PROJECT AND REPORT DESCRIPTION
Consultant: Design and Supervision Consultant (DSC) - M/S Umar Munshi Associates
in association with Sub-Consultants ERMC (P) Ltd, PACE Consultants (P)
Ltd and Progressive Research & Consulting Services
Lakhe Marg, New Baneshwor, Kathmandu, Nepal.
Phone: 01-5245144
2|Page
Contents
1. Summary........................................................................................................................................4
1.1 School Location, Site Condition and Local Implication...........................................................4
1.2 School Condition....................................................................................................................6
1.3 Building Condition and Proposed Test...................................................................................7
1.4 Priority Issues.........................................................................................................................7
2. School Detail..................................................................................................................................8
3. Building Details............................................................................................................................10
3.1 Block 1.................................................................................................................................10
3.2 Block 2.................................................................................................................................13
3|Page
1. Summary
1.1 School Location, Site Condition and Local Implication
4|Page
Terrain and Topography:
The school lies in hilly region of Sindhupalchwok district. Although soil test was not
conducted, medium soil is estimated from adjacent cut areas.
The school lies on mountainous terrain. Blocks are constructed in flat area.
As per the preliminary assessment and field observation by the team Blocks 1 need to be
repaired and block 2 need to be retrofitted. One RCC block 3-C-22 is going to be constructed
under DRSP Project.
Accessibility:
The accessibility to school is quite difficult, with unsurfaced road to the gate. Vehicle
accesses in all seasons
The school is about 5 KM from Bharabise which is the nearest market of that locality.
The school is running in its school own land. There are no facilities by trust.
Historical Value:
Cultural Implication:
Infrastructure Implication:
Electricity: Available
Internet: none
Because of accessible location, most infrastructure materials can be available.
5|Page
1.2 School Condition
1.2.1 School Site Plan
Being Demolished:
None.
Block to be constructed
One RCC Block 3-C-22 is going to be constructed under the DRSP Project.
6|Page
1.3 Building Condition and Proposed Test
Based on the site assessment, following condition are observed. The most likely intervention and
appropriate tests to be carried out are also included. The more detailed explanation are presented in
the later sections for individual structure.
7|Page
2. School Detail
1 GENERAL INFORMATION
1.1 District Sindhupalchowk
1.2 Name of School Shree Bhadrakali Secondary School
1.3 Contact Person Name and Phone No: Hira Bahadur sapkota /9851123974
1.4 School EMIS 230450007
2 GEOGRAPHICAL INFORMATION
2.1 Address (Street,City,District,Province,State) Barhabise-8, Sindhupalchwok
2.2 Locality Dadakhet
2.3 GPS Co-ordinate (Lat,Long) 27.805858, 85.876226
8|Page
3.8 General topography of school compound Flat
3.9 No. of school building blocks 5
3.1 No. of Temporary Learning Centre (TLC 2
If TLC (Number of Classes on TLC?)
3.1
Ownership of school's land school own( 18.5 Ropani)
1
(Include all applicable sources)
Is there a safe location outside the buildings
3.1
where ALL staff and students can currently Yes
2
assemble in an emergency event?
Excluding safe assembly location, is there any
3.1
additional space for new Blocks on the Yes
3
school?
3.1
No. of individual functional toilet units for Girls WC = 2 Urinal = 0
4
3.1
No. of individual functional toilet units for Boys WC = 1 Urinal = 0
5
3.1 No. of individual functional toilet units for
WC = 2 Urinal = 0
6 Staffs
3.1
Disable Friendly Toilet? No
7
3.1 How many septic tanks are currently
3
8 present ?
If yes, What is the condition? Good
If Condition is poor? What is the solution for
improvement?
3.1
What kind of water sources is/are available ? spring water
9
3.2 What kind of drainage systems are available ? None
3.2
Does school is connected with electricity ? Yes
1
3.2
Does the school have compound wall ? yes
2
3.2
If yes, what kind ? And its condition ?
3
Is there proximity to unsafe structures, such
3.2
as, perimeter walls, water towers, trees, No
4
generator and potentially damaging debris?
