Velicia Nurman
15518039
Tugas 3
On-Bottom Stability Analysis Tutorial
Based on DNV RP E305 "

Pipeline Properties (Seamless pipe, flammable content)

Outer Diameter Do ≔ 10.75 in = 273.05 mm

Wall Thickness tst ≔ 0.5 in = 12.7 mm

Specific Minimum Yield Strength SMYS ≔ 450 MPa

Specific Minimum Tensile Strength SMTS ≔ 535 MPa

Carbon Steel Density ρst ≔ 7850 kg ⋅ m -3

Steel Modulus Elasticity E ≔ 2.07 ⋅ 10 5 MPa

Poisson Ratio ν ≔ 0.3

Pipeline Joint Length lp ≔ 12.2 m

Corrosion Allowance tca ≔ 3 mm

Air Density ρair ≔ 0 kg ⋅ m -3

kg
Reservoir content Density ρreservoir ≔ 52.7 lb ⋅ ft -3 = 844.173 ――
m3
Coating Properties
Corrosion Type 3LPE

Corrosion Coating Density ρcorr ≔ 940 kg ⋅ m -3

Corrosion Coating Thickness tcorr ≔ 3.5 mm


Corrosion Coating Cutback cccorr ≔ 150 mm

Concrete Density ρcc ≔ 3040 kg ⋅ m -3

Concrete Cutback ccconc ≔ 350 mm

Polyurethane Foam Infill ρif ≔ 1025 kg ⋅ m -3

Environmental Data
ρif ≔ 1025 kg ⋅ m -3

Environmental Data

Water Depth d ≔ 57.9 m

m2
Seawater Viscosity v ≔ 1.076 ⋅ 10 -5 ft 2 ⋅ s -1 = ⎛⎝9.996 ⋅ 10 -7⎞⎠ ――
s
Significant Wave Height 1-yr Period Hs.1yr ≔ 3.24 m
‾‾‾‾‾‾‾‾‾
250 ⋅ Hs.1yr
Peak Wave Period 1-yr Tp.1yr ≔ ―――― = 9.088 s
g

Significant Wave Height 10-yr Period Hs.10yr ≔ 4.75 m


‾‾‾‾‾‾‾‾‾‾
250 ⋅ Hs.10yr
Peak Wave Period 10-yr Tp.10yr ≔ ――――= 11.004 s
g

Significant Wave Height 100-yr Period Hs.100yr ≔ 5.19 m


‾‾‾‾‾‾‾‾‾‾
250 ⋅ Hs.100yr
Peak Wave Period 100-yr Tp.100yr ≔ ―――― = 11.503 s
g

1-yr Current Speed (51.3 m MSL) U1yr ≔ 0.52 m ⋅ s -1

10-yr Current Speed (51.3 m MSL) U10yr ≔ 0.55 m ⋅ s -1

100-yr Current Speed (51.3 m MSL) U100yr ≔ 0.62 m ⋅ s -1

Marine Growth Density ρmg ≔ 1400 kg ⋅ m -3

Marine Growth Thickness tmg ≔ 75 mm

kg
Seawater Density ρw ≔ 1025 ――
m3
Soil Type: soil ≔ “clay”

Bottom Roughness z0 ≔ 5 ⋅ 10 -5 mm

Grain Size d50 ≔ 0.065 mm

Current Measurement Depth Ref. zr ≔ d - 51.3 m = 6.6 m

Sea State Durations Tstorm ≔ 3 hr = ⎛⎝1.08 ⋅ 10 4 ⎞⎠ s

Clay Undrained Shear Strength su ≔ 2 kPa

kN
Submerged Weight γs' ≔ 3.5 ――
m3

kN
Bulk Weight Unit γs ≔ 12.7 ――
m3
kN
Bulk Weight Unit γs ≔ 12.7 ――
m3
Current Directionality θc ≔ 90 deg

Submerged Weight Calculation (Installation)

Thickness of Concrete Weight Coating tcc ≔ tcc.inst

Inner Diameter IDinst ≔ Do - 2 ⋅ tst = 0.248 m


1
Pipeline Cross Section Area As.inst ≔ ―⋅ π ⋅ ⎛⎝Do 2 - IDinst 2 ⎞⎠ = 0.01 m 2
4
Corrosion Coating Diameter Dcorr ≔ Do + 2 ⋅ tcorr = 0.28 m

