You are on page 1of 83

[14.

38, 25/7/2022] JMI Hamka: DAILY ACTIVITY REPORT_

WEST KINTAB COAL PROJECT

          PT.JARUM MAHAKARYA INDONESIA

           DAY SHIFT

⏰  PUKUL 18:00 WITA  ⏰

     Selasa, 19.Juni-2022

          CREW JMI

👷 Erpan (OPT PUMP)

👷 Sugianur (OPT PUMP)

👷 Maulani (OPT PUMP)

👷 Renaldy. (OPT PUMP)

*👷 Fahrul (OPT PUMP)

*👷 ADI S (OPT PUMP)

*👷

Operasional Team JMI

06.00-06.30 : P5M

06.30-13.00 : Running dan Check monitoring pompa 3290 & pompa 3294

13.00-17.30 : Pengerjaan penyambungan pipa HDPE untuk gorong2 dan tunggu alat suport crane
untuk pengangkatan pipa HDPE milik DH

05.45-06.00 House keepping area & prepare pulang

   

SARANA

1. LV JMI-017

HPU 3300

Lokasi : Jalan Houling

Status unit : *Standby Ready menunggu info To DH *


NOTE :

_________

[14.38, 25/7/2022] JMI Hamka: DAILY ACTIVITY REPORT

WEST KINTAB COAL PROJECT

          PT.JARUM MAHAKARYA INDONESIA

           DAY SHIFT

PUKUL 06 : 00 - 18:00

     Selasa, 20-Juni-2022

__________

CREW JMI

👷 Erpan (OPT PUMP)

👷 Sugianur (OPT PUMP)

👷 ARGY (OPT PUMP)

👷 FAHRUL (OPT PUMP)

👷 ADI S (OPT PUMP)

Operasional Team JMI

1.06.00-06.30 : P 5 M

...............................................

2.06.30-10.00 :

Running dan Check monitoring pompa 3290 & pompa 3294

...............................................

3.10.00-17.30 : Pengangkatan pipa HDPE & penyambungan pipa HDPE untuk gorong2

...............................................

17.45-18.00 House keeping area


   

SARANA

1. LV JMI-017

...............................................

HPU 3300

Lokasi : Jalan Houling

Status unit: Standby Ready menunggu info DH

NOTE :

_________

HPU 3290_

Lokasi : Sump Drop Cut

Status:

07.30-10:00 : running

10:00-18:00 : Standby

Note

standby Karna Pompa sdh hisap lumpur

__________

HPU 3294

Lokasi : Sump Drop Cut

Status :

- 07.30-10.00 : running

- 10.00 -18.00 : standby

Note :

standby Karna sudah hisap lumpur

___________

HPU 3288

Lokasi : Water fill

Status. : Standby ready

NOTE :

__________
HPU 3306_

Lokasi : Sump Drop Cut

Status : Standby ready NOTE:

kondisi sump di area

HPU 3306 sudah lumpur

Cuaca : cerah berawan

[14.38, 25/7/2022] JMI Hamka: PT JMI

DAILY ACTIVITY REPORT

WEST KINTAB PROJECT

           NIGHT SHIFT

  Selasa : 20-Juni-2022

Waktu : 18.00 - 06.00

__________

CREW JMI

👷 Hendrii. (OPT PUMP)

👷 Maulani. (OPT PUMP)

👷 Wildan. (OPT PUMP)

Operasional Team JMI

1. 18.00 - 18.30 : P5M

_______________

2. 18.30 - 21.00 : Refuelling Genset & Waiting opt exca Support

________________

3. 21.00 - 05.00 : Progress welding pipa (7 batang)

________________

4. 05.00 - 06.00 : House keepping area & prepare change shift

   

SARANA
1. LV JMI-017

__________

HPU 3306(J1000)

Lokasi : Sump drop cut

Status : Standby Ready

Note. : Sump Mud

_________

HPU 3290(DND 200)

Lokasi : Sump Drop Cut

Status : Standby Ready

Note : Sump Mud

__________

HPU 3294(DND 200)

Lokasi : Sump Drop Cut

Status : Standby Ready

Note : Sump mud

__________

HPU 3288_

Lokasi : Water fill

Status : Standby ready

NOTE : -

__________

HPU 3300

Lokasi. :Jalan houling

Status unit :Standby ready

Cuaca : cerah berawan


[14.38, 25/7/2022] JMI Hamka: DAILY ACTIVITY REPORT

WEST KINTAB COAL PROJECT

             PT.JARUM MAHAKARYA INDONESIA

           DAY SHIFT

PUKUL  06 : 00 - 18:00

     Selasa, 21-Juni-2022

__________

             CREW JMI

👷 Erpan       (OPT PUMP)

👷 Sugianur  (OPT PUMP)

👷 ARGY   (OPT PUMP)

👷 Reynaldi  (OPT PUMP)

👷 ADI S       (OPT PUMP)

Operasional Team JMI

1.06.00-.06.30: P 5 M

...............................................

2.06.30-10.00 :

Running dan Check monitoring pompa 3290 & pompa 3294

...............................................

3.10.00-10.30 : Pengepresan pipa HDPE untuk gorong2

  -10.30-18.00 : Stop progres karna hujan dan unit suport di pakai  Untuk perbaiki jalan houling

...............................................

17.45-18.00 House keeping area

   

               SARANA

1. LV JMI-017

...............................................

               HPU 3300

Lokasi        : Jalan Hauling


Status unit: Standby Ready menunggu info DH 

NOTE :

_________

            HPU 3290_

Lokasi      : Sump Drop Cut

Status:

- 07.30-10.30 : running

-12.00-18.00 :running (continue)

Note :stop running jam 10.30 karna sump mod dan kembali running continue dari jam 12.00 karna
hujan deras

_________

                HPU 3294

Lokasi  :  Sump Drop Cut

Status : 

- 07.30-10.30  : running 

-12.00 -18.00  :

running (continue)

 Note : stop running jam 10.30 karna sump mod

dan kembali running jam 12.00 karna hujan deras

__________

            HPU 3288

Lokasi        : Water fill

Status.       : Running

NOTE          : stop running di jam 10 Karna sudah turun hujan

__________

                HPU 3306_

Lokasi : Sump Drop Cut

Status : running

- 06.00-12.00 :standby ready

- 12.00-18.00  :running
NOTE:

standby ready jam 06.00 karna sump mod

dan running dari jam 12.00 karna hujan deras

Cuaca : hujan

[14.38, 25/7/2022] JMI Hamka: PT JMI

DAILY ACTIVITY REPORT

WEST KINTAB PROJECT

           NIGHT SHIFT

  Selasa : 21-Juni-2022

Waktu : 18.00 - 06.00

__________

CREW JMI

👷 Hendrii. (OPT PUMP)

👷 Maulani. (OPT PUMP)

👷 Wildan. (OPT PUMP)

👷 Fahrul. (OPT PUMP)

Operasional Team JMI

1. 18.00 - 18.30 : P5M

_______________

2. 18.30 - 06.00 : Monitoring pump sump dropcut

   

SARANA

1. LV JMI-017

__________

HPU 3306(J1000)

Lokasi : Sump drop cut

Status : Running
Note. : Continue Running

_________

HPU 3290(DND 200)

Lokasi : Sump Drop Cut

Status : Running

Note : Continue Running

__________

HPU 3294(DND 200)

Lokasi : Sump Drop Cut

Status : Running

Note : Continue Running

__________

HPU 3288_

Lokasi : Water fill

Status : Standby ready

NOTE : -

__________

HPU 3300

Lokasi. :Jalan houling

Status unit :Standby ready

Cuaca : Hujan

[14.38, 25/7/2022] JMI Hamka: DAILY ACTIVITY REPORT

WEST KINTAB PROJECT

PT JMI

___________

NIGHT SHIFT
18:00 - 06:00

RABU,22 JUNI 2022

___________

CREW : HENDRI , FAHRUL, WILDAN

___________

SARANA

1.LV JMI 017

___________

1.HPU 3300 - J600

LOKASI : Jalan houling

STATUS UNIT :

