PRODUCTION PLANNING SOP Sales Operation Planning
DM Demand Management
Flow
LTP
Long Term Planning
CP Capacity Planning
SAGAR ADAVADKAR
PE Production Execution
Sagar Adavadkar
MC76 Aggregation Consistent Planning Planning SOP
MC7F
Method
MC76 Disaggregation
Sales Planning SPRO
Level by Level Planning
Planning Table MC87, MC77
PIR
Next
DM
MC8T Mass Processing
LTP
SAGAR ADAVADKAR
MRP
PO
CP
PE
SOP
MRP 4.1 Individual/ Coll Flag.
MRP 3.1 Planning Material
MRP 3.1 Planning Plant Strategy 40 With Assembly DM
Strategy 20
Strategy 52 Without Assembly MTO
PIR
Consumption
MRP 3.2 Reorder point planning MRP 3.2 Mode
Planning SPRO
MS31, OS31 Planning Scenario
Evaluation MC87, MC77
MS21 Capacity Levelling
Transfer SPRO
MD62 Interactive Planning
Customer SPRO
Requirement
MS04 Requirement/ Stock List Dependent
SPRO
MS05 MRP List Requirement
PO
MS64 Transfer CP
MD43 Copy from Planned Orders PE
MRP 1.2 Reorder Point Planning
SOP
MRP 1.2 Forecast Based Planning
DM
MRP 1.2 Period Pattern Consumption
LTP
MRP 1.2 Time Phased Material Planning MRP 1.2 MRP Type
Net Requirement
MRP Procedure MC87, MC77
Calculation
MRP area
Procurement Quantity SPRO
OMD0 MRP Controller Calculation
Planning Calendar Scheduling SPRO
CP
PE
Good Receipt SOP
MRP 2.2
processing Time
DM
Scheduling LTP
MRP 2.2
Margin Key Forward Scheduling
InHouse Backward Scheduling
MRP 2.2
Production Time MRP
MRP 2.2 Quantity Independent
WS 4.3 Quantity Dependent
Check Planning File SPRO
WS InHouse Production
Net Requirement
WS Setup Time Scheduling InHouse Calculation
MC87, MC77
Procurement
WS Interoperation Time Procurement Quantity SPRO
WS Base Quantity Calculation
Scheduling SPRO
Determine Procurement
SPRO
Scheduling External Proposal
Planned Procurement
MRP 2.2 Analysis MC35
Delivery Time
Planned Order MD12
MRP 1.3 Type 1 Planning Time Fence
MRP 1.3 Type 2 Next
PO
MRP 1.3 Type 3
MRP 1.3 Type 3 SAGAR ADAVADKAR
CP
PE
SOP
DM
LTP
Scheduling SPRO
MRP
PE
SOP
DM
LTP
MRP
PO
Interactive Production
SPRO
Order Creation
CO01 With Material Reference Scheduling MC35
CO07 Without Reference
Reduction OPJS
Next
CP
PE
SOP
Safety Time DM
Float before Production LTP
WC Operation Duration
PO
SCAL Factory Calendar
Finite Scheduling
WC Working time
Order Type OPJH
WC Capacity Utilisation
Master Data Selection MC87, MC77
OPJU Scheduling Type
OPU3 Scheduling Profile Status and Trigger Point SPRO
C
OP67 Control Key Conversion SPRO
PE
SOP
DM
LTP
MB1A KANBAN
MRP
PO
MB1A Staging CP
OX09 Storage Location
Confirmation CO11N
WS view Tolerances
Completion COHV
Finish
SOP
DM
LTP
MRP
PO
CP
PE
SAGAR ADAVADKAR
Finish
Maintai
n Plant
Parame
ters
OPPQ
Number Check Reporting MRP Special Floats Conversion Dependen BOM/ BOM explosion Parameters External Rescheduling Planning Available Direct Error Item Start in past Performan
Ranges rule: Controllers Procureme t Routing for DS procurement horizon stocks Procurement Handling numbers ce
Backorder nt requireme Selection
s nt
availability
Planned Run time MRP Plant Plant Planned Plant Plant Plant Plant Plant Rescheduling Plant Plant Plant Plant Plant Aggregati
Orders statistics controller order to horizon on of MRP
Production list
Order
Reservations/ Grouping Missing Name Name Planned Name Name Explosion date Order type Purchasing Name Name Direct Plant name Name BOM
Dependent periods parts MRP order to process time procurement/ buffering
requirements controllers Purchase production
requisition
Purchase Receipt days Special Scheduling Rule for BOM Exclusion bulk Production Substitute Firmed elements Planning Stock in Message Item PR Start in Part
requisitions supply procuremen margin key available selection ID material scheduling purchasing Horizon transfer indicator checkbox
t type check tickmark group tickmark tickmark
OPPQ
MRP lists Opening Routing Sales Order/ LTP tickmark Firmed planned Blocked Item
period selection ID WBS BOM orders tickmark Stock number of
active tickmark tickmark stock
transfer
reservation
Simulative Float before BOM explosion Determining Production order Restricted Account
dependent production in number for the planned tickmark use stock assignment
requirements day MTO delivery time tickmark unknown:
production direct
procurement
BOM explosion
number/order
start date
Tolerance value
forward
Tolerance value
for displacement
MRP 1
Material
Plant
Base unit of measure MRP type Lot size MRP area exists tickmark
Purchasing group Reorder point Minimum lot size MRP area button
SAGAR ADAVADKAR
Storage costs indicator
Takt time
Rounding value
MRP 2
Material
Plant
MRP 2
Batch entry
Material
Plant
Forecast requirements Planning Availability check Plant specific configuration DTO relevant