Concrete Coating Diameter Dconc ≔ Dcorr + 2 ⋅ tcc = 0.28 m

Pipeline Weight Wst.inst ≔ As.inst ⋅ ρst ⋅ g ⋅ lp = 9.756 kN


1
Corrosion Coating Area Acorr ≔ ―⋅ π ⋅ ⎛⎝Dcorr 2 - Do 2 ⎞⎠ = 0.003 m 2
4
Corrosion Coating Weight Wcorr ≔ ρcorr ⋅ g ⋅ ⎛⎝lp - 2 ⋅ cccorr⎞⎠ ⋅ Acorr = 0.334 kN
1
Concrete Cross Section Area Acc.inst ≔ ―⋅ π ⋅ ⎛⎝Dconc 2 - Dcorr 2 ⎞⎠ = 0 m 2
4
π
Content Cross Section Area Areservoir ≔ ―⋅ IDinst 2 = 0.048 m 2
4
Concrete Coating Weight Wcc.inst ≔ ρcc ⋅ Acc.inst ⋅ ⎛⎝lp - 2 ⋅ ccconc⎞⎠ ⋅ g = 0 kN
1
Infill Cross Section (corr. cutback) Aif.corr ≔ ―⋅ π ⋅ ⎛⎝Dcorr 2 - Do 2 ⎞⎠ = 0.003 m 2
4
Content Weight Wreservoir ≔ ρreservoir ⋅ Areservoir ⋅ lp ⋅ g = 4.865 kN

Corrosion Infill Weight Wif.corr ≔ ρif ⋅ Aif.corr ⋅ 2 ⋅ cccorr = 0.935 kg


1
Infill Cross Section (concrete Aif.cc ≔ ―⋅ π ⋅ ⎛⎝Dconc 2 - Dcorr 2 ⎞⎠ = 0 m 2
cutback) 4

Concrete Coating Infill Weight Wif.conc ≔ ρif ⋅ Aif.cc ⋅ 2 ⋅ ccconc = 0 kg

Infill Weight Wif ≔ ⎛⎝Wif.corr + Wif.conc⎞⎠ ⋅ g = 9.17 N

Marine Growth Diameter In installation condition, there is no possibility of


marine growth existence.
π kN
Buoyancy Force (per unit length) Binst ≔ ρw ⋅ g ⋅ ―⋅ Dconc 2 = 0.619 ――
4 m
π kN
Binst ≔ ρw ⋅ g ⋅ ―⋅ Dconc 2 = 0.619 ――
4 m

kN
Pipeline Submerged Weight (per unit length) Wsub.inst ≔ ⎛Wst.inst + Wcorr ↲⎞ ↲ = 0.209 ――
⎜ ⎟ m
⎝+ Wcc.inst + Wif ⎠
1
⋅ ―- Binst
lp

Submerged Weight Calculation (Operation)

Thickness of Concrete Weight Coating tcc ≔ tcc.ope

Inner Diameter IDope ≔ Do - 2 ⋅ ⎛⎝tst - tca⎞⎠ = 0.254 m


1
Pipeline Cross Section Area As.ope ≔ ―⋅ π ⋅ ⎛⎝Do 2 - IDope 2 ⎞⎠ = 0.008 m 2
4
Concrete Coating Diameter Dconc.ope ≔ Dcorr + 2 ⋅ tcc = 0.366 m

Pipeline Weight Wst.ope ≔ As.ope ⋅ ρst ⋅ g ⋅ lp = 7.537 kN

Corrosion Coating Weight Wcorr = 0.334 kN


1
Concrete Cross Section Area Acc ≔ ―⋅ π ⋅ ⎛⎝Dconc.ope 2 - Dcorr 2 ⎞⎠ = 0.044 m 2
4
Concrete Coating Weight Wcc.ope ≔ ρcc ⋅ Acc ⋅ ⎛⎝lp - 2 ⋅ ccconc⎞⎠ ⋅ g = 14.962 kN
1
Content Cross Section Area Areservoir ≔ ―⋅ π ⋅ IDope 2 = 0.051 m 2
4
Content Weight Wreservoir ≔ ρreservoir ⋅ Areservoir ⋅ lp ⋅ g = 5.104 kN

Infill Cross Section (corr. cutback) Aif.corr = 0.003 m 2

Coating Infill Weight Wif.corr ≔ ρif ⋅ Aif.corr ⋅ 2 ⋅ cccorr = 0.935 kg


1
Infill Cross Section (concrete cutback) Aif.cc ≔ ―⋅ π ⋅ ⎛⎝Dconc.ope 2 - Dconc 2 ⎞⎠ = 0.044 m 2
4
Coating Concrete Infill Weight Wif.conc ≔ ρif ⋅ Aif.cc ⋅ 2 ⋅ ccconc = 31.312 kg