Standby ready,menunggu info DH

REFUELING : 0

___________

2.HPU 3288 CF 28

LOKASI : Water Fill

STATUS : Standby ready

___________

3.HPU 3306 - J1000

LOKASI : Sump drop cut

STATUS : Running

HM AWAL : 71

HM AKHIR : 83

V.AWAL : 41241

V.AKHIR : 50060

TOTAL PROD : 8819

NOTE :-

___________

4.HPU 3290 DND 200

LOKASI : Sump drop Cut

STATUS : Running
HM AWAL : 18504

HM AKHIR : 18516

V. AWAL : 6385542

V.AKHIR :6394980

TOT PROD : 9438

NOTE :-

___________

5. HPU 3294 DND 200

LOKASI : Sump drop Cut

STATUS : Running

HM AWAL : 3548

HM AKHIR : 3560

V. AWAL : 2477571

V.AKHIR :2486359

TOT PROD : 8788

NOTE :-

_________

6 REFUELING:

1.HPU 3300

JUMLAH PENGISIAN : 0 /L

HM UNIT

NOTE : Tidak ada pengisian

___________

2.HPU 3288

JUMLAH PENGISIAN : 0 /L

HM UNIT

NOTE : Tidak ada info

___________

3.HPU 3306

JUMLAH PENGISIAN : 0 /L
HM UNIT

NOTE : Tidak ada pengisian

___________

4.HPU 3290

JUMLAH PENGISIAN : 0 /L

HM UNIT

NOTE : Tidak ada pengisian

___________

5.HPU 3294

JUMLAH PENGISIAN : 0 /L

HM UNIT

NOTE : Tidak ada pengisian

___________

[14.38, 25/7/2022] JMI Hamka: DAILY ACTIVITY REPORT

WEST KINTAB PROJECT

PT JMI

___________

DAY SHIFT

06:00 - 18:00

KAMIS,23 JUNI 2022

___________

CREW : ERPAN , SUGI, ARGY,RENALDY

___________

SARANA

1.LV JMI 017

___________

1.HPU 3300 - J600

LOKASI : Jalan houling

STATUS UNIT :

Standby ready,menunggu info DH

REFUELING : 0
___________

2.HPU 3288 CF 28

LOKASI : Water Fill

STATUS : Standby ready

___________

3.HPU 3306 - J1000

LOKASI : Sump drop cut

STATUS : Running

HM AWAL : 83

HM AKHIR : 95

V.AWAL : 50060

V.AKHIR : 57953

TOTAL PROD : 7893

NOTE :-

___________

4.HPU 3290 DND 200

LOKASI : Sump drop Cut

STATUS : Running

HM AWAL : 18516

HM AKHIR : 18528

V. AWAL : 6394980

V.AKHIR :6404869

TOT PROD : 9889

NOTE :-

___________

5. HPU 3294 DND 200

LOKASI : Sump drop Cut

STATUS : Running

HM AWAL : 3560

HM AKHIR : 3572

V. AWAL : 2486359
V.AKHIR :2495697

TOT PROD : 9338

NOTE :-

_________

6 REFUELING:

1.HPU 3300

JUMLAH PENGISIAN : 0 /L

HM UNIT

NOTE : Tidak ada pengisian

___________

2.HPU 3288

JUMLAH PENGISIAN : 0 /L

HM UNIT

NOTE : Tidak ada info

___________

3.HPU 3306

JUMLAH PENGISIAN : 3000 /L

HM UNIT 88

NOTE : PENGISIAN JAM 11.30 - 13.00

___________

4.HPU 3290

JUMLAH PENGISIAN : 0 /L

HM UNIT

NOTE : Tidak ada pengisian

___________

5.HPU 3294

JUMLAH PENGISIAN : 2026 0 /L

HM UNIT 18523

NOTE : PENGISIAN JAM 13.00 - 14.00

___________
[14.38, 25/7/2022] JMI Hamka: DAILY ACTIVITY REPORT

WEST KINTAB PROJECT

PT JMI

___________

NIGHT SHIFT

18:00 - 06:00

KAMIS,23 JUNI 2022

___________

CREW : MAULANI ,HENDRI ,FAHRUL

___________

SARANA

1.LV JMI 017

___________

1.HPU 3300 - J600

LOKASI : Jalan houling

STATUS UNIT :

Standby ready,menunggu info DH

REFUELING : 0

___________

2.HPU 3288 CF 28

LOKASI : Water Fill

STATUS : Standby ready

___________

3.HPU 3306 - J1000

LOKASI : Sump drop cut

STATUS : Running

HM AWAL : 95

HM AKHIR : 103

V.AWAL : 57953

V.AKHIR : 62215

TOTAL PROD : 4262


NOTE :-

___________

4.HPU 3290 DND 200

LOKASI : Sump drop Cut

STATUS : Running

HM AWAL : 18528

HM AKHIR : 18540

V. AWAL : 6404869

V.AKHIR : 6412329

TOT PROD : 7460

NOTE :-

___________

5. HPU 3294 DND 200

LOKASI : Sump drop Cut

STATUS : Running

HM AWAL : 3572

HM AKHIR : 3584

V. AWAL : 2495697

V.AKHIR : 2501846

TOT PROD : 6149

NOTE :-

_________

6 REFUELING:

1.HPU 3300

JUMLAH PENGISIAN : 0 /L

HM UNIT

NOTE : Tidak ada pengisian

___________

2.HPU 3288

JUMLAH PENGISIAN : 0 /L

HM UNIT
NOTE : Tidak ada info

___________

3.HPU 3306

JUMLAH PENGISIAN : 0/L

HM UNIT : -

NOTE : Tidak ada pengisi

___________

4.HPU 3290

JUMLAH PENGISIAN : 0 /L

HM UNIT : -

NOTE : Tidak ada pengisian

___________

5.HPU 3294

JUMLAH PENGISIAN : 0 /L

HM UNIT : -

NOTE : Tidak ada pengisian

___________

[14.38, 25/7/2022] JMI Hamka: DAILY ACTIVITY REPORT

WEST KINTAB PROJECT

PT JMI

___________

DAY SHIFT

06:00 - 18:00

JUMAT,24 JUNI 2022

___________

CREW : ERPAN ,SUGI ,REYNALDY,WILDAN

___________

SARANA

1.LV JMI 017

___________
1.HPU 3300 - J600

LOKASI : Jalan houling

STATUS UNIT :

Standby ready,menunggu info DH

REFUELING : 0

___________

2.HPU 3288 CF 28

LOKASI : Water Fill

STATUS : Standby ready

___________

3.HPU 3306 - J1000

LOKASI : Sump drop cut

STATUS : Running

HM AWAL : 103

HM AKHIR : 115

V.AWAL : 62215

V.AKHIR : 70342

TOTAL PROD : 8.127

NOTE :-

___________

4.HPU 3290 DND 200

LOKASI : Sump drop Cut

STATUS : Running

HM AWAL : 18538

HM AKHIR : 18550

V. AWAL : 6412329

V.AKHIR : 6422009

TOT PROD : 9680

NOTE :-

___________

5. HPU 3294 DND 200


LOKASI : Sump drop Cut

STATUS : Running

HM AWAL : 3584

HM AKHIR : 3596

V. AWAL : 2501846

V.AKHIR : 2509013

TOT PROD : 7167

NOTE :-

_________

6 REFUELING:

1.HPU 3300

JUMLAH PENGISIAN : 0 /L

HM UNIT

NOTE : Tidak ada pengisian

___________

2.HPU 3288

JUMLAH PENGISIAN : 0 /L

HM UNIT

NOTE : Tidak ada info

___________

3.HPU 3306

JUMLAH PENGISIAN : 2.469/L

HM UNIT : 114

NOTE : PENGISIAN JAM 17.17

___________

4.HPU 3290

JUMLAH PENGISIAN : 1.624 /L

HM UNIT : 18543

NOTE : PENGISIAN JAM 11.00

___________
5.HPU 3294

JUMLAH PENGISIAN : 2.269 /L

HM UNIT : 3586

NOTE : PENGISIAN JAM 08.09

___________

[14.38, 25/7/2022] JMI Hamka: DAILY ACTIVITY REPORT

WEST KINTAB PROJECT

PT JMI

___________

Night SHIFT

18:00-06:00

JUMAT,24 JUNI 2022

___________

CREW : hendri.adi.maulani.arki

__________

SARANA

1.LV JMI 017

___________

1.HPU 3300 - J600

LOKASI : Jalan houling

STATUS UNIT :

