PROJECT AND REPORT DESCRIPTION

Project: Disaster Resilience of School Project (DRSP)

Client: Central level Project Implementation Unit (CLPIU Education)


Gyaneshwor, Kathmandu, Nepal

Consultant: Design and Supervision Consultant (DSC) - M/S Umar Munshi Associates
in association with Sub-Consultants ERMC (P) Ltd, PACE Consultants (P)
Ltd and Progressive Research & Consulting Services
Lakhe Marg, New Baneshwor, Kathmandu, Nepal.
Phone: 01-5245144

Document: School Assessment and Intervention Design Report

Scope: SHREE BHADRAKALI SECONDARY SCHOOL (EMIS230450007)

Part: √ Part 1: Field Assessment Report


Part 2: Intermediate Assessment Report
Part 3: Final Technical Report

Study Team: Paulo Barbosa – Team Leader


Ishrat Alam - Structural Engineer
Rabindra Adhikari – Structural Engineer
Pushkar Koirala – Structural Engineer
Dinesh Dulal – Structural Engineer
….
….

Date: December 2019

2|Page
Contents
1. Summary........................................................................................................................................4
1.1 School Location, Site Condition and Local Implication...........................................................4
1.2 School Condition....................................................................................................................6
1.3 Building Condition and Proposed Test...................................................................................7
1.4 Priority Issues.........................................................................................................................7
2. School Detail..................................................................................................................................8
3. Building Details............................................................................................................................10
3.1 Block 1.................................................................................................................................10
3.2 Block 2.................................................................................................................................13

3|Page
1. Summary
1.1 School Location, Site Condition and Local Implication

Figure: Location/site Plan (osm.org)

Figure: Location/Site plan (maps.google.com)

4|Page
Terrain and Topography:

The school lies in hilly region of Sindhupalchwok district. Although soil test was not
conducted, medium soil is estimated from adjacent cut areas.

The school lies on mountainous terrain. Blocks are constructed in flat area.

As per the preliminary assessment and field observation by the team Blocks 1 need to be
repaired and block 2 need to be retrofitted. One RCC block 3-C-22 is going to be constructed
under DRSP Project.

Accessibility:

The accessibility to school is quite difficult, with unsurfaced road to the gate. Vehicle
accesses in all seasons

The school is about 5 KM from Bharabise which is the nearest market of that locality.

Built up area and Emergency Exit:

There is sufficient open space inside the compound for assembly.

Public Property and Social Issues:

The school is running in its school own land. There are no facilities by trust.

Historical Value:

No existing structure was identified with historical values.

Cultural Implication:

No any traditional settlements has been observed in the locality.

Infrastructure Implication:

Electricity: Available
Internet: none
Because of accessible location, most infrastructure materials can be available.

CONCLUSION: Satisfactory to proceed for further intervention.

5|Page
1.2 School Condition
1.2.1 School Site Plan

Figure: Site plan from topography survey

1.2.2 Ongoing/Planned Construction

Being Demolished:
None.

Block to be constructed

One RCC Block 3-C-22 is going to be constructed under the DRSP Project.

Other Planned Intervention:


None.
1.2.3 Landslide Potential
None.

1.2.4 Flood Potential


Neither there is no river nearby, nor there chance of inundation. But good pitching of
open space is required for the easy access during monsoon season.

1.2.5 Other Site Hazards


None.

6|Page
1.3 Building Condition and Proposed Test
Based on the site assessment, following condition are observed. The most likely intervention and
appropriate tests to be carried out are also included. The more detailed explanation are presented in
the later sections for individual structure.

Buildin Structure No of Damage / Defects Most likely Proposed Test


g Type Stories Intervention* (at this stage)
1 RCC 3 No cracks , No intervention X
unaffected Recommended
2 RCC 2 Inappropriate Recommended for Schmidt
structural member, retrofitting of block Hammer,
cracks Rebar scanner
and USPV
* The more justifiable intervention will be identified in intermediate assessment report (next part of
the report) with more detailed structural assessment, cost implication and other affecting factors.