4 AVAILABILITY OF PHYSICAL FACILITIES
Existing Required Remarks
Particulars
(functional) (by school) (Proposal)
4.1 Classrooms 11 20
4.2 Administration/ Office 2 3
4.3 Library 0 2
4.4 Laboratory 1 3
4.5 Health facility/ Treatment room 0 1
4.6 Counseling Room 0 1
4.7 Canteen/ Kitchen 0 1
4.8 Auditorium 0 1
4.9 Toilet
5 10
4.1
Principal Room
0 0 1
9|Page
4.1
Staff Room
1 0 1
4.1
Club Room
2 0 0
4.1
Audio Visual Room
3 0 0
3. Building Details
3.1 Block 1
BLOCK-ID Block-1
1.0 Detail of Building
1.1 Year of Construction? Periodic Construction
Ground Floor 2067 BS 9 Years Old
First Floor 2067 BS 7 Years Old
Second Floor 2076 BS
Partial beam
Year of last repair and 0 Years Jacketing and
1.2 2075 BS
its type Old Full Column
Jacketing
Building ground
1.3
coverage (plinth area)
1.4 No. of Story GF+2Story
1.5 Structural typology RCC Frame Structure
1.6 Building purpose Ground Floor class-4 0
Staffroom,
First Floor computer lab class-1 Principal
room
Second Floor Hall
1.7 Number of Classrooms 5
1.7 Type of foundation Isolated Footing
Condition of
1.8 None
foundation
Brick Masonry in Cement
1.9 Wall material Ground Floor
Mortar
Typical Thickness 230mm
1.1
Wall condition Cracks
0
1.1
Type of Floor Ground Floor PCC/Punning
1
1.1
Condition of Floor Ground Floor Good
2
1.1
Type of Roof Steel Truss with CGI Sheet
3
10 | P a g e
1.1
Condition of Roof Good
4
after retrofit
1.1
Size of Column 300x300mm (450x450mm
5
)
1.1
Condition of Column Good
6
Partial
3000x300m retrofitting of
1.1
Size of Beam m Before beam
7
retrofit (450x450mm
)
1.1
Condition of Beam Good. Recently retrofitted
8
Is there any relative
1.1
changes on mass on the No
9
floor ?
1.2 Condition of doors and
Frame Good
0 windows?
Panel Good
1.2
Is there any cracks ? Yes
1
If yes, component
1.2 (locate crack on
Provided in Crack Maping
2 drawings with proper
ID)
1.2
Previous retrofit ? Yes, Partial beam jacketing and full column jacketing
3
2.0 Non Destructive Testing (NDT)
2.1 Requirement of NDT No
2.2 Types of NDT required No
3.0 Possible recommendation
3.1 Need minor repair ? Yes
3.2 Need major repair ? Need to discuss
3.3 Need retrofitting ? Need to discuss
11 | P a g e
12 | P a g e
3.2 Block 2
BLOCK-ID Block-2
1.0 Detail of Building
1.1 Year of Construction? All Floor at a time
Ground Floor 2075 BS 1 Years Old
First Floor 2075 BS 1 Years Old
Year of last repair and
1.2 None
its type
Building ground
1.3
coverage (plinth area)
1.4 No. of Story GF+1Story
1.5 Structural typology RCC Frame Structure
Ground
1.6 Building purpose class-3 0
Floor
First
Class-3 0
Floor
1.7 Number of Classrooms 6
1.7 Type of foundation Isolated Footing
1.8 Condition of foundation None
1.9 Wall material Ground Floor Brick Masonry in Cement Mortar
Typical Thickness 230mm
1.1
Wall condition None
0
1.1
Type of Floor Ground Floor PCC/Punning
1
1.1
Condition of Floor Ground Floor Good
2
1.1
Type of Roof RCC
3
1.1
Condition of Roof Good
4
1.1
Size of Column 300x300
5
1.1
Condition of Column Good
6
1.1
Size of Beam 230x300
7
1.1
Condition of Beam Good
8
Is there any relative
1.1
changes on mass on the No
9
floor ?
1.2 Condition of doors and
Frame Good
0 windows?
13 | P a g e
Panel Good
1.2
Is there any cracks ? Yes
1
If yes, component
1.2 (locate crack on
Provided in Crack Maping
2 drawings with proper
ID)
1.2
Previous retrofit ? No
3
2.0 Non Destructive Testing (NDT)
2.1 Requirement of NDT No
2.2 Types of NDT required No
3.0 Possible recommendation
3.1 Need minor repair ? Yes
3.2 Need major repair ? Need to discuss
3.3 Need retrofitting ? Need to discuss
14 | P a g e
--------------- END OF THE DOCUMENT ---------------