Standby ready,menunggu info DH

REFUELING : 0

___________

2.HPU 3288 CF 28

LOKASI : Water Fill

STATUS : standby ready

__________

3.HPU 3306 - J1000

LOKASI : Sump drop cut

STATUS : Running
HM AWAL : 115

HM AKHIR : 126

V.AWAL : 70342

V.AKHIR : 74465

TOTAL PROD : 4123

NOTE : suction tersumbat parting

___________

4.HPU 3290 DND 200

LOKASI : Sump drop Cut

STATUS : Running

HM AWAL : 18550

HM AKHIR : 18562

V. AWAL : 6422009

V.AKHIR : 6430599

TOT PROD : 8590

NOTE :-

___________

5. HPU 3294 DND 200

LOKASI : Sump drop Cut

STATUS : Running

HM AWAL : 3596

HM AKHIR : 3607

V. AWAL : 2509013

V.AKHIR : 2515182

TOT PROD : 6169

NOTE :-

_________

6 REFUELING:

1.HPU 3300

JUMLAH PENGISIAN : 0 /L

HM UNIT
NOTE : Tidak ada pengisian

___________

2.HPU 3288

JUMLAH PENGISIAN : 0 /L

HM UNIT

NOTE : Tidak ada info

___________

3.HPU 3306

JUMLAH PENGISIAN :

HM UNIT :

NOTE : tidak ada pengisian

___________

4.HPU 3290

JUMLAH PENGISIAN :

HM UNIT :

NOTE : tidak ada pengisian

___________

5.HPU 3294

JUMLAH PENGISIAN :

HM UNIT :

NOTE : tidak ada pengisian

__________

[14.38, 25/7/2022] JMI Hamka: DAILY ACTIVITY REPORT

WEST KINTAB PROJECT

PT JMI

___________

DAy SHIFT

06:00-18:00

SABTU,

25 JUNI 2022
___________

CREW : ervan.asgianoor,ade.hendri.

__________

SARANA

1.LV JMI 017

___________

1.HPU 3300 - J600

LOKASI : Jalan houling

STATUS UNIT :

Standby ready,menunggu info DH

REFUELING : 0

___________

2.HPU 3288 CF 28

LOKASI : Water Fill

STATUS : Running by DH

__________

3.HPU 3306 - J1000

LOKASI : Sump drop cut

STATUS : breakdown

HM AWAL : 126

HM AKHIR :0

V.AWAL : 74465

V.AKHIR : 74465

TOTAL PROD : 0

NOTE :

Pompa breakdown, vacumpump stuck (pergantian vacum pump)

___________

4.HPU 3290 DND 200

LOKASI : Sump drop Cut

STATUS : Running

HM AWAL : 18562
HM AKHIR : 18574

V. AWAL : 6430599

V.AKHIR : 6439375

TOT PROD : 8776

NOTE :-

___________

5. HPU 3294 DND 200

LOKASI : Sump drop Cut

STATUS : Running

HM AWAL : 3607

HM AKHIR : 3619

V. AWAL : 2515183

V.AKHIR : 2521197

TOT PROD : 6014

NOTE :-

_________

6 REFUELING:

1.HPU 3300

JUMLAH PENGISIAN : 0 /L

HM UNIT

NOTE : Tidak ada pengisian

___________

2.HPU 3288

JUMLAH PENGISIAN : 0 /L

HM UNIT

NOTE : Tidak ada info

___________

3.HPU 3306

JUMLAH PENGISIAN :

HM UNIT :
NOTE : tidak ada pengisian

___________

4.HPU 3290

JUMLAH PENGISIAN :

HM UNIT :

NOTE : tidak ada pengisian

___________

5.HPU 3294

JUMLAH PENGISIAN :

HM UNIT :

NOTE : tidak ada pengisian

__________

[14.38, 25/7/2022] JMI Hamka: DAILY ACTIVITY REPORT

WEST KINTAB PROJECT

PT JMI

___________

NIGHT SHIFT

18:00-06:00

SABTU,

25 JUNI 2022

___________

CREW : hendri.adi.ahmad.fahrul

__________

SARANA

1.LV JMI 017

___________

1.HPU 3300 - J600

LOKASI : Jalan houling

STATUS UNIT :

Standby ready,menunggu info DH

REFUELING : 0
___________

2.HPU 3288 CF 28

LOKASI : Water Fill

STATUS : Running by DH

__________

3.HPU 3306 - J1000

LOKASI : Sump drop cut

STATUS : breakdown

HM AWAL : 126

HM AKHIR :0

V.AWAL : 74465

V.AKHIR : 74465

TOTAL PROD : 0

NOTE :

Pompa breakdown, belum bisa vacum

___________

4.HPU 3290 DND 200

LOKASI : Sump drop Cut

STATUS : Running

HM AWAL : 18574

HM AKHIR : 18586

V. AWAL : 6439375

V.AKHIR : 6448507

TOT PROD : 9132

NOTE :-

___________

5. HPU 3294 DND 200

LOKASI : Sump drop Cut

STATUS : Running

HM AWAL : 3619

HM AKHIR : 3628
V. AWAL : 2521197

V.AKHIR : 2525740

TOT PROD : 4543

NOTE :

startrunning.

pukul 21:00.P2H dan pembersihan parting

_________

6 REFUELING:

1.HPU 3300

JUMLAH PENGISIAN : 0 /L

HM UNIT

NOTE : Tidak ada pengisian

___________

2.HPU 3288

JUMLAH PENGISIAN : 0 /L

HM UNIT

NOTE : Tidak ada info

___________

3.HPU 3306

JUMLAH PENGISIAN :

HM UNIT :

NOTE : tidak ada pengisian

___________

4.HPU 3290

JUMLAH PENGISIAN :

HM UNIT :

NOTE : tidak ada pengisian

___________

5.HPU 3294

JUMLAH PENGISIAN :
HM UNIT :

NOTE : tidak ada pengisian

__________

[14.38, 25/7/2022] JMI Hamka: DAILY ACTIVITY REPORT

WEST KINTAB PROJECT

PT JMI

___________

DAY SHIFT

06:00-18:00

MINGGU,

26 JUNI 2022

___________

CREW : ERPAN.SUGIANUR.HENDRI.REYNALDY.WILDAN

__________

SARANA

1.LV JMI 017

___________

1.HPU 3300 - J600

LOKASI : Jalan houling

STATUS UNIT :

Standby ready,menunggu info DH

___________

2.HPU 3288 CF 28

LOKASI : Water Fill

STATUS : standby

__________

3.HPU 3306 - J1000

LOKASI : Sump drop cut

STATUS : standby pipa pecah

HM AWAL : 127

HM AKHIR : 136
V.AWAL : 74465

V.AKHIR : 77504

TOTAL PROD : 3.039

NOTE :5 jam hm groundtest

___________

4.HPU 3290 DND 200

LOKASI : Sump drop Cut

STATUS : Running

HM AWAL : 18586

HM AKHIR : 18593

V. AWAL : 6448507

V.AKHIR : 6452877

TOT PROD : 4370

NOTE :standby sump mud

___________

5. HPU 3294 DND 200

LOKASI : Sump drop Cut

STATUS : Running

HM AWAL : 3628

HM AKHIR : 3638

V. AWAL : 2525740

V.AKHIR : 2530872

TOT PROD : 5.132

NOTE : standby sump mud

_________

6 REFUELING:

1.HPU 3300

JUMLAH PENGISIAN : 0 /L

HM UNIT

NOTE : Tidak ada pengisian

___________
2.HPU 3288

JUMLAH PENGISIAN : 0 /L

HM UNIT

NOTE : Tidak ada pengisian

___________

3.HPU 3306

JUMLAH PENGISIAN :

HM UNIT :

NOTE : tidak ada pengisian

___________

4.HPU 3290

JUMLAH PENGISIAN :

HM UNIT :

NOTE : tidak ada pengisian

___________

5.HPU 3294

JUMLAH PENGISIAN : 817

HM UNIT : 3633

NOTE : pengisian jam 11.06

__________

[14.38, 25/7/2022] JMI Hamka: DAILY ACTIVITY REPORT

WEST KINTAB PROJECT

PT JMI

___________

NIGHT SHIFT

18:00-06:00

MINGGU,

26 JUNI 2022

___________

CREW : HENDRI.ARGY.FAHRUL.ADI.
__________

SARANA

1.LV JMI 017

___________

1.HPU 3300 - J600

LOKASI : Jalan houling

STATUS UNIT :