Period Indicator Strategy group Availability check Configurable material Stocking policy
Splitting Indicator Forward consumption period Total repl lead time days Planning variant tickmark
Mixed MRP
SAGAR ADAVADKAR
Planning plant
Material
Plant
BOM explosion/ dependent Discontinued parts Repetitive manufacturing/ Average plant stock button
requirement assembly/deployment strategy
Selection method Discontinued indicator Repetitive manufacturing tickmark Material memo button
Individual/coll Eff out Fair share rule tickmark Material memo exits
Requirement group
SAGARMRP
ADAVADKAR
4
Deployment horizon tickmark
Material
Plant
General Data Inspection stock tickmark Tolerance data InHouse production time in days
Base unit of measure Batch Management tickmark Underdelivery tolerance % Lot size dependent
Material grouping
SAGAR ADAVADKAR
Overall profile
Service level
Valid from
OPPR
Maintain MRP
group
Assign Consumption Rescheduling Planning Planning Determine Convert Program Planning External Availability
strategies mode/ Horizon Horizon time fence Production planned order Planning Run Procurement Check
button Adjustment Storage types Independent
Horizon location requirements
select split - Period
Split
Plant Plant Plant Plant Plant Plant Plant Plant Plant Plant Plant
MRP group MRP group MRP group Plant Name Name MRP group MRP group MRP group MRP group Name MRP group
Planning Consumption Rescheduling MRP group MRP group Name Production Name Maximum MRP group Checking rule
strategy mode horizon order MRP
group Interval
Consumption Planning Planning Production Process order Period Split Safety Scheduling: Info/ Activate full
period: horizon OPPR
time fence storage Stock Agrmt checkbox confirmation
Backward location logic
selection
Start in Past
Requiremen
t grouping
indicator
ME52N HEADER(1)
ME52N
Purchase
requisition
number
HEADER
Item Category Item of Requisition Material Short Text Texts Exist Acct Assignment Quantity Requested Unit of Measure Delivery Date Plant Fixed Vendor Req. Tracking Purchase Currency
Cat. Number Order
ME52N HEADER(2)
Valuation Price Total Value Goods Receipt Status Requisitioner Purchasing Info Rec. Material Group Desired Vendor Reservation Ref. Purchase Req. Invoice Receipt
ME52N
ME52N ITEM
ITEM
Material Data Quantities/ Dates Valuation Source of supply Status Contact Person Texts Delivery
Address
Material Quantity Valuation price Agreement Processing Created by Item text Name
Status
Batch Quantity Ordered PC Fixed vendor Block Indicator Created Indicator Item note Address
Material Open quantity Promotion INfo record Order Quantity Requisitioner Delivery text Postal code
Group of Purchase
requisition
Short Text Request Date Invoice receipt Puchasing organisation Purchasing group Country
Planned Delivery time Total Value Supplier plant Fax number Vendor
Fixed ID tickmark
OMPO
ReqC Description Planning Indicator Comsumption Indicator Configuration allowed Configuration Reqs Reduction Regs Cat
consumption Indicator
OMPO
100 Make-to-stock prod. Net requirements No consumption with Configuration is Consumption of No reduction of ind. Planned independent
planning customer requirements mandatory selected reqmts (only in requirements
characteristics withdrwl for sales ord)
planning
101 Plnng with assembly Gross requirements Consume planning Configuration is Consumption of BOM Although no allocation Customer independent
planning with assembly allowed characteristics takes place, ind. requirements
planning reqmts are reduced
102 Gross reqmts plnning Single-item planning Consume planning w/o Configuration is not No reduction of ind.
SAGAR ADAVADKAR
assembly allowed reqmts (safety
requirements)
OVZG
OVZG
Allocation indicator Automatic planning Costing method W/o val strat
Reorganizing independent
requirement
Plant
Material
Requirements type
Version
Key date
Create list
OMPO
100 Make-to-stock prod. Net requirements No consumption with Configuration is Consumption of selected No reduction of ind. Planned independent
planning customer requirements mandatory characteristics planning reqmts (only in withdrwl requirements
for sales ord)
OMPO
101 Plnng with assembly Gross requirements Consume planning with Configuration is allowed Consumption of BOM Although no allocation Customer independent
planning assembly characteristics planning takes place, ind. reqmts requirements
are reduced
102 Gross reqmts plnning Single-item planning Consume planning w/o Configuration is not No reduction of ind.
assembly allowed reqmts (safety
requirements)
SAGAR ADAVADKAR
CS01
Material Material
Plant Plant
BOM Item
CS01 BOM
Technical Type Component
Quantity
SAGAR ADAVADKAR
BOM Status
SAGAR ADAVADKAR
SAGAR ADAVADKAR