Explain the curve of shear stress-shear rate, how these curves plotted? (5 Marks)
--------------------------------------------------------------------------------------------------------------
Continued
Page 1 of 2
Q4] Calculate pressure for the following cases (formation depth is 2400m) and
∗ Case-1: Mud losses happen while circulation mud to clean the hole (mud density=
11ppg). Dry pipe was POOH 300m B.S.
∗ Case-2: Well flow happen while mud density was (8.9ppg), driller shut-off the well
SIDPP was 500psi. (5 Marks)
--------------------------------------------------------------------------------------------------------------
Q5] What are the main components (Chemicals) of drilling fluids? Compared
--------------------------------------------------------------------------------------------------------------
Given:-
(1bbl = 42gal, 1L = 61.024in3, 1m3 = 264.2gal, 1L = 0.2641gal, 1m = 3.28ft)
¤ ¤ Good Luck ¤ ¤