Professional Documents
Culture Documents
Name : Date:
I : Identification. Chose the correct concept being described in each number. (30 pts)
Subdivision Project 4. shall mean a tract or a parcel of land registered under Act No. 496 which is partitioned
primarily for residential purposes into individual lots with or without improvements thereon, and offered to the
public for sale, in cash or in installment terms.
Subdivision Lot 5. shall mean any of the lots, whether residential, commercial, industrial, or recreational, in a
subdivision project (PD 957).
Gridiron 8. subdivision scheme where the resulting blocks are more or less rectangular.
Relocation Survey 9. the measurement of the land to determine its external boundaries and ascertain whether or
not there are encroachments.
Subdivision Survey 10. a survey to determine the boundaries of each lot in the subdivision project.
Environmental Compliance Certificate11. a document issued by the DENR Secretary that the proposed project
will not cause a significant negative environmental impact.
Environmental Impact Assessment12. the process of predicting the likely environmental consequences of
implementing projects, and designing appropriate preventive, mitigating, and enhancement measure.
Environmental Impact Statement13. refers to document (s) of studies on the environmental effects of a project,
including the discussions on direct and indirect consequences on human welfare and ecological and
environmental integrity.
Comprehensive Land Use Plan 14. prescribes the developmental pace, directions and strategies for the optimum
use of land resources in a community as well as its role in provincial, regional and national development.
Environmental
Environmental Impact Comprehensive Environmental Impact
Compliance Certificate
Assessment ❌ Land Use Plan ❌ Statement ❌
❌
Subdivision Survey
Complex Subdivision ❌ Subdivision project ❌ Simple Subdivision ❌
❌
II : Analysis. Write the proper order of the general steps in subdivision development. (1 being the 1 st, - 7) (10pts)
2 Feasibility Study
7 Project Development
C. Put a check on the required facilities according to the number of saleable lots.
500-999 ✔️
1,000-1,499 ✔️
1,500-1,999 ✔️ ✔️ ✔️ ✔️
2,000-2,499 ✔️ ✔️ ✔️ ✔️ ✔️
2,500-above ✔️ ✔️ ✔️ ✔️ ✔️
Bonus: (5pts)
1. What is the minimum water supply requirement for any household? 150 liters per capita per day
2. What is the maximum number of row houses per block / cluster? 20 units