You are on page 1of 53

RABiTAH

Vendor Training Manual


Supplier LifeCycle (SLC)
Management

Building a Bridge for Tomorrow …


Course Overview

This course introduces you to the RABiTAH –


Supplier Relationship Management Processes

Target Audience
This Course is intended for
Vendors

Prerequisites:
Supplier Registration process in JSRS
Basic knowledge and experience in PDO
Qualification Process

Building a Bridge for Tomorrow …


Course Outline

Supplier Registration
Supplier Qualification- Sell Side
ABC Due Diligence
Technical Qualification
Supplier Master data management - Sell side

Building a Bridge for Tomorrow … 3


Supplier Registration
Vendor

Steps :
• Unregistered/Interested supplier will click on the “Supplier Self-Registration” link
provided on PDO website
• Supplier should be already registered with JSRS before registering in PDO
• Below Supplier Self registration Form will open up .
• Supplier will fill in the required data in “Supplier Self-Registration” form
• Make sure to enter your actual email address in the Company and contact email fields
• System will throw an error if any of the mandatory fields are not field
• In JSRS Number field , enter the JSRS registration number

Building a Bridge for Tomorrow … 4


Supplier Registration
Vendor
Steps :
1. Fill in the contact details of the person from your company who would be point of
contact for all documents
2. In Step 3 , you would mention the products and service that you would provide PDO .
3. Click on ADD button to add the product/service categories . Once you click on ADD a
new pop up window with all the PDO specific product categories will be displayed.

Click on ADD button to mention which all


product/services you would be interested in
providing . Once you click on Add button , a
new pop up window will open with all PDO
approved vendor material and service codes

If you already know the


category description or code
you can use this option to
find it

Use the checkbox to select the


categories that you want to add or
supply . If you select the Parent
categories , all the child categories will
be added automatically . You can also
select individual categories

Click OK to add the selected


categories

26/10/2016 Building a Bridge for Tomorrow … 5


Supplier Registration
Vendor
Steps :
1. Once you select the products categories and click OK as mentioned in previous slide ,
categories will be added as shown below . You can delete the categories at any point
2. Once you fill in all the details , you need to select the two checkboxes mentioned in
step 2 . Send button will be only activated after you select the checkboxes
3. Click Send once done

You can delete categories


which you don't want to
supply using the delete button

Once all the data is field , you


need to accept the Terms and
Conditions . Send Button will be
only activated if you select both
the checkboxes

If you miss out any of the


mandatory fields system will
throw an error as shown . Fill in
the details and click send again

26/10/2016 Building a Bridge for Tomorrow … 6


Supplier Registration
Vendor
Steps :
1. System would show you below message , that means your form is submitted successfully.
2. System will also send you 2 emails one with your User ID and another with your initial
password .
3. Using the User ID , you would be able to login to PDO supplier portal and collaborate on
all the documents . So kindly remember the User ID and keep it safe .
4. Click on the URL to navigate to PDO supplier portal .

Your User ID

Click on the link to navigate to PDO


supplier portal . You would be asked to
change the password for the first time .
Password would be sent in a different
email

26/10/2016 Building a Bridge for Tomorrow … 7


Supplier Registration
Vendor
Steps :
1. On the logon page copy paste the User ID and password that you got from PDO
registration system .
2. System will ask you to change the initial password.
3. Once you click change button , system will take you to your portal screen . Check your
name as shown in the PIC 3 .
4. Verify you see the screen as shown in PIC 3 .
5. Supplier can now maintain there own data or add change data (Covered later).
Collaborate on various documents . (Covered in later chapters)

Copy User ID and


password from the
email and paste it

26/10/2016 Building a Bridge for Tomorrow … 8


Supplier Qualification-ABC Due
Diligence
Vendor

Steps :
• PDO vendor management team will regularly send out Qualification forms to
you/suppliers.
• You would receive an email about the forms . You can access all your forms from below
mentioned area in your portal .
1. Click on Qualification Expert
2. Click on Qualification on left hand side pane
3. Click on NEW to see all newly sent forms .
4. Click on the Form name to open the form .

26/10/2016 Building a Bridge for Tomorrow … 9


Supplier Qualification-ABC Due
Diligence
Vendor

Steps :
• Fill in the form

26/10/2016 Building a Bridge for Tomorrow … 10


Supplier Qualification-ABC Due
Diligence
Vendor
Steps :
• Fill in the form as shown below

26/10/2016 Building a Bridge for Tomorrow … 11


Supplier Qualification-ABC Due
Diligence
Vendor

Steps :
• Fill in the form as shown below

26/10/2016 Building a Bridge for Tomorrow … 12


Supplier Qualification-ABC Due
Diligence
Vendor

Steps :
• In case PDO requires more clarification on some question that you responded earlier ,
you would receive the same form . You need to edit it and put in more clarification
wherever required .