Standby ready,menunggu info DH

___________

2.HPU 3288 CF 28

LOKASI : Water Fill

STATUS : standby

__________

3.HPU 3306 - J1000

LOKASI : Sump drop cut

STATUS : standby sump mud

HM AWAL : 136

HM AKHIR : 136

V.AWAL : 77504

V.AKHIR : 77504

TOTAL PROD : -

NOTE :Sump mud

___________

4.HPU 3290 DND 200

LOKASI : Sump drop Cut

STATUS : Standby

HM AWAL : 18593

HM AKHIR : 18595

V. AWAL : 6452877

V.AKHIR : 6454341

TOT PROD : 1.464


NOTE :standby sump mud

___________

5. HPU 3294 DND 200

LOKASI : Sump drop Cut

STATUS : Standby

HM AWAL : 3638

HM AKHIR : 3642

V. AWAL : 2530872

V.AKHIR : 2532481

TOT PROD : -

NOTE : standby sump mud

_________

6 REFUELING:

1.HPU 3300

JUMLAH PENGISIAN : 0 /L

HM UNIT

NOTE : Tidak ada pengisian

___________

2.HPU 3288

JUMLAH PENGISIAN : 0 /L

HM UNIT

NOTE : Tidak ada pengisian

___________

3.HPU 3306

JUMLAH PENGISIAN : 0/L

HM UNIT :

NOTE : tidak ada pengisian

___________

4.HPU 3290

JUMLAH PENGISIAN : 0/L

HM UNIT :
NOTE : tidak ada pengisian

___________

5.HPU 3294

JUMLAH PENGISIAN : 0/L

HM UNIT :

NOTE : tidak ada pengisian

__________

[14.38, 25/7/2022] JMI Hamka: DAILY ACTIVITY REPORT

WEST KINTAB PROJECT

PT JMI

___________

DAY SHIFT

06:00-18:00

SENIN,

27 JUNI 2022

___________

CREW : HENDRY.SUGIANUR.HENDRI.REYNALDY.WILDAN

__________

SARANA

1.LV JMI 017

___________

1.HPU 3300 - J600

LOKASI : Jalan houling

STATUS UNIT :

Standby ready,menunggu info DH

___________

2.HPU 3288 CF 28

LOKASI : Water Fill

STATUS : standby

__________

3.HPU 3306 - J1000


LOKASI : Sump drop cut

STATUS : standby sump mud

HM AWAL : 136

HM AKHIR : 136

V.AWAL : 77504

V.AKHIR : 77504

TOTAL PROD : -

NOTE :Sump mud

___________

4.HPU 3290 DND 200

LOKASI : Sump drop Cut

STATUS : Standby

HM AWAL : 18595

HM AKHIR : 18595

V. AWAL : 6454341

V.AKHIR : 6454341

TOT PROD : -

NOTE :standby sump mud

___________

5. HPU 3294 DND 200

LOKASI : Sump drop Cut

STATUS : Standby

HM AWAL : 3642

HM AKHIR : 3642

V. AWAL : 2532481

V.AKHIR : 2532481

TOT PROD : -

NOTE : standby sump mud

_________

6 REFUELING:

1.HPU 3300
JUMLAH PENGISIAN : 0 /L

HM UNIT

NOTE : Tidak ada pengisian

___________

2.HPU 3288

JUMLAH PENGISIAN : 0 /L

HM UNIT

NOTE : Tidak ada pengisian

___________

3.HPU 3306

JUMLAH PENGISIAN : 0/L

HM UNIT :

NOTE : tidak ada pengisian

___________

4.HPU 3290

JUMLAH PENGISIAN : 0/L

HM UNIT :

NOTE : tidak ada pengisian

___________

5.HPU 3294

JUMLAH PENGISIAN : 0/L

HM UNIT :

NOTE : tidak ada pengisian

__________

[14.38, 25/7/2022] JMI Hamka: DAILY ACTIVITY REPORT

WEST KINTAB PROJECT

PT JMI

___________

NIGHT SHIFT

18:00-06:00

MINGGU,
26 JUNI 2022

___________

CREW : HENDRI.ARGY.FAHRUL.ADI.

__________

SARANA

1.LV JMI 017

___________

1.HPU 3300 - J600

LOKASI : Jalan houling

STATUS UNIT :

Standby ready,menunggu info DH

___________

2.HPU 3288 CF 28

LOKASI : Water Fill

STATUS : standby

__________

3.HPU 3306 - J1000

LOKASI : Sump drop cut

STATUS : standby sump mud

HM AWAL : 136

HM AKHIR : 136

V.AWAL : 77504

V.AKHIR : 77504

TOTAL PROD : -

NOTE :Sump mud

___________

4.HPU 3290 DND 200

LOKASI : Sump drop Cut

STATUS : Standby

HM AWAL : 18593

HM AKHIR : 18595
V. AWAL : 6452877

V.AKHIR : 6454341

TOT PROD : 1.464

NOTE :standby sump mud

___________

5. HPU 3294 DND 200

LOKASI : Sump drop Cut

STATUS : Standby

HM AWAL : 3638

HM AKHIR : 3642

V. AWAL : 2530872

V.AKHIR : 2532481

TOT PROD : 1.609

NOTE : standby sump mud

_________

6 REFUELING:

1.HPU 3300

JUMLAH PENGISIAN : 0 /L

HM UNIT

NOTE : Tidak ada pengisian

___________

2.HPU 3288

JUMLAH PENGISIAN : 0 /L

HM UNIT

NOTE : Tidak ada pengisian

___________

3.HPU 3306

JUMLAH PENGISIAN : 0/L

HM UNIT :

NOTE : tidak ada pengisian

___________
4.HPU 3290

JUMLAH PENGISIAN : 0/L

HM UNIT :

NOTE : tidak ada pengisian

___________

5.HPU 3294

JUMLAH PENGISIAN : 0/L

HM UNIT :

NOTE : tidak ada pengisian

__________

[14.38, 25/7/2022] JMI Hamka: DAILY ACTIVITY REPORT

WEST KINTAB PROJECT

PT JMI

___________

NIGHT SHIFT

18:00-06:00

Senin,

27 JUNI 2022

___________

CREW : RIZKY.ARGY.ADI.

__________

SARANA

1.LV JMI 017

___________

1.HPU 3300 - J600

LOKASI : Jalan houling

STATUS UNIT :

Standby ready,menunggu info DH

___________

2.HPU 3288 CF 28

LOKASI : Water Fill


STATUS : running by opt DH

__________

3.HPU 3306 - J1000

LOKASI : Sump drop cut

STATUS : standby sump mud

HM AWAL : 136

HM AKHIR : 136

V.AWAL : 77504

V.AKHIR : 77504

TOTAL PROD : 0

NOTE :Sump mud

___________

4.HPU 3290 DND 200

LOKASI : Sump drop Cut

STATUS : running dari 00:00 - 06 :00

HM AWAL : 18595

HM AKHIR : 18601

V. AWAL : 6.454.341

V.AKHIR : 6.458.566

TOT PROD : 4.225

NOTE :

running start

00 :00 - 06 : 00,

Continue running ke shift siang

___________

5. HPU 3294 DND 200

LOKASI : Sump drop Cut

STATUS : Standby

HM AWAL : 3642

HM AKHIR : 3642
V. AWAL : 2532481

V.AKHIR : 2532481

TOT PROD : 0

NOTE : standby sump mud

_________

6 REFUELING:

1.HPU 3300

JUMLAH PENGISIAN : 0 /L

HM UNIT

NOTE : Tidak ada pengisian

___________

2.HPU 3288

JUMLAH PENGISIAN : 0 /L

HM UNIT

NOTE : Tidak ada pengisian

___________

3.HPU 3306

JUMLAH PENGISIAN : 0/L

HM UNIT :

NOTE : tidak ada pengisian

___________

4.HPU 3290

JUMLAH PENGISIAN : 0/L

HM UNIT :

NOTE : tidak ada pengisian

___________

5.HPU 3294

JUMLAH PENGISIAN : 0/L

HM UNIT :

NOTE : tidak ada pengisian

__________
[14.38, 25/7/2022] JMI Hamka: DAILY ACTIVITY REPORT

WEST KINTAB PROJECT

PT JMI

___________

DAY SHIFT

06 :00 - 18 :00

Selasa,

28 JUNI 2022

___________

CREW : Hendri.hendrik.fahrul.

