WORK OPERATION SEQUENCE

4 PAINTING
Area Description Documents ControlSAPDrawingsroutesheetscheckshee

No. Operation = SAFETY = QUALITY = ADVICE

1 Ensure all Protective Use PPE´s during all process

Equipment is worn

2 Saction of work Identify the section of work.

When the section is inside the booth:

* Take the control sheeand register:

- Environmetal temperature

3 Climate Control - Dew point

- Steel temperature

- Relative Humidity

ATTENTION:Than the steel temperature and relatie humidity must meet the customer specification.

Preparation Process for With the control sheet check the procedure that needs to be applied.

4
Check environmental conditions that will affect application

Painting Check if there are any factor that prevents further treatment/application

Turn on fresh air supply and extraction.


Air blow section clean before application.

5 Cleaning section Scraping 100% of section using scraper,sanding flanges and areas who needed between layers to ensure

surface is properly prepared for the next layer.

Finally air blow section.

Dust test required if applicable as this differs from Client to Client so only if required.

6 Plugging and Covering of Please ensure threaded areas of weldable internals are plugged

areas

7 Application of Sealing Aplicar una capa de manto a la sección.

(if applicable)

8 Painting Paint application according to customer specifications.

This includes time designated for drying/curing

* Clean the area.

* Clean punps,spray guns and paintpipe/hoose.

* Clean the empty cans.

9 Cleaning * Deposit the wastes/leftovers in the propper bins.

* Call the supervisor for checking the Visual and DFT of the coat,and dry on the time specified on the

customer specification.

* Repeat this proceed for each coat.


10 Inpection of the coats * Register the values on the indicated data sheet

* Repeat this proceed for each coat.

11 Visual Inspection and DFT Do Visual inspection using flashlight.

of sections Check the section according to the DFT specified by the customer
Document No.:

Revision:

Date:

Page:

PPE'S
SAPDrawingsroutesheetschecksheets, PaintingGloves,boots, overallEyeProtectiveprotection,costume,,
Tools Safety
Spatula,Termometersmachine,Grinding

Tiempo:
Diagrams / Photos / etc.

tomer specification.

5
between layers to ensure

9 9

time specified on the


10