You are on page 1of 23

ETABS 20.0.

Foundation detail for Heavy Lab and canteen


Size of footing: 1m x1m with 400 depth provided with double tie beam.
Lower tie beam: size: 230x300 with 3-16mm thought out
Plinth beam: 300x400 with 3-16 throughout and 2-16 extra
Column size : 450x450mm

TU-ICU - BASEMENT.EDB Page 1 of 23 6/30/2022


ETABS 20.0.0

TU-ICU - BASEMENT.EDB Page 2 of 23 6/30/2022


ETABS 20.0.0

Base plate connection


Size of Base plate : Same as ICU bridge
Column connection same as ICU bridge
Beam and column connection – same as icu bridge (For number of bolt see the figure below)

provide End Batten size 250x350x6 LxBxT


Provide Intermediate Batten of
Size 250x300x6 LxBxT
CHANNEL SECTION USED ISMC 250
Weight per Meter (w) 30.4 kg/m
Sectional Area (a) 38.67 cm2
Depth of Section (h) 250 mm
Width of flange (bf) 80 mm

TU-ICU - BASEMENT.EDB Page 3 of 23 6/30/2022


ETABS 20.0.0

Thickness of Flange (tf) 14.1 mm


Thickness of Web (t w) 7.1 mm
Centre of Gravity Cyy 2.3 cm
Ixx cm4 3816.8 cm4
Iyy cm4 219.1 cm4
Raddi of Gyration r xx 9.94 cm
Raddi of Gyration ryy 2.38 cm
Modulli of Section Z xx 305.3 cm3
Modulli of Section Zyy 38.4 cm3
Maximum size of Flange Rivet 25 mm
h1 192.5 mm
h2 28.7 mm
b1/2 36.5 mm
Connection Details
C 8.6 mm
g 45 mm
g1 65 mm
Maximum size of Flange Rivet 25 mm

TU-ICU - BASEMENT.EDB Page 4 of 23 6/30/2022


ETABS 20.0.0

300

750 mm 250 mm

350

250 mm 115 mm

250mm

TU-ICU - BASEMENT.EDB Page 5 of 23 6/30/2022


ETABS 20.0.0

Beam Column connection

TU-ICU - BASEMENT.EDB Page 6 of 23 6/30/2022


ETABS 20.0.0

TU-ICU - BASEMENT.EDB Page 7 of 23 6/30/2022


ETABS 20.0.0

TU-ICU - BASEMENT.EDB Page 8 of 23 6/30/2022


ETABS 20.0.0

TU-ICU - BASEMENT.EDB Page 9 of 23 6/30/2022


ETABS 20.0.0

TU-ICU - BASEMENT.EDB Page 10 of 23 6/30/2022


ETABS 20.0.0

TU-ICU - BASEMENT.EDB Page 11 of 23 6/30/2022


ETABS 20.0.0

Truss Member connection:


5 mm weld
Base tie 10mm double plate with 6 numbers of M16(8.8) Bolts

Size of Foundation 1mx1m with double tie beam ( similar to ICU Bridge ,
reinforcement same for beam and column)

TU-ICU - BASEMENT.EDB Page 12 of 23 6/30/2022


ETABS 20.0.0

TU-ICU - BASEMENT.EDB Page 13 of 23 6/30/2022


ETABS 20.0.0

TU-ICU - BASEMENT.EDB Page 14 of 23 6/30/2022


ETABS 20.0.0

TU-ICU - BASEMENT.EDB Page 15 of 23 6/30/2022


ETABS 20.0.0

TU-ICU - BASEMENT.EDB Page 16 of 23 6/30/2022


ETABS 20.0.0

TU-ICU - BASEMENT.EDB Page 17 of 23 6/30/2022


ETABS 20.0.0

TU-ICU - BASEMENT.EDB Page 18 of 23 6/30/2022


ETABS 20.0.0

TU-ICU - BASEMENT.EDB Page 19 of 23 6/30/2022


ETABS 20.0.0

TU-ICU - BASEMENT.EDB Page 20 of 23 6/30/2022


ETABS 20.0.0

TU-ICU - BASEMENT.EDB Page 21 of 23 6/30/2022


ETABS 20.0.0

TU-ICU - BASEMENT.EDB Page 22 of 23 6/30/2022


ETABS 20.0.0

TU-ICU - BASEMENT.EDB Page 23 of 23 6/30/2022

You might also like