__________

SARANA

1.LV JMI 017

___________

1.HPU 3300 - J600

LOKASI : Jalan houling

STATUS UNIT :

Standby ready,menunggu info DH

___________

2.HPU 3288 CF 28

LOKASI : Water Fill

STATUS : running by opt DH

__________

3.HPU 3306 - J1000

LOKASI : Sump drop cut

STATUS : Running

HM AWAL : 136

HM AKHIR : 147

V.AWAL : 77504

V.AKHIR : 82510

TOTAL PROD : 5006


NOTE :

start 07:00-18:00. Continue running ke shift malam

___________

4.HPU 3290 DND 200

LOKASI : Sump drop Cut

STATUS : running dari 00:00 - 06 :00

HM AWAL : 18601

HM AKHIR : 18611

V. AWAL : 6.458.566

V.AKHIR : 6.463.171

TOT PROD : 4.605

NOTE :

Start 6:00-15:00

Stop 15:00- 17:00 ( P2H + refueling)

Running : 17:00-18:00

Continue running ke shift malam

___________

5. HPU 3294 DND 200

LOKASI : Sump drop Cut

STATUS : running

HM AWAL : 3642

HM AKHIR : 3651

V. AWAL : 2532481

V.AKHIR : 2538788

TOT PROD : 6307

NOTE :

Start 06 :00-15:00

Stop 15:00 - 18 :00 (bersihkan parting.refueling 2293 Liter)

_________
6 REFUELING:

1.HPU 3300

JUMLAH PENGISIAN : 0 /L

HM UNIT

NOTE : Tidak ada pengisian

___________

2.HPU 3288

JUMLAH PENGISIAN : 0 /L

HM UNIT

NOTE : Tidak ada pengisian

___________

3.HPU 3306

JUMLAH PENGISIAN : 0/L

HM UNIT :

NOTE : tidak ada pengisian

___________

4.HPU 3290

JUMLAH PENGISIAN : 1001 liter

HM UNIT : 18610

NOTE :

___________

5.HPU 3294

JUMLAH PENGISIAN : 2293 L

HM UNIT : 3651

NOTE :

__________

[14.38, 25/7/2022] JMI Hamka: DAILY ACTIVITY REPORT

WEST KINTAB PROJECT

PT JMI

___________

NIGHT SHIFT
18 :00 - 06 :00

Selasa,

28 JUNI 2022

___________

CREW : SUGIANOR.ARGY.REYNALDY.

__________

SARANA

1.LV JMI 017

___________

1.HPU 3300 - J600

LOKASI : Jalan houling

STATUS UNIT :

Standby ready,menunggu info DH

___________

2.HPU 3288 CF 28

LOKASI : Water Fill

STATUS :standby

__________

3.HPU 3306 - J1000

LOKASI : Sump drop cut

STATUS : Running

HM AWAL : 147

HM AKHIR : 159

V.AWAL : 82510

V.AKHIR : 89750

TOTAL PROD : 7.240

NOTE :

18:00-06:00. Continue running shift pagi

___________

4.HPU 3290 DND 200

LOKASI : Sump drop Cut


STATUS : running

HM AWAL : 18611

HM AKHIR : 18623

V. AWAL : 6.463.171

V.AKHIR : 6.472.505

TOT PROD : 9.334

NOTE :

Continue running ke shift pagi

___________

5. HPU 3294 DND 200

LOKASI : Sump drop Cut

STATUS : running

HM AWAL : 3651

HM AKHIR : 3651

V. AWAL : 2.538.788

V.AKHIR : 2.546.679

TOT PROD : 7.891

NOTE :

Continue running shift pagi

_________

6 REFUELING:

1.HPU 3300

JUMLAH PENGISIAN : 0 /L

HM UNIT

NOTE : Tidak ada pengisian

___________

2.HPU 3288

JUMLAH PENGISIAN : 0 /L

HM UNIT

NOTE : Tidak ada pengisian


___________

3.HPU 3306

JUMLAH PENGISIAN : 0/L

HM UNIT :

NOTE : tidak ada pengisian

___________

4.HPU 3290

JUMLAH PENGISIAN : 0/ L

HM UNIT : 18610

NOTE :

___________

5.HPU 3294

JUMLAH PENGISIAN : 0/ L

HM UNIT : 3651

NOTE :

__________

[14.38, 25/7/2022] JMI Hamka: DAILY ACTIVITY REPORT

WEST KINTAB PROJECT

PT JMI

___________

DAY SHIFT

06:00 - 18:00

RABU ,29 JUNI 2022

___________

CREW : Hendrii ,Hendri ,Fahrul ,Wildan

___________

SARANA

1.LV JMI 017

___________

1.HPU 3300 - J600

LOKASI : Jalan houling


STATUS UNIT :

Standby ready,menunggu info DH

REFUELING : 0

___________

2.HPU 3288 CF 28

LOKASI : Water Fill

STATUS : Standby ready

___________

3.HPU 3306 - J1000

LOKASI : Sump drop cut

STATUS : Running

HM AWAL : 159

HM AKHIR : 170

V.AWAL : 89750

V.AKHIR : 95656

TOTAL PROD : 5906

NOTE :-

___________

4.HPU 3290 DND 200

LOKASI : Sump drop Cut

STATUS : Running

HM AWAL : 18623

HM AKHIR : 18634

V. AWAL : 6.472.505

V.AKHIR : 6.481.034

TOT PROD : 8.529

NOTE :-

___________

5. HPU 3294 DND 200

LOKASI : Sump drop Cut

STATUS : Running
HM AWAL : 3663

HM AKHIR : 3674

V. AWAL : 2.546.679

V.AKHIR : 2.553.268

TOT PROD : 6.589

NOTE :-

_________

6 REFUELING:

1.HPU 3300

JUMLAH PENGISIAN : 0 /L

HM UNIT

NOTE : Tidak ada pengisian

___________

2.HPU 3288

JUMLAH PENGISIAN : 0 /L

HM UNIT

NOTE : Tidak ada info

___________

3.HPU 3306

JUMLAH PENGISIAN : 2502/L

HM UNIT : 167

NOTE :

___________

4.HPU 3290

JUMLAH PENGISIAN : 0 /L

HM UNIT : -

NOTE : Tidak ada pengisian

___________

5.HPU 3294

JUMLAH PENGISIAN : 1457 /L


HM UNIT : 3674

NOTE :

___________

[14.38, 25/7/2022] JMI Hamka: DAILY ACTIVITY REPORT

WEST KINTAB PROJECT

PT JMI

___________

NIGHT SHIFT

18 :00 - 06 :00

Rabu,29 JUNI 2022

___________

CREW : SUGIANOR.ARGY.REYNALDY.

__________

SARANA

1.LV JMI 017

___________

1.HPU 3300 - J600

LOKASI : Jalan houling

STATUS UNIT :

Standby ready,menunggu info DH

___________

2.HPU 3288 CF 28

LOKASI : Water Fill

STATUS :standby

__________

3.HPU 3306 - J1000

LOKASI : Sump drop cut

STATUS : Running

HM AWAL : 170

HM AKHIR : 182

V.AWAL : 95.656
V.AKHIR : 101.288

TOTAL PROD : 5.642

NOTE :

18:00-06:00. Continue running shift pagi

___________

4.HPU 3290 DND 200

LOKASI : Sump drop Cut

STATUS : running

HM AWAL : 18.634

HM AKHIR : 18.646

V. AWAL : 6.481.034

V.AKHIR : 6.490.852

TOT PROD : 9.818

NOTE :

Continue running ke shift pagi

___________

5. HPU 3294 DND 200

LOKASI : Sump drop Cut

STATUS : running

HM AWAL : 3.674

HM AKHIR : 3.686

V. AWAL : 2.553.268

V.AKHIR : 2.560.479

TOT PROD : 7.211

NOTE :

Continue running shift pagi

_________

6 REFUELING:

1.HPU 3300

JUMLAH PENGISIAN : 0 /L
HM UNIT

NOTE : Tidak ada pengisian

___________

2.HPU 3288

JUMLAH PENGISIAN : 0 /L

HM UNIT

NOTE : Tidak ada pengisian

___________

3.HPU 3306

JUMLAH PENGISIAN : 0/L

HM UNIT :

NOTE : tidak ada pengisian

___________

4.HPU 3290

JUMLAH PENGISIAN : 0/ L

HM UNIT :

NOTE :

___________

5.HPU 3294

JUMLAH PENGISIAN : 0/ L

HM UNIT :

NOTE :

__________

[14.38, 25/7/2022] JMI Hamka: DAILY ACTIVITY REPORT

WEST KINTAB PROJECT

PT JMI

___________

DAY SHIFT

06:00 - 18:00

Kamis ,30 JUNI 2022

___________
CREW : Hendrii ,Hendri ,Fahrul ,Wildan ,Adi

___________

SARANA

1.LV JMI 017

___________

1.HPU 3300 - J600

LOKASI : Jalan houling

STATUS UNIT :