Infill Weight Wif ≔ ⎛⎝Wif.corr + Wif.conc⎞⎠ ⋅ g = 0.316 kN

Marine Growth Diameter Dmg.ope ≔ Dconc.ope + 2 ⋅ tmg = 0.516 m


1
Marine Growth Weight Wmg.ope ≔ ρmg ⋅ ―⋅ π ⋅ ⎛⎝Dmg.ope 2 - Dconc.ope 2 ⎞⎠ ⋅ lp ⋅ g = 17.406 kN
4
π kN
Buoyancy Force (per unit length) Bope ≔ ρw ⋅ g ⋅ ―⋅ Dmg.ope 2 = 2.102 ――
4 m

kN
Pipeline Submerged Weight (per unit length) Wsub.ope ≔ ⎛Wst.ope + Wcorr ↲ ⎞ ↲ = 0.213 ――
⎜ ⎟ m
⎜+ Wcc.ope + Wif ↲⎟
⎜⎝+ Wreservoir ⎟⎠
1
⋅ ―- Bope
kN
Pipeline Submerged Weight (per unit length) Wsub.ope ≔ ⎛Wst.ope + Wcorr ↲ ⎞ ↲ = 0.213 ――
⎜ ⎟ m
⎜+ Wcc.ope + Wif ↲⎟
⎜⎝+ Wreservoir ⎟⎠
1
⋅ ―- Bope
lp

Vertical Stability Check


Installation
1.1 ⋅ Binst
Unity Check UCver.inst ≔ ―――――= 0.823
Wsub.inst + Binst
Checkver.inst ≔ if UCver.inst ≥ 1 ∨ UCver.inst < 0 |
‖ “Pipeline Floats” |
‖ |
else if 0.99 < UCver.inst < 1 |
‖ “Criteria is fulfilled with optimum concrete thickness” |
‖ |
else |
‖ “Criteria is fulfilled, optimization needed” |
‖ |

Checkver.inst = “Criteria is fulfilled, optimization needed”

Minimum Concrete Thickness tcc.inst ≡ 0 mm

Operation
1.1 ⋅ Bope
Unity Check UCver.ope ≔ ――――― = 0.999
Wsub.ope + Bope
Checkver.ope ≔ if UCver.ope ≥ 1 ∨ UCver.ope < 0 |
‖ “Pipeline Floats” |
‖ |
else if 0.99 < UCver.ope < 1 |
‖ “Criteria is fulfilled with optimum concrete thickness” |
‖ |
else |
‖ “Criteria is fulfilled, optimization needed” |
‖ |

Checkver.ope = “Criteria is fulfilled with optimum concrete thickness”

Minimum Concrete Thickness tcc.ope ≡ 43 mm

Velocities associated to wave and current

Analysis Condition cond ≔ “operation” dominant ≔ “wave”

Concrete Thickness tcc ≔ tcc.lat


Concrete Thickness tcc ≔ tcc.lat

Total Diameter Dtot ≔ Dcorr + 2 ⋅ tcc = 0.36 m

m
Current Velocity U ≔ if dominant = “wave” ∧ cond = “installation” | = 0.55 ―
‖ | s
‖ U1yr |
else if dominant = “current” ∧ cond = “installation”|
‖ |
‖ U10yr |
|
else if dominant = “wave” ∧ cond = “operation” |
‖ |
‖ U10yr |
else |
‖ |
‖ U 100yr |

Mean Perpendicular Current Velocity


⎛⎛ z0 ⎞ ⎛ Dtot ⎞ ⎞
⎜ ⎜1 + ―― ⎟ ⋅ ln ⎜―― + 1⎟ - 1 ⎟
⎜⎝ Dtot ⎠ ⎝ z0 ⎠ ⎟ m
Vc ≔ U ⋅ ――――――――― = 0.435 ―
⎜ ⎛ zr ⎞ ⎟ s
⎜ ln ⎜―+ 1⎟ ⎟
⎜⎝ ⎝ z0 ⎠ ⎟⎠

Significant Wave Height Hs ≔ if dominant = “wave” ∧ cond = “installation” | = 5.19 m


‖ |
H
‖ s.10yr |
else if dominant = “current” ∧ cond = “installation”|
‖ |
‖ Hs.1yr |
|
else if dominant = “wave” ∧ cond = “operation” |
‖ |
‖ Hs.100yr |
else |
‖ |
‖ Hs.10yr |

Peak Wave Period Tp ≔ if dominant = “wave” ∧ cond = “installation” | = 11.503 s


‖ |
‖ Tp.10yr |
else if dominant = “current” ∧ cond = “installation”|
‖ |
‖ Tp.1yr |
|
else if dominant = “wave” ∧ cond = “operation” |
‖ |
‖ Tp.100yr |
else |
‖ |
‖ T p.10yr |

Reference Period ‾‾
d
Tn ≔ ―= 2.43 s
g

Tn
Xaxis ≔ ― = 0.211
Tp

Significant Flow Water Velocity, Us (Linear Wave Theory)


Significant Flow Water Velocity, Us (Linear Wave Theory)