1.4 Priority Issues


Based on the site assessment and information available, following things shall be resolved at the
soonest for the smooth progress of the project:

 Approval of the proposed test


 Verify the land ownership of the school and decide if to carryon intervention or not.

7|Page
2. School Detail
1 GENERAL INFORMATION
1.1 District Sindhupalchowk
1.2 Name of School Shree Bhadrakali Secondary School
1.3 Contact Person Name and Phone No: Hira Bahadur sapkota /9851123974
1.4 School EMIS 230450007
2 GEOGRAPHICAL INFORMATION
2.1 Address (Street,City,District,Province,State) Barhabise-8, Sindhupalchwok
2.2 Locality Dadakhet
2.3 GPS Co-ordinate (Lat,Long) 27.805858, 85.876226

     

2.4 Climate Records of last 50 Years?      


     
     
2.5 Accessibility Earthen Road
Locate Within Urban Area? Name of Nearest
2.6 No Barhabise 5km
Main City or Market?
Is the school accessible for the children more
2.7 than one VDC/Municipality or more than 2 Yes  
wards?
2.8 Approximate distance from Motorable road 0m
2.9 Emergency Exit ? Open
3 DEMOGRAPHIC INFORMATION
3.1 No Of Students (Ficial Year 2076) 492
  No of Boys 209
  No of Girls 283
3.2 Number of Disable Students 0
  Boys  
  Girls  
Catchment area of student (nearby
3.3 villages/districts from where students come to Barhabise-1, 2, 3, 4
study)
3.4 No of Available Teachers (Staffs) 20
3.5 Education Level (Grades)  
  Lower Level (ECD Available?) Yes
  Higher Level 12
3.6 Commonly available building materials? Stone, mud
  Unavailable Materials? Reinforcement Aggregate Cement
  Approximate Distance for Transportation? Barhabise 5km  
  Mode of Transportation? Tractor Tripper
3.7 General terrain of surrounding area Slopy

8|Page
3.8 General topography of school compound Flat
3.9 No. of school building blocks 5
3.1 No. of Temporary Learning Centre (TLC 2
  If TLC (Number of Classes on TLC?)  
3.1
Ownership of school's land school own( 18.5 Ropani)
1
  (Include all applicable sources)  
Is there a safe location outside the buildings
3.1
where ALL staff and students can currently Yes
2
assemble in an emergency event?
Excluding safe assembly location, is there any
3.1
additional space for new Blocks on the Yes
3
school?
3.1
No. of individual functional toilet units for Girls WC = 2 Urinal = 0  
4
3.1
No. of individual functional toilet units for Boys WC = 1 Urinal = 0  
5
3.1 No. of individual functional toilet units for
WC = 2 Urinal = 0  
6 Staffs
3.1
Disable Friendly Toilet? No    
7
3.1 How many septic tanks are currently
3
8 present ?
  If yes, What is the condition? Good
If Condition is poor? What is the solution for
   
improvement?
3.1
What kind of water sources is/are available ? spring water
9
3.2 What kind of drainage systems are available ? None
3.2
Does school is connected with electricity ? Yes
1
3.2
Does the school have compound wall ? yes
2
3.2
If yes, what kind ? And its condition ?    
3
Is there proximity to unsafe structures, such
3.2
as, perimeter walls, water towers, trees, No
4
generator and potentially damaging debris?
4 AVAILABILITY OF PHYSICAL FACILITIES
Existing Required Remarks
  Particulars
(functional) (by school) (Proposal)
4.1 Classrooms 11 20  
4.2 Administration/ Office 2 3  
4.3 Library 0 2  
4.4 Laboratory 1 3  
4.5 Health facility/ Treatment room 0 1  
4.6 Counseling Room 0 1  
4.7 Canteen/ Kitchen 0 1  
4.8 Auditorium 0 1  
4.9 Toilet
5 10  
4.1
Principal Room
0 0 1  