Standby ready,menunggu info DH

REFUELING : 0

___________

2.HPU 3288 CF 28

LOKASI : Water Fill

STATUS : Standby ready

___________

3.HPU 3306 - J1000

LOKASI : Sump drop cut

STATUS : Running

HM AWAL : 182

HM AKHIR : 194

V.AWAL : 101.289

V.AKHIR : 105.495

TOTAL PROD : 4.206

NOTE :-

___________

4.HPU 3290 DND 200

LOKASI : Sump drop Cut

STATUS : Running

HM AWAL : 18646

HM AKHIR : 18658

V. AWAL : 6.490.852
V.AKHIR : 6.499.431

TOT PROD : 8.579

NOTE :-

___________

5. HPU 3294 DND 200

LOKASI : Sump drop Cut

STATUS : Running

HM AWAL : 3686

HM AKHIR : 3697

V. AWAL : 2.560.479

V.AKHIR : 2.566.341

TOT PROD : 5.862

NOTE :-

_________

6 REFUELING:

1.HPU 3300

JUMLAH PENGISIAN : 0 /L

HM UNIT

NOTE : Tidak ada pengisian

___________

2.HPU 3288

JUMLAH PENGISIAN : 0 /L

HM UNIT

NOTE : Tidak ada info

___________

3.HPU 3306

JUMLAH PENGISIAN : 0/L

HM UNIT :

NOTE :

___________
4.HPU 3290

JUMLAH PENGISIAN : 0 /L

HM UNIT : -

NOTE : Tidak ada pengisian

___________

5.HPU 3294

JUMLAH PENGISIAN : /L

HM UNIT :

NOTE :

___________

[14.38, 25/7/2022] JMI Hamka: DAILY ACTIVITY REPORT

WEST KINTAB PROJECT

PT JMI

___________

NIGHT SHIFT

18 :00 - 06 :00

KAMIS,30 JUNI 2022

___________

CREW : SUGIANOR.ARGY.REYNALDY.

__________

SARANA

1.LV JMI 017

___________

1.HPU 3300 - J600

LOKASI : Jalan houling

STATUS UNIT :

Standby ready,menunggu info DH

___________

2.HPU 3288 CF 28

LOKASI : Water Fill

STATUS :standby
__________

3.HPU 3306 - J1000

LOKASI : Sump drop cut

STATUS : Running

HM AWAL : 194

HM AKHIR : 206

V.AWAL : 105.495

V.AKHIR : 111.398

TOTAL PROD : 5.903

NOTE :

Continue running shift pagi

___________

4.HPU 3290 DND 200

LOKASI : Sump drop Cut

STATUS : running

HM AWAL : 18.658

HM AKHIR : 18.665

V. AWAL : 6.499.431

V.AKHIR : 6.504.727

TOT PROD : 5.296

NOTE :

Continue running shift pagi

___________

5. HPU 3294 DND 200

LOKASI : Sump drop Cut

STATUS : running

HM AWAL : 3.697

HM AKHIR : 3.709

V. AWAL : 2.566.341

V.AKHIR : 2.571.573
TOT PROD : 5.232

NOTE :

Continue running shift pagi

_________

6 REFUELING:

1.HPU 3300

JUMLAH PENGISIAN : 0 /L

HM UNIT

NOTE : Tidak ada pengisian

___________

2.HPU 3288

JUMLAH PENGISIAN : 0 /L

HM UNIT

NOTE : Tidak ada pengisian

___________

3.HPU 3306

JUMLAH PENGISIAN : 0/L

HM UNIT :

NOTE : tidak ada pengisian

___________

4.HPU 3290

JUMLAH PENGISIAN : 2.000/ L

HM UNIT : 18.658

NOTE :

Pengisian jam 22.30 - 23.38

___________

5.HPU 3294

JUMLAH PENGISIAN : 873/ L

HM UNIT : 3.703

NOTE :

Pengisian jam 23.40 - 00.21


__________

[14.38, 25/7/2022] JMI Hamka: DAILY ACTIVITY REPORT

WEST KINTAB PROJECT

PT JMI

___________

NIGHT SHIFT

18 :00 - 06 :00

JUMAT,01 JULI 2022

___________

CREW : SUGIANOR.FAHRUL.ARGY.

__________

SARANA

1.LV JMI 017

___________

1.HPU 3300 - J600

LOKASI : Jalan houling

STATUS UNIT :

Standby ready,menunggu info DH

___________

2.HPU 3288 CF 28

LOKASI : Water Fill

STATUS :standby

__________

3.HPU 3306 - J1000

LOKASI : Sump drop cut

STATUS : Standby

HM AWAL : 216

HM AKHIR : 227

V.AWAL : 115.738

V.AKHIR : 120.384

TOTAL PROD : 4.646


NOTE :

Standby sump mud

___________

4.HPU 3290 DND 200

LOKASI : Sump drop Cut

STATUS : standby

HM AWAL : 18.675

HM AKHIR : 18.687

V. AWAL : 6.512.779

V.AKHIR : 6.517.390

TOT PROD : 4.611

NOTE :

Standby sump mud

___________

5. HPU 3294 DND 200

LOKASI : Sump drop Cut

STATUS : Standby

HM AWAL : 3.721

HM AKHIR : 3.733

V. AWAL : 2.575.993

V.AKHIR : 2.579.353

TOT PROD : 3.360

NOTE :

Standby sump mud

_________

6 REFUELING:

1.HPU 3300

JUMLAH PENGISIAN : 0 /L

HM UNIT

NOTE : Tidak ada pengisian


___________

2.HPU 3288

JUMLAH PENGISIAN : 0 /L

HM UNIT

NOTE : Tidak ada pengisian

___________

3.HPU 3306

JUMLAH PENGISIAN : 0/L

HM UNIT :

NOTE : tidak ada pengisian

___________

4.HPU 3290

JUMLAH PENGISIAN : 0/ L

HM UNIT :

NOTE :

___________

5.HPU 3294

JUMLAH PENGISIAN : / L

HM UNIT :

NOTE :

__________

[14.38, 25/7/2022] JMI Hamka: DAILY ACTIVITY REPORT

WEST KINTAB PROJECT

PT JMI

___________

DAY SHIFT

06 :00 - 18:00

MINGGU,03 JULI 2022

___________

CREW : HENDRI.HENDRY.ARGY.ADI H.

__________
SARANA

1.LV JMI 017

___________

1.HPU 3300 - J600

LOKASI : Jalan houling

STATUS UNIT :

Standby ready,menunggu info DH

___________

2.HPU 3288 CF 28

LOKASI : Water Fill

STATUS :standby

__________

3.HPU 3306 - J1000

LOKASI : Sump drop cut

STATUS : Standby

HM AWAL : 227

HM AKHIR : 227

V.AWAL : 120.384

V.AKHIR : 120.384

TOTAL PROD : -

NOTE :

Standby sump mud

___________

4.HPU 3290 DND 200

LOKASI : Sump drop Cut

STATUS : standby

HM AWAL : 18.689

HM AKHIR : 18.691

V. AWAL : 6.518.461

V.AKHIR : 6.519.951

TOT PROD : 1.490


NOTE :

Standby sump mud

___________

5. HPU 3294 DND 200

LOKASI : Sump drop Cut

STATUS : Standby

HM AWAL : 3.733

HM AKHIR : 3.735

V. AWAL : 2.579.353

V.AKHIR : 2.580.638

TOT PROD : 1.285

NOTE :

Standby sump mud

_________

6 REFUELING:

1.HPU 3300

JUMLAH PENGISIAN : 0 /L

HM UNIT

NOTE : Tidak ada pengisian

___________

2.HPU 3288

JUMLAH PENGISIAN : 0 /L

HM UNIT

NOTE : Tidak ada pengisian

___________

3.HPU 3306

JUMLAH PENGISIAN : 0/L

HM UNIT :

NOTE : tidak ada pengisian

___________
4.HPU 3290

JUMLAH PENGISIAN : 0/ L

HM UNIT :

NOTE :

___________

5.HPU 3294

JUMLAH PENGISIAN : / L

HM UNIT :

NOTE :

__________

[14.38, 25/7/2022] JMI Hamka: DAILY ACTIVITY REPORT

WEST KINTAB PROJECT

PT JMI

___________

NIGHT SHIFT

18 :00 - 06 :00

MINGGU,03 JULI 2022

___________

CREW : SUGIANOR.FAHRUL.WILDAN.

