ETABS 20.0.

0 License #*1YR8AL2V5CRMFR6

MAIN BEAM: 350X500


COLUMN SIZE: 550X550
SECONDARY BEAM SIZE:
250X350
SHEAR WALL THICKNESS:
230MM

TU-ICU - BASEMENT.EDB Page 1 of 27 6/30/2022


ETABS 20.0.0 License #*1YR8AL2V5CRMFR6

Beam reinforcement
Beam rebar support top and bottom
mid
Area of longitudnal reinforcement = 2080 mm2
Throughout Extra
No of 25mm bars = 0 mm No of 25mm bars = 0 mm
No of 20 mm bars = 4 mm No of 20 mm bars = 4 mm
No of 16 mm bars = 0 mm No of 16 mm bars = 0 mm
No of 12 mm bars = 0 mm No of 12 mm bars = 0 mm
Area of steel provided = 1256 mm2 Area of steel provided = 1256 mm2
Total Area of steel provided at Top 2512 mm2

rd
Up to 3 floor in Grid A-A, B-B, C-
C,D-D,E-E,F-F
RD
ABOVE 3 FLOOR
Throughout Extra
No of 25mm bars = 0 mm No of 25mm bars = 0 mm
No of 20 mm bars = 4 mm No of 20 mm bars = 2 mm
No of 16 mm bars = 0 mm No of 16 mm bars = 0 mm
No of 12 mm bars = 0 mm No of 12 mm bars = 0 mm
Area of steel provided = 1256 mm2 Area of steel provided = 628 mm2

TU-ICU - BASEMENT.EDB Page 2 of 27 6/30/2022


ETABS 20.0.0 License #*1YR8AL2V5CRMFR6

Total Area of steel provided at Top 1884 mm2

4 LEGGED STIRRUP FOR ALL


MAIN BEAM
COLUMN REINFORCEENT
C1- 26NOS.-20MM DAI
C-18NOS.-20MM DIA

TU-ICU - BASEMENT.EDB Page 3 of 27 6/30/2022


ETABS 20.0.0 License #*1YR8AL2V5CRMFR6

TU-ICU - BASEMENT.EDB Page 4 of 27 6/30/2022


ETABS 20.0.0 License #*1YR8AL2V5CRMFR6

SECONDARY BEAM -250X350


3-NOS OF 16 BAR WITH
WITH 2 LEGGED STIRRUP

FOR BEAM 450X400(BXD)


(For location of this beam refer
picture below)

TU-ICU - BASEMENT.EDB Page 5 of 27 6/30/2022


ETABS 20.0.0 License #*1YR8AL2V5CRMFR6

TU-ICU - BASEMENT.EDB Page 6 of 27 6/30/2022


ETABS 20.0.0 License #*1YR8AL2V5CRMFR6

TU-ICU - BASEMENT.EDB Page 7 of 27 6/30/2022


ETABS 20.0.0 License #*1YR8AL2V5CRMFR6

TU-ICU - BASEMENT.EDB Page 8 of 27 6/30/2022


ETABS 20.0.0 License #*1YR8AL2V5CRMFR6

TU-ICU - BASEMENT.EDB Page 9 of 27 6/30/2022


ETABS 20.0.0 License #*1YR8AL2V5CRMFR6

TU-ICU - BASEMENT.EDB Page 10 of 27 6/30/2022


ETABS 20.0.0 License #*1YR8AL2V5CRMFR6

TU-ICU - BASEMENT.EDB Page 11 of 27 6/30/2022


ETABS 20.0.0 License #*1YR8AL2V5CRMFR6

TU-ICU - BASEMENT.EDB Page 12 of 27 6/30/2022


ETABS 20.0.0 License #*1YR8AL2V5CRMFR6

TU-ICU - BASEMENT.EDB Page 13 of 27 6/30/2022


ETABS 20.0.0 License #*1YR8AL2V5CRMFR6

TU-ICU - BASEMENT.EDB Page 14 of 27 6/30/2022


ETABS 20.0.0 License #*1YR8AL2V5CRMFR6

TU-ICU - BASEMENT.EDB Page 15 of 27 6/30/2022


ETABS 20.0.0 License #*1YR8AL2V5CRMFR6

TU-ICU - BASEMENT.EDB Page 16 of 27 6/30/2022


ETABS 20.0.0 License #*1YR8AL2V5CRMFR6

TU-ICU - BASEMENT.EDB Page 17 of 27 6/30/2022


ETABS 20.0.0 License #*1YR8AL2V5CRMFR6

TU-ICU - BASEMENT.EDB Page 18 of 27 6/30/2022


ETABS 20.0.0 License #*1YR8AL2V5CRMFR6

TU-ICU - BASEMENT.EDB Page 19 of 27 6/30/2022


ETABS 20.0.0 License #*1YR8AL2V5CRMFR6

Strap beam required: 300x450 with 5-


16mm bars throughout at top and
bottom with 8 mm of stirrup 2-legged
-Plinth beam 300x450mm
3-20 through 2-16mm extra

TU-ICU - BASEMENT.EDB Page 20 of 27 6/30/2022


ETABS 20.0.0 License #*1YR8AL2V5CRMFR6

TU-ICU - BASEMENT.EDB Page 21 of 27 6/30/2022


ETABS 20.0.0 License #*1YR8AL2V5CRMFR6

TU-ICU - BASEMENT.EDB Page 22 of 27 6/30/2022


ETABS 20.0.0 License #*1YR8AL2V5CRMFR6

TU-ICU - BASEMENT.EDB Page 23 of 27 6/30/2022


ETABS 20.0.0 License #*1YR8AL2V5CRMFR6

TU-ICU - BASEMENT.EDB Page 24 of 27 6/30/2022


ETABS 20.0.0 License #*1YR8AL2V5CRMFR6

Depth of slab= 600mm


Projection = 750mm from the face of column
Strap beam required
Provide 20 mm of bar in two direction at 200mm spacing

For isolated foundation


Isolated foundation Depth = 400mm
With 16mm bar at 150mm spacing
Size 2x2m

TU-ICU - BASEMENT.EDB Page 25 of 27 6/30/2022


ETABS 20.0.0 License #*1YR8AL2V5CRMFR6

After addition of Beam

TU-ICU - BASEMENT.EDB Page 26 of 27 6/30/2022


ETABS 20.0.0 License #*1YR8AL2V5CRMFR6

TU-ICU - BASEMENT.EDB Page 27 of 27 6/30/2022