 1 3
Engineering control : Not Possible
Administrative control:
1. Apply valid PTW prior start work
3 Cable Detection Works noise pollution noise induced deficiency Site Supervisor Immediate
2. check and clear any
obstruction in the access area
3. Underground utility services detection to be conducted by
competent person. 3 1 3
4. Licensed cable detection worker
PPE :
1. ALL personal to wear basic PPE
2. use cut resistant level 3 gloves
Administrative
5..Do notcontrol : access with any material.
block the
6. All the tools should tie
1. All the area should be in good condition.
with
2. lanyard
proper communication with co-workers.
3. Budy system in place all manual
Ergonomics Sprains handling
4. Before lift the load, check the wight of the load and clear the
path of any obstructions. 4 1 4
5. worker should know
about the Proper lifting method
PPE :
Personnel injury, Leg injure
Hit by vehicle
& Back pain/property damage 1. use cut resistant level 3 gloves.
2. Ensure the proper PPE to be worn when carry out work.
Page 2 of 9
TEAM TEC CONSTRUCTION PTE LTD
HSE RISK & IMPACT ASSESSMENT FORM RM TEAM (Name and Designation) DOCUMENT REFERENCE NO.: RA/TTC-00
BU/DEPARTMENT: Team Tec Construction Pte Ltd RM LEADER: Maha REVISION NO.: 0
PROCESS/ACTIVITY LOCATION: Civil work for Fire water line repair works @ ARLANXEO RA MEMBER 2: Dinesh NAME: Malar
Likelihood
Likelihood
Risk and
Risk and
Target Date
Severity
Severity
Impact
Impact
Level
Level
Implemetation of
No. Work activity Hazard Possible Injury / Ill Health Existing Risk Controls Additional controls Remarks
on person Implementa
tion
flying objects / particles 1. All the rotating parts should be covered with guard
cuts / burns / multiple injuries 2. double hearing protection.
during cutting of rebar
Existing rebar cutting Administrative control :
6 by using electrical 1. All the electrical tools should be inspected by licensed LEW Site Supervisor Immediate
cutter worker.
Page 3 of 9
TEAM TEC CONSTRUCTION PTE LTD
HSE RISK & IMPACT ASSESSMENT FORM RM TEAM (Name and Designation) DOCUMENT REFERENCE NO.: RA/TTC-00
BU/DEPARTMENT: Team Tec Construction Pte Ltd RM LEADER: Maha REVISION NO.: 0
PROCESS/ACTIVITY LOCATION: Civil work for Fire water line repair works @ ARLANXEO RA MEMBER 2: Dinesh NAME: Malar
Likelihood
Likelihood
Risk and
Risk and
Target Date
Severity
Severity
Impact
Impact
Level
Level
Implemetation of
No. Work activity Hazard Possible Injury / Ill Health Existing Risk Controls Additional controls Remarks
on person Implementa
tion
Page 4 of 9
TEAM TEC CONSTRUCTION PTE LTD
HSE RISK & IMPACT ASSESSMENT FORM RM TEAM (Name and Designation) DOCUMENT REFERENCE NO.: RA/TTC-00
BU/DEPARTMENT: Team Tec Construction Pte Ltd RM LEADER: Maha REVISION NO.: 0
PROCESS/ACTIVITY LOCATION: Civil work for Fire water line repair works @ ARLANXEO RA MEMBER 2: Dinesh NAME: Malar
Likelihood
Likelihood
Risk and
Risk and
Target Date
Severity
Severity
Impact
Impact
Level
Level
Implemetation of
No. Work activity Hazard Possible Injury / Ill Health Existing Risk Controls Additional controls Remarks
on person Implementa
tion
4 1 4
1.Workers are rotated for the repetitive actions of work. Site Supervisor Immediate
2. Workers are advised to have a
comfortable body posture while working.
work activities in
8 Presence of toxic gases amputation
confined space Administrative control :
1.Confined space entry permit is in place.
2.Manhole watcher to monitor with 4-in-1 gas monitor. 4 1 4
3.Manhole watcher to check
O2 level inside sump and record every hourly. Maintains personal
log - personal entering /leaving trench.
4.Evacuate workers if conditions are
Flammable gases or occupational cancer, acute
unsafe.
PPE : eg. O2 is less than 19.5%. or more than 23.5%.
vapors poisoining
1.Finger to be kept away from the plywood joints. Site Supervisor Immediate
2.To keep safe distance from
Install & remove Trip&Fall Bodily injuiry exposed formwork.
9 3.No more than 20kg per person to be lifited.
shoring work
4.wooden blocks to be placed on the ground before
placing material.
3 1 3
5.Do not block the
access with any material.
Administrative control : 6. GI
pipes will fixed for shoring by using Monkey ramp
1.Material to be stroed in proper storage area.
Workers hit by 2.To
Bodily injuiry
formwork supports remove unwanted materials from site.