__________

SARANA

1.LV JMI 017

___________

1.HPU 3300 - J600

LOKASI : Jalan houling

STATUS UNIT :

Standby ready,menunggu info DH

___________

2.HPU 3288 CF 28

LOKASI : Water Fill

STATUS :standby
__________

3.HPU 3306 - J1000

LOKASI : Sump drop cut

STATUS : Standby

HM AWAL : 227

HM AKHIR : 227

V.AWAL : 120.384

V.AKHIR : 120.384

TOTAL PROD : -

NOTE :

Standby sump mud

___________

4.HPU 3290 DND 200

LOKASI : Sump drop Cut

STATUS : standby

HM AWAL : 18.691

HM AKHIR : 18.699

V. AWAL : 6.519.951

V.AKHIR : 6.526.088

TOT PROD : 6.137

NOTE :

Standby sump mud

___________

5. HPU 3294 DND 200

LOKASI : Sump drop Cut

STATUS : Standby

HM AWAL : 3.735

HM AKHIR : 3.743

V. AWAL : 2.580.638

V.AKHIR : 2.585.672
TOT PROD : 5.034

NOTE :

Standby sump mud

_________

6 REFUELING:

1.HPU 3300

JUMLAH PENGISIAN : 0 /L

HM UNIT

NOTE : Tidak ada pengisian

___________

2.HPU 3288

JUMLAH PENGISIAN : 0 /L

HM UNIT

NOTE : Tidak ada pengisian

___________

3.HPU 3306

JUMLAH PENGISIAN : 0/L

HM UNIT :

NOTE : tidak ada pengisian

___________

4.HPU 3290

JUMLAH PENGISIAN : 0/ L

HM UNIT :

NOTE : tidak ada pengisian

___________

5.HPU 3294

JUMLAH PENGISIAN : 0/ L

HM UNIT :

NOTE : tidak ada pengisian

__________

[14.38, 25/7/2022] JMI Hamka: DAILY ACTIVITY REPORT


WEST KINTAB PROJECT

PT JMI

___________

DAY SHIFT

06:00 - 18:00

Kamis ,04 JULI 2022

___________

CREW : Hendrii ,Hendri ,Reynaldi ,Argya ,Adi

___________

SARANA

1.LV JMI 017

___________

1.HPU 3300 - J600

LOKASI : Jalan houling

STATUS UNIT :

Standby ready,menunggu info DH

___________

2.HPU 3288 CF 28

LOKASI : Water Fill

STATUS :standby

__________

3.HPU 3306 - J1000

LOKASI : Sump drop cut

STATUS : Standby

HM AWAL :

HM AKHIR :

V.AWAL :

V.AKHIR :

TOTAL PROD : -

NOTE :

Standby sump mud


___________

4.HPU 3290 DND 200

LOKASI : Sump drop Cut

STATUS : standby

HM AWAL :

HM AKHIR :

V. AWAL :

V.AKHIR :

TOT PROD :

NOTE :

Standby sump mud

___________

5. HPU 3294 DND 200

LOKASI : Sump drop Cut

STATUS : Standby

HM AWAL :

HM AKHIR :

V. AWAL :

V.AKHIR :

TOT PROD :

NOTE :

Standby sump mud

_________

6 REFUELING:

1.HPU 3300

JUMLAH PENGISIAN : 0 /L

HM UNIT

NOTE : Tidak ada pengisian

___________

2.HPU 3288
JUMLAH PENGISIAN : 0 /L

HM UNIT

NOTE : Tidak ada pengisian

___________

3.HPU 3306

JUMLAH PENGISIAN : 0/L

HM UNIT :

NOTE : tidak ada pengisian

___________

4.HPU 3290

JUMLAH PENGISIAN : 0/ L

HM UNIT :

NOTE : tidak ada pengisian

___________

5.HPU 3294

JUMLAH PENGISIAN : 0/ L

HM UNIT :

NOTE : tidak ada pengisian

__________

[14.38, 25/7/2022] JMI Hamka: DAILY ACTIVITY REPORT

WEST KINTAB PROJECT

PT JMI

___________

NIGHT SHIFT

18 :00 - 06 :00

SENIN,04 JULI 2022

___________

CREW : SUGIANOR.FAHRUL.WILDAN.

__________

SARANA

1.LV JMI 017


___________

1.HPU 3300 - J600

LOKASI : Jalan houling

STATUS UNIT :

Standby ready,menunggu info DH

___________

2.HPU 3288 CF 28

LOKASI : Water Fill

STATUS :standby

__________

3.HPU 3306 - J1000

LOKASI : Sump drop cut

STATUS : Standby

HM AWAL : 227

HM AKHIR : 227

V.AWAL : 120.384

V.AKHIR : 120.384

TOTAL PROD : -

NOTE :

Standby sump mud

___________

4.HPU 3290 DND 200

LOKASI : Sump drop Cut

STATUS : standby

HM AWAL : 18.699

HM AKHIR : 18.705

V. AWAL : 6.526.088

V.AKHIR : 6.529.990

TOT PROD : 3.902

NOTE :

Standby sump mud


___________

5. HPU 3294 DND 200

LOKASI : Sump drop Cut

STATUS : Standby

HM AWAL : 3.743

HM AKHIR : 3.743

V. AWAL : 2.580.672

V.AKHIR : 2.585.672

TOT PROD : -

NOTE :

Standby sump mud

_________

6 REFUELING:

1.HPU 3300

JUMLAH PENGISIAN : 0 /L

HM UNIT

NOTE : Tidak ada pengisian

___________

2.HPU 3288

JUMLAH PENGISIAN : 0 /L

HM UNIT

NOTE : Tidak ada pengisian

___________

3.HPU 3306

JUMLAH PENGISIAN : 0/L

HM UNIT :

NOTE : tidak ada pengisian

___________

4.HPU 3290

JUMLAH PENGISIAN : 0/ L
HM UNIT :

NOTE : tidak ada pengisian

___________

5.HPU 3294

JUMLAH PENGISIAN : 0/ L

HM UNIT :

NOTE : tidak ada pengisian

__________

[14.38, 25/7/2022] JMI Hamka: DAILY ACTIVITY REPORT

WEST KINTAB PROJECT

PT JMI

___________

DAY SHIFT

06:00 - 18:00

Selasa ,05 JULI 2022

___________

CREW : Hendrii ,Hendri ,Argya ,Adi

___________

SARANA

1.LV JMI 017

___________

1.HPU 3300 - J600

LOKASI : Jalan houling

STATUS UNIT :

Standby ready,menunggu info DH

___________

2.HPU 3288 CF 28

LOKASI : Water Fill

STATUS :standby

__________

3.HPU 3306 - J1000


LOKASI : Sump drop cut

STATUS : Standby

HM AWAL :

HM AKHIR :

V.AWAL :

V.AKHIR :

TOTAL PROD : -

NOTE :

Standby sump mud

___________

4.HPU 3290 DND 200

LOKASI : Sump drop Cut

STATUS : standby

HM AWAL :

HM AKHIR :

V. AWAL :

V.AKHIR :

TOT PROD :

NOTE :

Standby sump mud

___________

5. HPU 3294 DND 200

LOKASI : Sump drop Cut

STATUS : Standby

HM AWAL :

HM AKHIR :

V. AWAL :

V.AKHIR :

TOT PROD :

NOTE :
Standby sump mud

_________

6 REFUELING:

1.HPU 3300

JUMLAH PENGISIAN : 0 /L

HM UNIT

NOTE : Tidak ada pengisian

___________

2.HPU 3288

JUMLAH PENGISIAN : 0 /L

HM UNIT

NOTE : Tidak ada pengisian

___________

3.HPU 3306

JUMLAH PENGISIAN : 0/L

HM UNIT :

NOTE : tidak ada pengisian

___________

4.HPU 3290

JUMLAH PENGISIAN : 0/ L

HM UNIT :

NOTE : tidak ada pengisian

___________

5.HPU 3294

JUMLAH PENGISIAN : 0/ L

HM UNIT :

NOTE : tidak ada pengisian

__________

[14.38, 25/7/2022] JMI Hamka: DAILY ACTIVITY REPORT

WEST KINTAB PROJECT

PT JMI
___________

DAY SHIFT

06:00 - 18:00

RABU ,20 JULI 2022

___________

CREW : ERPAN ,MAULANI,ARGY,HILMAN,HENDRI

___________

SARANA

1.LV JMI 017

___________

1.HPU 3300 - J600

LOKASI : Jalan houling

STATUS UNIT :