Click here

post onsite audit

26/10/2016 Building a Bridge for Tomorrow … 13


Technical Qualification-Approval

Due Tech Performance Vendor


Diligence Qualification Promotion
Management

Steps :
• Similar to Vendor Due Diligence; technical qualification requests can be received by
vendor from PDO
• Once the final approval post onsite audit is done by PDO, vendors will receive a
notification
• Vendors can check which all PDO categories they are approved for .
• Login as vendor:
1. Click on Master data manager
2. Click on Company Data
3. On right hand side you will find Approved PDO categories (need to scroll Down)

26/10/2016 Building a Bridge for Tomorrow … 14


Vendor Self-Service -
Data Maintenance
Vendor
Steps :
• Vendors can maintain their own data using their vendor portal .
• Vendors can
• Add additional attachments
• Add company logo
• Change/add bank accounts
• Change own data ,like email id , phone no .
• Create additional employee User IDs
• Changes to company and bank data will go for PDO’s approval

For adding additional


attachments like vendor
catalog , new equipment
designs.

Currently there is no approval for


Vendor added attachments . So the
status will automatically update once
you refresh the screen

26/10/2016 Building a Bridge for Tomorrow … 15


Vendor Self-Service -
Data Maintenance
Vendor

Steps :
• Vendors can change the company data by following below steps

Company Logo can be only


uploaded/updated in display
mode . So if you want to add
company logo , do not click Edit

Changes like Bank account


change/addition will trigger a
workflow to vendor management
team , who will approve the changes .
If rejected , changes will be reverted
back to original.
Click Save once your
done with changes

26/10/2016 Building a Bridge for Tomorrow … 16


Vendor Self-Service -
Data Maintenance
Vendor

Steps :
• Vendors manage their certificates here

Click here to add certificates

Mandatory certificate that is


not yet uploaded by vendor .

26/10/2016 Building a Bridge for Tomorrow … 17


Vendor Self-Service -
Data Maintenance
Vendor

Steps :
• Vendors can create additional employees and there user IDs from below menu option.

There is no approval for


employee creation .
Additional employees will be
automatically accepted .
Maximum of 5 employees
can be created .

26/10/2016 Building a Bridge for Tomorrow … 18


Vendor Self-Service -
Data Maintenance
Vendor
Steps :
• Once additional employee/contact person is created , User IDs can be created for them.
• Newly created Employee will be visible in Find User menu .
• Role assignment can be done during this User ID creation step .

Click here to
open the
contact person .

User ID will be
automatically generated
and cannot be edited

Password

Roles the user will perform


. Check the relevant roles.

26/10/2016 Building a Bridge for Tomorrow … 19


Add/Renew Product
Registration
Vendor
Steps :
• For already registered vendors who want to register new product categories , you need
to fill the new product registration excel sheet and attach it in attachment area .

Click here to
Download the
excel template

Fill the template


and upload it in
attachment

26/10/2016 Building a Bridge for Tomorrow … 20


Questions?

Building a Bridge for Tomorrow …


RABiTAH
Vendor Training Manual
Operational Procurement

22
Building a Bridge for Tomorrow …
Scope of RABiTAH

RABiTAH will lead to integration of all procurement


activities into one SAP SRM platform

OPERATIONAL SOURCING STRATEGIC SOURCING AND


CLM
Replacing: IX2 (OTN)
Replacing: Omnicom,
SCOPE: PPT
RFQ Process
Publish/Evaluation/Award SCOPE:
PO Creation Tendering
Contracts

SUPPLIER LIFE CYCLE (SLC) SUPPLIER SELF SERVICE


Replacing: Omnicom (SUS)

SCOPE: Replacing: IX2 (OTN)


On-boarding # SCOPE:
Qualification PO Management
Classification Invoice Management
Evaluation
Phase Out # Registration will continue in JSRS

Building a Bridge for Tomorrow …


Sourcing Terminology

RFX – Request for Quotation(RFQ), Request for


Proposal(RFP), Request for Information(RFI)
Bid Invitations – Enquiry, Tender (Same as RFx)
RFX Response – Bid submission, Quote
Submission Deadline – Deadline date for bidders to
submit their bids, after submission deadline no more
electronic submission of RFx Responses.
Opening Date and Time – Date and time that Bids can
be opened by Buyers
Bidders – Vendors invited to an RFX
Two Envelope Bidding – Vendors submit RFX
responses in two parts i.e. Technical and Commercial
Binding Period – Bid validity End Date (Set by PDO, not
the Vendor) The date until the quote from the vendors
is expected to be valid

Building a Bridge for Tomorrow …


RFX Process
BUYER SELLER
Create RFX and Send Bid Receive e-mail
invitation notification

View how many vendors Accept /Reject the


responded invitation to Bid

Create Bid Response

Receive Bid Responses Send Response before


Submission deadline

Open Bids when due

Evaluate Bids

Accept Bid and Award

Approve the Award

Create Follow-On Doc. Receive PO in SUS Collab.

Building a Bridge for Tomorrow …


RFX – Notification
Vendor
When PDO publishes RFX it generates an individual email to each invited Vendor (Bidder). The email
address used is taken from the details of the contact person of that Vendor.

The text of the email body is currently under


review and will change before Go-Live

Publishing an RFX generates an email to each


invited Vendor. This email will contain the
Tendering Texts (Header and Item).

