"Cost Estimate for Interlocking Tiles at Dusshera Maidan"

Description

1 CIVIL COST ESTIMATE

TOTAL
g Tiles at Dusshera Maidan"
Amount (Rs.)

657,374.46

657,374.46
"Cost Estimate for Interlocking Tiles at Dusshera Maidan Area 1"
Item Reference Description
NOS L B H Unit QTY.
No.
Schedule of Rate Items
Item No :- 4.1, RUIDP - Dressing of earth work in surface excavation including
1 ISOR - 2017 cutting and filling upto 30cm depth including disposal of
excavated earth upto 50m and lift upto 1.5 m.
Area 1 sqm 962.7
Item No :- 18, Chapter R-3 Compaction of original ground with maximum of six
Eathwork for Roads; BSR passes of 8-10 tonnes power roller including filling
2 PWD CIRCLE, KOTA depression occurring during rolling (MoRTH specification : 100 sqm 962.7
clause 305.3.4)
Item No :- 9.10, RUIDP - Providing and fixing of precast concrete interlocking tiles of
ISOR - 2017 desired shape of M 30 grade manufactured from fully
computerized automatic stationery hydraulic viebro
pressed machine and fully computerized automatic
batching plant of class A1/A2 as per BS 6717:2001. The
CC interlocking paving blocks be laid on average 50mm.
thick bed of coarse sand and the joint is to be filled with
3 fine sand. Laying procedure on compacted sub-base as
defined. Complete job is to be executed as per the
instruction of Engineer incharge. The rates to be inclusive
of all lead & Lifts etc. complete as per specifications.
Tensile splitting strength, abrasion and braking load etc. as
per BS 6717:2001, Grey cement.

Item No :- 9.10.3, RUIDP - 100mm thick


ISOR - 2017
Area 1 sqm 962.7
Item No :- 13.4., RUIDP - Providing, laying and compacting plain/ reinforced cement
ISOR - 2017 concrete of specified grade in foundation/ leveling course/
pile cap using concrete mixer and vibrater complete
4 including cost of form work, as per drawing and technical
specifications and as per clause 1100, 1500,1700,2100 of
MoRT&H specification including all scaffolding material,
labour, machinery.

Item No :- 13.4.2, RUIDP - PCC Grade M -20


ISOR - 2017

Area 1 138 0.200 0.100 CUM 2.76

TOT
cking Tiles at Dusshera Maidan Area 1"
Rate (Rs.) Amount (Rs.)

27.00 25992.90

180.00 1732.86

641.00 617090.70

4,550.00 12558.00

TOTAL 'A' 657,374.46


say 6.5 lakh