Page 1 of 49 Internal Audits
Nr. Classific. Process: Non-conformity / Re- Root cause analysis Actions Responsible Deadline Done
Nc1/Nc2/OFI Potential current (5 x why /Ishikawa)
Standard: 7.2.2
✘
Onjob training not effective Ibrahim Gareer
Evidence: Operator Mohamed
Afifi 26423 puts space tape Senior
under grommet P00152083 Management Target:
1 with no evidence of training in Actual:
Mohamed
Fahrer F45 Qualification Soliman
matrix G306
Standard: 8.5.1.2
✘
Safety instruction not effective
Evidence: Safety instruction Ahmed El-
for safety of hands on test Desouky
board not available at Fahrer Ibrahim Gareer
F45
Senior
Target:
2 Management Actual:
Mohamed Waly
/ Mohamed
Soliman
VA 3011 enclosure 1 / 01.11
Page 2 of 49 Internal Audits
Standard: 8.5.2.1
✘
Traceability of Work instruction Ahmed Badr
not ensured
Evidence: pre block diagram Senior
at Fahrer F45 3/2018 no Management Target:
3
tracking of issue level or link Mohamed Actual:
with drawing or latest Soliman
telecopy
Standard: 10.2.3
✘
control plan reviews not ensured
Evidence 1: new release
7/2017 was implemented on
4/4 with no evidence that
control plan was reviewed Amr Hammad
against this build phase as it
was reviewed last in Mar-18 Senior
Evidence 2: 4. Control plan Target:
4 Management Actual:
log of BMW was last updated Wael Hassan
on 15.3.2018 while 8D report
of OT1801246 mentions that it
was reviewed on 3.5.2018
Standard: 8.3.5.2
✘
identification of components not Ibrahim Gareer
effective
Evidence: white body clip with Senior
black seal was identified as Management Target:
5 tape P00011434 fahrer F45 Actual:
Mohamed
varient 8797491 Soliman
VA 3011 enclosure 1 / 01.11
Page 3 of 49 Internal Audits
Standard: 8.5.4.1
Storage condition not ensured
Evidence: part number Seif El-Deeb
418373650 qty 515 fifo
31.09.2018 on rack 06 30 05 Seniro Target:
6 was stored without respect to Actual:
✘ management
storage orientation on the box Mohamed
Nassef
Standard 8.5.1.2
✘
Safety instruction not ensured
Ahmed El-
safety instruction for using
Desouky Seif El
crane in the stores is not
deeb
available
Senior
Target:
7 Management Actual:
Mohamed Waly
/ Mohamed
Nassef
Standard 8.5.1
✘
Control of production not Ahmed Anwar
effective
Evidence: a piece of paper Senior
with red and yellow circles Management Target:
8 used in CST for coiling with Actual:
Mohamed
no issue number and no data Soliman
and not reflected in a WI
VA 3011 enclosure 1 / 01.11
Page 4 of 49 Internal Audits
Standard: 8.5.3
✘
Customer property not secured
Evidence: customer property
(packaging material) not Seif El-Deeb
secured against damage, a
cover of pallet was seen Seniro Target:
9 laying on the floor, another Actual:
management
pallet was seen leaning on the Mohamed
boxes with risk of damage Nassef
Standard 10.2.3
✘
corrective actions not effective
Evidence: logistic concern
OT-1800402 an action with a Seif El-Deeb
log to be created to track
separating air freight from sea Seniro Target:
10 freight shipment was not done Actual:
management
although 8D report states that Mohamed
it was created on 13.06.2018 Nassef
Standard 5.1.1.2
KPIs not monitored properly
Marwa Keshk
Evidence: In May 2018
average recruiting time is 0.2 Target:
11 Senior Actual:
✘ while actual data calculations
Management
gave different results
Susan Hanafi
Standard 8.3.5.2
✘
Identification of components not Ahmed Anwar
ensured
Evidence: 2. Cable PN used in Senior
KOMAX 18 is 767830104888 Management Target:
12
while its identified as Mohamed Actual:
P00112235 Soliman
VA 3011 enclosure 1 / 01.11
Page 5 of 49 Internal Audits
Standard 8.5.1
production control is not
effective
Evidence: 3. WI VA-Cut-QM-
125 mentioned in control plan Ahmed Badr
CST-QCP-001 for product
specs reference states Senior
minimum pull force for Management Target:
13 Actual:
✘
combination Mohamed
terminal:P00131352 and Soliman
cable:P00117550 is 120N while
it is stated 108 N in Komax
machine.