Page 5 of 9
TEAM TEC CONSTRUCTION PTE LTD
HSE RISK & IMPACT ASSESSMENT FORM RM TEAM (Name and Designation) DOCUMENT REFERENCE NO.: RA/TTC-00
BU/DEPARTMENT: Team Tec Construction Pte Ltd RM LEADER: Maha REVISION NO.: 0
PROCESS/ACTIVITY LOCATION: Civil work for Fire water line repair works @ ARLANXEO RA MEMBER 2: Dinesh NAME: Malar
Likelihood
Likelihood
Risk and
Risk and
Target Date
Severity
Severity
Impact
Impact
Level
Level
Implemetation of
No. Work activity Hazard Possible Injury / Ill Health 1.Material to be stroed in proper
Existing storage
Risk area.
Controls Additional controls Remarks
Workers hit by on person Implementa
Bodily injuiry 2.To
formwork supports tion
remove unwanted materials from site.
Worker being splashed Skin contact with cement/ Elimination: Not Possible
by cement Dermatitis
Substitution : Not Possible
Engineering control : Site Supervisor Immediate
11 Casting of concrete
Worker being hit by Bodily injury / Damage to Administrative control :
concrete truck property
1.Provide banksman to guide the concrete the truck
2. Banksman should ware the
PPE :
reflective vest to know the driver clearly for proper
communication
1. Use Rubber gloves / Rubber boots while concreting
2.Use faceshield during concrete works. 3 1 3
3. use cut resistant
level 3 gloves, apron.
workers may hit by Elimination: Not Possible
plate compactor / Bodily injury Substitution : Not Possible
Engineering control :
Jumping rammer
1.Provide barricade with warning signs to alert others.
2. Ensure that workers maintain a safe
distance. 3.Dust suppression control by Site Supervisor Immediate
continuous Spray water.
Compaction using 3 1 3
plate Administrative control :
12
compactor/jumping
rammer Noise hazard Loss of hearing 1. Operator must be trained person.Daily Toolbox meeting/ Pre -
Task Briefing
2.To ensure compliance to
the inspection regime Page 6 of 9
3.Pre-check the machine before use.
4. Competent person to perform the repair work for the
equipment
TEAM TEC CONSTRUCTION PTE LTD
HSE RISK & IMPACT ASSESSMENT FORM RM TEAM (Name and Designation) DOCUMENT REFERENCE NO.: RA/TTC-00
BU/DEPARTMENT: Team Tec Construction Pte Ltd RM LEADER: Maha REVISION NO.: 0
PROCESS/ACTIVITY LOCATION: Civil work for Fire water line repair works @ ARLANXEO RA MEMBER 2: Dinesh NAME: Malar
Likelihood
Likelihood
12
Risk and
Risk and
Target Date
Severity
Severity
compactor/jumping
Impact
Impact
Level
Level
Implemetation of
No. rammer
Work activity Hazard
Noise hazard Possible
Loss Injury / Ill Health 1. Operator must be Existing
of hearing trained person.Daily Toolbox meeting/ Pre -
Risk Controls Additional controls Remarks
Task Briefing on person Implementa
2.To ensure compliance to tion
the inspection regime
3.Pre-check the machine before use.
4. Competent person to perform the repair work for the
equipment
Page 7 of 9
TEAM TEC CONSTRUCTION PTE LTD
HSE RISK & IMPACT ASSESSMENT FORM RM TEAM (Name and Designation) DOCUMENT REFERENCE NO.: RA/TTC-00
BU/DEPARTMENT: Team Tec Construction Pte Ltd RM LEADER: Maha REVISION NO.: 0
PROCESS/ACTIVITY LOCATION: Civil work for Fire water line repair works @ ARLANXEO RA MEMBER 2: Dinesh NAME: Malar
Likelihood
Likelihood
Noise hazard Loss of hearing
Risk and
Risk and
Target Date
Severity
Severity
Impact
Impact
Level
Level
Implemetation of
No. Work activity Hazard Possible Injury / Ill Health Existing Risk Controls Additional controls Remarks
on person Implementa
tion
PPE :
1. Workers wearing double hearing protection while using plate
compactor / roller for compaction. 4 1 4
3 1 3
Site Supervisor Immediate
4 1 4
Engineering control :
Page 8 of 9
TEAM TEC CONSTRUCTION PTE LTD
HSE RISK & IMPACT ASSESSMENT FORM RM TEAM (Name and Designation) DOCUMENT REFERENCE NO.: RA/TTC-00
BU/DEPARTMENT: Team Tec Construction Pte Ltd RM LEADER: Maha REVISION NO.: 0
PROCESS/ACTIVITY LOCATION: Civil work for Fire water line repair works @ ARLANXEO RA MEMBER 2: Dinesh NAME: Malar
Likelihood
Likelihood
Risk and
Risk and
Target Date
Severity
Severity
Impact
Impact
Level
Level
Implemetation of
No. Work activity Hazard Possible Injury / Ill Health Existing Risk Controls Additional controls Remarks
on person Implementa
tion
Page 9 of 9