Based on Figure 3-2, it can be assumed


according to the red line that the y-axis:

yaxis ≔ 0.175
Therefore,
Hs ⋅ yaxis m
Us ≔ ―――= 0.374 ―
Tn s

Zero Up-crossing Period

Based on Figure 3-3, it can be assumed


according to the red line that the y-axis:
yaxis ≔ 1.051
Therefore,

Tu ≔ Tp ⋅ yaxis = 12.089 s

Reduction Factor due to Wave Directionality R≔1 Conservative assumption

m
Significant Flow Velocity at pipe level (section 2.3.10) Us ≔ 0.374 ―
s
Mean Zero Up-crossing of Oscillating Flow at Pipe Tu = 12.089 s
Level (Eq. 3.13)

Reference Period (Section 1.5.1) Tn = 2.43 s

Generalized Stability Analysis Check


Generalized Stability Analysis Check

kN
Submerged Weight Wsub ≔ if cond = “installation” | = 0.213 ――
‖W | m
‖ sub.inst |
else if cond = “operation”|
‖W |
‖ sub.ope ||

Wsub
Shear Strength Parameter (Clay) S ≔ ――― = 0.296
Dtot ⋅ su
Significant Keulegan-Carpenter
Us ⋅ Tp
Number (Sect 5.2.2) K ≔ ――― = 11.948
Dtot

Wsub
Pipe Weight Parameter (Sect 5.2.2) L ≔ ―――――― = 8.265
0.5 ⋅ ρw ⋅ Dtot ⋅ Us 2

Vc
Current to Wave Velocity Ratio M ≔ ― = 1.163
(Sect 1.5.1) Us

Use Simplified Static Stability Analysis

Simplified Static Stability Analysis Check


Friction calibration factor (Figure 5.11) μ ≔ 0.3
1
―= 3.375
Lift Force Coefficient (Section 5.3.8) CL ≔ 0.9 S

Drag Force Coefficient (Section 5.3.8) CD ≔ 0.7

Inertia Force Coefficient (Section 5.3.8) CM ≔ 3.29

Significant acceleration perpendicular to


2 ⋅ π ⋅ Us m
pipeline(Section 5.3.8) As ≔ ――― = 0.194 ―
Tu s2
1 2
Lift Force FL ((θ)) ≔ ―ρw ⋅ Dtot ⋅ CL ⋅ ⎛⎝Us ⋅ cos ((θ)) + Vc⎞⎠
(Section 5.3.8) 2

1
Drag Force FD ((θ)) ≔ ―ρw ⋅ Dtot ⋅ CD ⋅ ⎛⎝Us ⋅ cos ((θ)) + Vc⎞⎠ ↲
(Section 5.3.8) 2
⋅ ||Us ⋅ cos ((θ)) + Vc||
Inertia Force
π ⋅ Dtot 2
(Section 5.3.8) FI (θ) ≔ ―――⋅ ρw ⋅ CM ⋅ As ⋅ sin ((θ))
( )
4
⎛⎝FD ((θ)) + FI ((θ))⎞⎠ + μ ⋅ FL ((θ))
θ ≔ 0 , 0.1 ‥ 180 deg FLateral ((θ)) ≔ ―――――――――
μ
⎛⎝FD ((θ)) + FI ((θ))⎞⎠ + μ ⋅ FL ((θ))
FLateral ((θ)) ≔ ―――――――――
μ

0.495
0.45
0.405
0.36 FD ((θ)) ⎛⎝kN ⋅ m -1⎞⎠
0.315

FL ((θ)) ⎛⎝kN ⋅ m -1⎞⎠


0.27
0.225
0.18
0.135
FI ((θ)) ⎛⎝kN ⋅ m -1⎞⎠
0.09
0.045
0
0 20 40 60 80 100 120 140 160 180
FLateral ((θ)) ⎛⎝kN ⋅ m -1⎞⎠

θ ((deg ))

Calibration Factor (Fig 5.12) K = 11.948


M ≔ 1.163
FW ≔ 1.15

θ ≔ 0 deg θmax ≔ maximize ⎛⎝FLateral , θ⎞⎠ = 0.589


1
FLateral ⎛⎝θmax⎞⎠ = 0.456 ―⋅ kN
m
kN
Required Submerged Weight (Sect 5.3.6) Ws ≔ FLateral ⎛⎝θmax⎞⎠ ⋅ FW = 0.524 ――
m
Analysis Condition cond = “operation”

dominant = “wave”

Concrete Thickness tcc.lat ≡ 40 mm

Stability Check
Stability Check

⎛ ⎛ Ws ⎞ ⎞|
SC ≔ if ⎜⎜―― - FL ⎛⎝θmax⎞⎠⎟ ⋅ μ ≥ ⎛⎝FD ⎛⎝θmax⎞⎠ + FI ⎛⎝θmax⎞⎠⎞⎠⎟| = “The linepipe is stable”
⎝⎝ FW ⎠ ⎠|
‖ “The linepipe is stable” |
‖ |
else |
‖ “The linepipe is not stable” |
‖ |