You are on page 1of 3

SAUDI ARAMCO 9000-ENG (10/03) 726-400 (ID/PID)

SATIP No. APPROVED DATE DISCIPLINE:


SAUDI ARAMCO TYPICAL INSPECTION PLAN
INTERNAL COATING OF PIPE SPOOLS AND INTERNAL FBE
SATIP-H-002-08 11-Apr-04 MECHANICAL-Coating
COATING OF FIELD GIRTH WELDS
PROJECT TITLE: WBS/BI/JO/NO. CONTRACTOR/SUBCONTRACTOR

CHECKLIST INSPECTION RESPONSIBILITY


ITEM and/or QUALITY ASSIGNMENTS
PROJECT PHASE TASK / ACTIVITY REMARKS
NO. TEST RECORD SAUDI
CNTRCTR
RECORD ARAMCO

1.0 DOCUMENT REVIEW

1.1 Internal Pipe Coating Procedure SAIC-H-2057 RH1 RH1


Internal Coating Shop/Contractor
1.2 Approval (if not previously approved by SAIC-H-2058 RH1 RH1
VID)

1.3 Coating Personnel Qualification SAIC-H-2010 RH1 RH1

Procedure for Internal FBE Coating of


1.4
Field Girth Welds
SAIC-H-2059 RH1 RH1

2.0 MATERIAL RECEIVING

Verification and Visual Inspection of pipe, S. Aramco shall inspect the first batch of delivered paints
2.1 fittings & coating materials (powder and SAIC-H-2060 H1 W2 and abrasives, after which random inspection will be
paints) conducted.
Storage and Handling of Paints and
2.2
Abrasives
SAIC-H-2025 H1 S

2.3 Equipment Inspection SAIC-H-2026 H1 H1

3.0 INSTALLATION

Refer to SATIP-W-011-01 or SATIP-W-012-01


3.1 Welding of pipe spools
whichever is applicable.
Inspection and verification of fabricated
3.2
piping or pipe spool
SAIC-H-2061 H1 W1 Also refer to SATIP-L-350-08

Refer to SATIP-A-004-02 (Note: Pressure testing may be


3.3 Pressure testing of piping or pipe spools conducted before or after internal coating subject to
physical properties of the coating material.)

Page 1 of 3
SAUDI ARAMCO 9000-ENG (10/03) 726-400 (ID/PID)
SATIP No. APPROVED DATE DISCIPLINE:
SAUDI ARAMCO TYPICAL INSPECTION PLAN
INTERNAL COATING OF PIPE SPOOLS AND INTERNAL FBE
SATIP-H-002-08 11-Apr-04 MECHANICAL-Coating
COATING OF FIELD GIRTH WELDS
PROJECT TITLE: WBS/BI/JO/NO. CONTRACTOR/SUBCONTRACTOR

CHECKLIST INSPECTION RESPONSIBILITY


ITEM and/or QUALITY ASSIGNMENTS
PROJECT PHASE TASK / ACTIVITY REMARKS
NO. TEST RECORD SAUDI
CNTRCTR
RECORD ARAMCO

Shop applied epoxy coating application


for the following:
a) FBE coating
Refer to Contractor's S. Aramco (VID) Approved ITP
3.4 b) Baked Phenolic or Baked Modified
for Shop Application.
Polyurethane
c) Epoxy Coating (APCS-2A/B/C/D,
APCS-3, APCS-10)
Inspection & Verification of Internal FBE SAIC-H-2062
3.5
Coating on Field Girth Welds SATR-H-2008
H1 H1
Repair of Internal FBE Coating on Field
3.6
Girth Welds
SAIC-H-2087 H1 H1

4.0 PRE-COMMISSIONING

Inspection of assembly/installation of
4.1
Internally coated pipe (re-instatement)
SATR-H-2008 H1 W1

GENERAL NOTES

The first three incidents of each Inspection or testing activity listed require 100 % participation by Saudi Aramco Site Inspection Personnel. After this period, Saudi Aramco Inspection may adjust
1
the levels of Saudi Aramco participation based upon the Contractor’s performance.
2 Surveillance: QA/QC organization to monitor work in progress without notice from Construction Organization
Witness: QA/QC organization shall be notified of the timing of Inspection or test in advance. However, the inspection or test shall be performed as scheduled if the QA/QC organization
3
representative is not present.
Hold: QA/QC organization shall be notified of the timing of inspection or test in advance. Inspection or test shall not be carried out without the QA/QC organization representative in
4
attendance.
5 If the Main Contractor delegates the assigned responsibility to the Subcontractor, then the Main Contractor will have the same degree of responsibility as assigned to Saudi Aramco.

LEGEND
W1 100% Witness Inspection/Test H2 Sample Hold Point for QC Inspection or Test RH1 100% Review and Approval of Documents
W2 Sample Witness Inspection/Test R1 100% Review of Documents RH2 Sample Review and Approval of Documents
H1 100% Hold Point for QC Inspection or Test R2 sample Review of Documents S Surveillance

Page 2 of 3
SAUDI ARAMCO 9000-ENG (10/03) 726-400 (ID/PID)
SATIP No. APPROVED DATE DISCIPLINE:
SAUDI ARAMCO TYPICAL INSPECTION PLAN
INTERNAL COATING OF PIPE SPOOLS AND INTERNAL FBE
SATIP-H-002-08 11-Apr-04 MECHANICAL-Coating
COATING OF FIELD GIRTH WELDS
PROJECT TITLE: WBS/BI/JO/NO. CONTRACTOR/SUBCONTRACTOR

CHECKLIST INSPECTION RESPONSIBILITY


ITEM and/or QUALITY ASSIGNMENTS
PROJECT PHASE TASK / ACTIVITY REMARKS
NO. TEST RECORD SAUDI
CNTRCTR
RECORD ARAMCO

Page 3 of 3