(GEO-01-SK-012/19 REV. A)
According to the requirements in the area of the E-HOUSE and the necessary area for its HVAC equipment some
modifications in the main structure at the level (+) 20.000 (cellar deck) needs to be taking account to provide good
service and access to this area.
The proposal for the structure of the cantilever for this purpose its shown in the next figures and their respective
structural drawings was perform and delivered
After perform the structural proposal, an allowable stress review was made for the critical member with the preliminary
weights of the equipment. After, a structural analysis model in SACS was developed to review the structural behavior of
this part in operative and extreme conditions.
B
MAIN DECK
CELLAR DECK
For this review all the analysis criteria was included in the structural report developed and delivered to the client
After these works the model and the report had updates for the changes in the weights because in the first stages we
work with preliminary data obtained by the equipment supplier
HSP ACTIVITIES FOR THE MODIFICATIONS IN CELLAR DECK AREA
After the proposal in the location of the E-HOUSE over HSP it was necessary the adequacy in the main structure to have
an access route for this room and their equipment
For this modifications in the structure a proposal was made like is shown in the next figures and their respective
structural drawings was perform and delivered
After perform the structural proposal, an allowable stress review was made for the critical members. For this review all
the analysis criteria was included in the structural report developed and delivered to the client