RSA A4 PR WI 02 (Metalizing) Rev 0
RSA A4 PR WI 02 (Metalizing) Rev 0
4 METALIZING
Area Description Documents
Equipment is weared.
ATTENTION:Than the steel temperature and relatie humidity must meet the customer specification.
4
*Check the procedure
Prepare for the proceed of
metalized * Check if something does not allow to start the process.
7
*Blow and sweep
Clean
8
* Apply zinc in the holes .
Zinc holes
* If necesary switch on the heaters to get a proper conditions for sending the section at the spray booth.
10
Inspect the section following the control sheet
Inspection of Metalized
Revision:
Date:
Page:
allized Machine
Time:
= ADVICE Diagrams/Photos
1
midity must meet the customer specification.
3
4
5
tions for sending the section at the spray booth.
6
ters,Metmachine,