9|Page
4.1
Staff Room
1 0 1  
4.1
Club Room
2 0 0  
4.1
Audio Visual Room
3 0 0  

3. Building Details
3.1 Block 1

  BLOCK-ID Block-1
1.0 Detail of Building
1.1 Year of Construction? Periodic Construction  
  Ground Floor 2067 BS 9 Years Old
  First Floor 2067 BS 7 Years Old
  Second Floor 2076 BS  
Partial beam
Year of last repair and 0 Years Jacketing and
1.2 2075 BS
its type Old Full Column
Jacketing
Building ground
1.3  
coverage (plinth area)
1.4 No. of Story GF+2Story
1.5 Structural typology RCC Frame Structure
1.6 Building purpose Ground Floor class-4 0  
Staffroom,
    First Floor computer lab class-1 Principal
room
    Second Floor Hall    
1.7 Number of Classrooms 5
1.7 Type of foundation Isolated Footing
Condition of
1.8 None
foundation
Brick Masonry in Cement
1.9 Wall material Ground Floor
Mortar
    Typical Thickness 230mm
1.1
Wall condition Cracks  
0
1.1
Type of Floor Ground Floor PCC/Punning
1
       
1.1
Condition of Floor Ground Floor Good
2
       
1.1
Type of Roof Steel Truss with CGI Sheet
3
10 | P a g e
1.1
Condition of Roof Good
4
after retrofit
1.1
Size of Column 300x300mm (450x450mm    
5
)
1.1
Condition of Column Good      
6
Partial
3000x300m retrofitting of
1.1
Size of Beam m Before beam    
7
retrofit (450x450mm
)
1.1
Condition of Beam Good. Recently retrofitted
8
Is there any relative
1.1
changes on mass on the No
9
floor ?
1.2 Condition of doors and
Frame Good  
0 windows?
    Panel Good  
1.2
Is there any cracks ? Yes
1
If yes, component
1.2 (locate crack on
Provided in Crack Maping
2 drawings with proper
ID)
1.2
Previous retrofit ? Yes, Partial beam jacketing and full column jacketing
3
2.0 Non Destructive Testing (NDT)
2.1 Requirement of NDT No
2.2 Types of NDT required No
3.0 Possible recommendation
3.1 Need minor repair ? Yes
3.2 Need major repair ? Need to discuss
3.3 Need retrofitting ? Need to discuss

11 | P a g e
12 | P a g e
3.2 Block 2
  BLOCK-ID Block-2
1.0 Detail of Building
1.1 Year of Construction? All Floor at a time  
  Ground Floor 2075 BS 1 Years Old
  First Floor 2075 BS 1 Years Old
       
Year of last repair and
1.2 None    
its type
Building ground
1.3  
coverage (plinth area)
1.4 No. of Story GF+1Story
1.5 Structural typology RCC Frame Structure
Ground
1.6 Building purpose class-3 0  
Floor
First
    Class-3 0  
Floor
           
1.7 Number of Classrooms 6
1.7 Type of foundation Isolated Footing
1.8 Condition of foundation None
1.9 Wall material Ground Floor Brick Masonry in Cement Mortar
    Typical Thickness 230mm
1.1
Wall condition None  
0
1.1
Type of Floor Ground Floor PCC/Punning
1
       
1.1
Condition of Floor Ground Floor Good
2
       
1.1
Type of Roof RCC
3
1.1
Condition of Roof Good
4
1.1
Size of Column 300x300
5
1.1
Condition of Column Good      
6
1.1
Size of Beam 230x300
7
1.1
Condition of Beam Good
8
Is there any relative
1.1
changes on mass on the No
9
floor ?
1.2 Condition of doors and
Frame Good  
0 windows?

13 | P a g e
    Panel Good  
1.2
Is there any cracks ? Yes
1
If yes, component
1.2 (locate crack on
Provided in Crack Maping
2 drawings with proper
ID)
1.2
Previous retrofit ? No
3
2.0 Non Destructive Testing (NDT)
2.1 Requirement of NDT No
2.2 Types of NDT required No
3.0 Possible recommendation
3.1 Need minor repair ? Yes
3.2 Need major repair ? Need to discuss
3.3 Need retrofitting ? Need to discuss

14 | P a g e
--------------- END OF THE DOCUMENT ---------------