You are on page 1of 7

13 MCQ NCA

test 1 1A
purchase price 250000 1/1/x5
stamp duty 5000
legal fees 10000 31/3/x7
site prep 18000
material 75000
labour 141000 31/12/x7
architect 20000
2B
cost of asset 519000 land
material
test 3 labour
10 years ago land 6000000 architect
building 24000000 surveyor
property 30000000 site OH
depn charge 600000
testing alarm
now land 15000000
building 45000000
property 60000000 3A
depn charge 1500000 capitalize rate
capital amount
dr acc depn 900000
cr depn exp 900000 4D
1/1/x0
dr rs 900000
cr re 900000 30/6/x8

test 4 1/1/x4 cost 750000


depn 75000
31/12/x4 ca 675000 31/12/x8
revalued at 810000
rs 135000
depn charge 90000 5?
31/12/x4 acc dep 180000
ca 630000
proceeds 900000
gain on dispo 270000 6C
7D
dr rs 135000
cr re 135000 8C
capital rate
test 6 borrowing cost (10m) 750000 capital amount
investment income 30000
capitalísed amount 720000 9B
1/7/x7
test 7 cost of property 40000000
capitalised amount 3000000 1/1/x8
total 43000000

test 9 1/1/x1 12000000 10C


1/7/x1 14000000
31/12/x1 dr ip 2000000 14 PLETHORA
cr pl 2000000 a) Building A
PPE-cost
dr ip 14000000 Acc Depn
cr ppe 14000000 CA
Revalued at
dr depn exp 500000
cr acc depn 500000 Dr PPE-cost
Dr Acc depn
test 10 cost of construction 10000000 Cr OCI
capitalised loan interest 510000
dismantling cost 1580363 0.52678753
total cost of asset 12090363
15 DEARING
test 11 1D Cost of machine
2A RV
3-91680 x 93920 depn/machine hour
4 C,E
5A 1/10/x7
6-810000
7-1mil x 0.5mil
8B
9A
10C depn
11. 1->2 nca-cost
2->3 acc depn
3->1 ca
4->1

16 FLIGHTLINE
cost
acc depn (31/9/x8)
ca (31/9/x8)
ca (1/4/x8)

cost (post-accident)
repair expense

sopl
depn
repair expense
loss on disposal

sofp
carrying amount
chap 3
test 3
cost 30000
depn/year 2500 1C
2,25 years 2A,D
depn/year 3282.051282 2462 3A xB
625 4B xD
total depn 3087 5D
6-215000
7A,C
1200 8 1
2400 2
3000 2
25 2
15
300

10
6950

0.10230769
545641.026

cost 900000
depn charge 18000
ca 747000
revalued at 950000
RS 203000

revalued at 1200000
pl surplus 250000

borrow intere 160000


investment i 20000
capitalised 140000
0.08823529
4.41176471

depn/year 48000

ca 476000
depn=machin 37250

Building B
600000 Dr IP 190000
114000 Cr PL 190000
486000
800000

200000
114000
314000

920000
20000
150

ca 670000
remaining hr 4500
depn/hr 140

1/10/x5->x6 1/10/x6->x7 1/10/x7->x8


180000 270000 119000
920000 920000 1120000
-180000 -450000 -569000
740000 470000 551000
exterior interior engine A engine B engine C
120000 25000 9000 9000
81000 17500 3000 3000
39000 7500 6000 6000
42000 10000 6300 6300

t-accident) 4500 -6000 10800


2000 3000

exterior interior engine A engine B engine C


6000 6500 300 700 300 13800
2000 3000
6000

exterior interior engine A engine B engine C


36000 8000 0 5600 10500
17
1D
2C
3B
4A

18 EMERALD

X4 DR intangible asset 270

You might also like