Standby ready,menunggu info DH

___________

2.HPU 3288 CF 28

LOKASI : Water Fill

STATUS :standby

__________

3.HPU 3306 - J1000

LOKASI : Sump JB

STATUS : Standby Waiting info DH

HM AWAL : 227

HM AKHIR : 227

V.AWAL : 120.384

V.AKHIR : 120.384

TOTAL PROD : -

NOTE :

Standby waiting info

___________

4.HPU 3290 DND 200


LOKASI : Sump drop Cut

STATUS : standby(progress pengencangan pipa bocor)

HM AWAL : 18.751

HM AKHIR : 18.751

V. AWAL : 6.558.508

V.AKHIR : 6.558.508

TOT PROD : -

NOTE :

Standby progress penegencangan pipa bocor

___________

5. HPU 3294 DND 200

LOKASI : Sump drop Cut

STATUS : Standby pipa patah

HM AWAL : 3.786

HM AKHIR : 3.786

V. AWAL : 2.611.722

V.AKHIR : 2.611.722

TOT PROD : -

NOTE :

Standby pipa patah

_________

6 REFUELING:

1.HPU 3300

JUMLAH PENGISIAN : 0 /L

HM UNIT

NOTE : Tidak ada pengisian

___________

2.HPU 3288

JUMLAH PENGISIAN : 0 /L

HM UNIT
NOTE : Tidak ada pengisian

___________

3.HPU 3306

JUMLAH PENGISIAN : 0/L

HM UNIT :

NOTE : tidak ada pengisian

___________

4.HPU 3290

JUMLAH PENGISIAN : 0/ L

HM UNIT :

NOTE : tidak ada pengisian

___________

5.HPU 3294

JUMLAH PENGISIAN : 0/ L

HM UNIT :

NOTE : tidak ada pengisian

__________

[14.38, 25/7/2022] JMI Hamka: DAILY ACTIVITY REPORT

WEST KINTAB PROJECT

PT JMI

___________

DAY SHIFT

06:00 - 18:00

JUMAT ,22 JULI 2022

___________

CREW : ERPAN ,MAULANI,REYNALDY,HILMAN,HENDRI

___________

SARANA

1.LV JMI 017

___________

1.HPU 3300 - J600


LOKASI : Jalan houling

STATUS UNIT :

Standby ready,menunggu info DH

___________

2.HPU 3288 CF 28

LOKASI : Water Fill

STATUS :standby

__________

3.HPU 3306 - J1000

LOKASI : Sump JB

STATUS : Standby Waiting info DH

HM AWAL : 227

HM AKHIR : 227

V.AWAL : 120.384

V.AKHIR : 120.384

TOTAL PROD : -

NOTE :

Standby waiting info

___________

4.HPU 3290 DND 200

LOKASI : Sump drop Cut

STATUS : Running

HM AWAL : 18.763

HM AKHIR : 18.769

V. AWAL : 6.564.204

V.AKHIR : 6.569.175

TOT PROD : 4.971

NOTE :

___________

5. HPU 3294 DND 200


LOKASI : Sump drop Cut

STATUS : Standby pipa patah

HM AWAL : 3.786

HM AKHIR : 3.786

V. AWAL : 2.611.722

V.AKHIR : 2.611.722

TOT PROD : -

NOTE :

Standby pipa patah

_________

6 REFUELING:

1.HPU 3300

JUMLAH PENGISIAN : 0 /L

HM UNIT

NOTE : Tidak ada pengisian

___________

2.HPU 3288

JUMLAH PENGISIAN : 0 /L

HM UNIT

NOTE : Tidak ada pengisian

___________

3.HPU 3306

JUMLAH PENGISIAN : 0/L

HM UNIT :

NOTE : tidak ada pengisian

___________

4.HPU 3290

JUMLAH PENGISIAN : 850/ L

HM UNIT : 18.763

NOTE : tidak ada pengisian

___________
5.HPU 3294

JUMLAH PENGISIAN : 0/ L

HM UNIT :

NOTE : tidak ada pengisian

__________

[14.38, 25/7/2022] JMI Hamka: DAILY ACTIVITY REPORT

WEST KINTAB PROJECT

PT JMI

__________

NIGHT SHIFT

18:00 - 06:00

JUMAT ,22 JULI 2022

_________

Crew : Hendri.Julak.adi.fahrul.argy __________

SARANA

1.LV JMI 017

___________

1.HPU 3300 - J600

LOKASI : Jalan houling

STATUS UNIT :

Standby ready,menunggu info DH

___________

2.HPU 3288 CF 28

LOKASI : Water Fill

STATUS :standby

__________

3.HPU 3306 - J1000

LOKASI : Sump JB

STATUS : Standby Waiting info DH

HM AWAL : 227

HM AKHIR : 227
V.AWAL : 120.384

V.AKHIR : 120.384

TOTAL PROD : -

NOTE :

Standby waiting info

___________

4.HPU 3290 DND 200

LOKASI : Sump drop Cut

STATUS : Running

HM AWAL : 18.769

HM AKHIR : 18.781

V. AWAL : 6.569.175

V.AKHIR : 6.581.385

TOT PROD : 12210

NOTE :

___________

5. HPU 3294 DND 200

LOKASI : Sump drop Cut

STATUS : Standby pipa patah

HM AWAL : 3.786

HM AKHIR : 3.786

V. AWAL : 2.611.722

V.AKHIR : 2.611.722

TOT PROD : -

NOTE :

Penyambungan pipa sudah mencapai 78 meter

120 meter -78 meter = 42 meter

_________

6 REFUELING:

1.HPU 3300
JUMLAH PENGISIAN : 0 /L

HM UNIT

NOTE :

___________

2.HPU 3288

JUMLAH PENGISIAN :

HM UNIT

NOTE :

___________

3.HPU 3306

JUMLAH PENGISIAN : 0/L

HM UNIT :

NOTE :

___________

4.HPU 3290

JUMLAH PENGISIAN :

HM UNIT : 18.763

NOTE :

___________

5.HPU 3294

JUMLAH PENGISIAN :

HM UNIT :

NOTE :

__________

[14.38, 25/7/2022] JMI Hamka: DAILY ACTIVITY REPORT

WEST KINTAB PROJECT

PT JMI

___________

DAY SHIFT

06:00 - 18:00

SABTU ,23 JULI 2022


___________

CREW : ERPAN ,MAULANI,REYNALDY,HILMAN,HENDRI

___________

SARANA

1.LV JMI 017

___________

1.HPU 3300 - J600

LOKASI : Jalan houling

STATUS UNIT :

Standby ready,menunggu info DH

___________

2.HPU 3288 CF 28

LOKASI : Water Fill

STATUS :standby

__________

3.HPU 3306 - J1000

LOKASI : Sump JB

STATUS : Standby Waiting info

HM AWAL : 227

HM AKHIR : 230

V.AWAL : 120.384

V.AKHIR : 121.477

TOTAL PROD : 1.093

NOTE :

*12.00 - 13.00: groundtes

*13.00 - 15.00:running

*15.00 - 18.00:standby outlet meluap

___________

4.HPU 3290 DND 200

LOKASI : Sump drop Cut


STATUS : Running

HM AWAL : 18.781

HM AKHIR : 18.792

V. AWAL : 6.581.385

V.AKHIR : 6.590.988

TOT PROD : 9.603

NOTE :continue running

___________

5. HPU 3294 DND 200

LOKASI : Sump drop Cut

STATUS : Standby pipa patah

HM AWAL : 3.786

HM AKHIR : 3.786

V. AWAL : 2.611.722

V.AKHIR : 2.611.722

TOT PROD : -

NOTE :

Standby pipa patah

_________

6 REFUELING:

1.HPU 3300

JUMLAH PENGISIAN : 0 /L

HM UNIT

NOTE : Tidak ada pengisian

___________

2.HPU 3288

JUMLAH PENGISIAN : 0 /L

HM UNIT

NOTE : Tidak ada pengisian

___________
3.HPU 3306

JUMLAH PENGISIAN : 0/L

HM UNIT :

NOTE : tidak ada pengisian

___________

4.HPU 3290

JUMLAH PENGISIAN : 900/ L

HM UNIT : 18.785

NOTE : pengisian jam 10.00

___________

5.HPU 3294

JUMLAH PENGISIAN : 0/ L

HM UNIT :

NOTE : tidak ada pengisian

__________