Remarks to No.
Nc1: Major Non-conformity, Nc2: Minor Non-conformity, OFI: Opportunity for Improvement
VA 3011 enclosure 1 / 01.11
Page 6 of 49 Internal Audits
Success Check/
(Signature/Date)
VA 3011 enclosure 1 / 01.11
Page 7 of 49 Internal Audits
VA 3011 enclosure 1 / 01.11
Page 8 of 49 Internal Audits
VA 3011 enclosure 1 / 01.11
Page 9 of 49 Internal Audits
VA 3011 enclosure 1 / 01.11
Page 10 of 49 Internal Audits
Date:
Process / Procedure:
Non-Conformity /
Potential:
5 x Why
What was the reason for non Cause
conformity? 1
Cause
2
Cause
3
Cause
4
Cause
5 (Root
cause)
Corrective action
Date, Signature
Responsible
Date:
Process / Procedure:
Non-Conformity /
Potential:
5 x Why
What was the reason for non Cause
conformity? 1
Cause
2
Cause
3
Cause
4
Cause
5 (Root
cause)
Corrective action
Date, Signature
Responsible
Date:
Process / Procedure:
Non-Conformity /
Potential:
5 x Why
What was the reason for non Cause
conformity? 1
Cause
2
Cause
3
Cause
4
Cause
5 (Root
cause)
Corrective action
Date, Signature
Responsible
Date:
Process / Procedure:
Non-Conformity /
Potential:
5 x Why
What was the reason for non Cause
conformity? 1
Cause
2
Cause
3
Cause
4
Cause
5 (Root
cause)
Corrective action
Date, Signature
Responsible
Date:
Process / Procedure:
Non-Conformity /
Potential:
5 x Why
What was the reason for non Cause
conformity? 1
Cause
2
Cause
3
Cause
4
Cause
5 (Root
cause)
Corrective action
Date, Signature
Responsible
Date:
Process / Procedure:
Non-Conformity /
Potential:
5 x Why
What was the reason for non Cause
conformity? 1
Cause
2
Cause
3
Cause
4
Cause
5 (Root
cause)
Corrective action
Date, Signature
Responsible
Date:
Process / Procedure:
Non-Conformity /
Potential:
5 x Why
What was the reason for non Cause
conformity? 1
Cause
2
Cause
3
Cause
4
Cause
5 (Root
cause)
Corrective action
Date, Signature
Responsible
Date:
Process / Procedure:
Non-Conformity /
Potential:
5 x Why
What was the reason for non Cause
conformity? 1
Cause
2
Cause
3
Cause
4
Cause
5 (Root
cause)
Corrective action
Date, Signature
Responsible
Date:
Process / Procedure:
Non-Conformity /
Potential:
5 x Why
What was the reason for non Cause
conformity? 1
Cause
2
Cause
3
Cause
4
Cause
5 (Root
cause)
Corrective action
Date, Signature
Responsible
Date:
Process / Procedure:
Non-Conformity /
Potential:
5 x Why
What was the reason for non Cause
conformity? 1
Cause
2
Cause
3
Cause
4
Cause
5 (Root
cause)
Corrective action
Date, Signature
Responsible
Date:
Process / Procedure:
Non-Conformity /
Potential:
5 x Why
What was the reason for non Cause
conformity? 1
Cause
2
Cause
3
Cause
4
Cause
5 (Root
cause)
Corrective action
Date, Signature
Responsible
Date:
Process / Procedure:
Non-Conformity /
Potential:
5 x Why
What was the reason for non Cause
conformity? 1
Cause
2
Cause
3
Cause
4
Cause
5 (Root
cause)
Corrective action
Date, Signature
Responsible
Date:
Process / Procedure:
Non-Conformity /
Potential:
5 x Why
What was the reason for non Cause
conformity? 1
Cause
2
Cause
3
Cause
4
Cause
5 (Root
cause)
Corrective action
Date, Signature
Responsible