The hyperlink will bring the Vendor to


the SUS (Vendor Portal) Login page.

The hyperlink from the email will open the logon


screen for the Vendor.

Building a Bridge for Tomorrow …


Bids (Quotes)
Vendor
The bidders get an e-mail notification of the bid
invitation
The invitation can be accessed by bidders through the
e-mail using hyperlink provided or can log on to the SRM
portal and respond.

The Vendor can maintain the following details in his


RFX Response (Bid, Quote):
-Incoterm (mandatory)
-Terms of Payment
-Price (mandatory)
-Price per – Price Quantity (defaulted to 1)
-Vendor Product number
-Country of origin (mandatory)
-Manufacturer’s Name (mandatory)
-Delivery Days (defaulted to 0) (mandatory)
-Text (Bidder’s Remark) on Item and Header level
-Attachments on Item and Header Level

Building a Bridge for Tomorrow …


RFX Response Creation
Vendor
When a supplier logs in he will see the functionalities from SUS, SLC, SRM and CLM combined in one
ribbon at the top of his screen. Each functional area is accessible via one of the main pages.
RFX’s are available via the ‘RFX and Auction’ page.

On the ‘RFX and Auction’ page a POWL with


Highlighting the RFX will enable the buttons multiple queries allows the Vendor to search
like ‘Create Response’ and ‘Display Event’ for RFX’s with different status.

The Vendor can also click on the RFX


The RFX can be opened by Response number to access his RFX
clicking on the RFX number. Response directly.

Building a Bridge for Tomorrow …


RFX Response Creation
Vendor
After opening the RFX the Vendor can communicate his Intent to Participate in this RFX to PDO.
The Vendor can also create the RFX Response (Quote/Bid) from here by clicking the ‘Create Response’
button.
Steps:
1. Review RFX details
2. Indicate Intent to Participate
3. Create RFX Response

The RFX parameters show the Vendor


until when he has time to submit his
RFX Response.

1 The Vendor can review item


details as well as Notes and
Attachments on the RFX.

Building a Bridge for Tomorrow …


RFX Response Creation
Vendor
Steps:
1. Enter Incoterm
2. Go to ‘Items’ tab
3. Maintain Price, Delivery Days, Country of Origin and Manufacturer
4. Click the ‘Submit’ button

2 The Bidder can select a different


currency for his quote if PDO accepts 1
quotes in multiple currencies on this RFX

The RFX parameters show the Vendor


until when he has time to submit his
RFX Response.

The fields Country of Origin and


4 Manufacturer are critical for ICV tracking
and are mandatory on the RFX

The Country of Origin field requires


valid the SAP key for the country, e.g.
OM for Oman. A search help is available
to select the correct key.

Building a Bridge for Tomorrow …


RFX Change Notification
Vendor
When the PDO Buyer publishes a change to an RFX the SRM system sends out a notification email to
the Bidders, informing them about the change.

Building a Bridge for Tomorrow …


RFX Version Comparison
Vendor
Whenever a change to an RFX is published by PDO a new version of the RFX is saved in the system.
The Bidder can identify the differences between two versions by using the compare functionality for
RFX’s from the RFX Response.
In the example below the Submission Deadline was changed from 19.01.2016 17:00 to 20.01.2016
07:00

Building a Bridge for Tomorrow …


Questions and Answers

Can I change my Quote after I submitted it? – The Bidder


can change the quote until the Submission Deadline is
reached.
I would like to quote in a currency that is not avaiable in
the dropdown. What can I do? – Contact the PDO Buyer
and find out if they are will ed to add the missing
currency to the RFX.
How do I quote for only some of the items on the RFX? –
Just leave the price for the items that you do not want to
offer as zero.
What is the size limitation for an attachment? – 10 MB
per file.
Will I get a confirmation when my quote was accepted by
PDO? – The confirmation that your quote was accepted
will be the PO sent to you.
Can I offer an alternative item in my quote? –You could
use Notes and Attachment functionality for this purpose.
Can we have more than one user working on RFX’s – Yes
you can, please refer to SLC functionality for details of
managing users.
I cannot deliver any of the items requested . Do I still
need to submit a quote with zero prices?– No, but you
should use the Do Not Participate button to submit your
intent.

Building a Bridge for Tomorrow …


RABiTAH
Vendor Training Manual
Strategic Sourcing and CLM

Building a Bridge for Tomorrow … 34


SRM RFx Types

Initial Screening of bidders


Single Split Single Split Traditional
Prequalification Combined Single
Commercial Technical Sequential
•Clarifications for •Technical and •Technical and •Technical and •Stage 1 –
prequalification commercial commercial commercial Technical
to be submitted response response response response and
by bidders in the submitted submitted submitted evaluation
form of together; together; together; •Stage 2 –
questionnaires Technical and Commercial Technical Commercial
Commercial evaluation Evaluation response and
evaluation done followed by followed by the evaluation
in parallel. Technical Commercial
evaluation. evaluation.

Building a Bridge for Tomorrow … 35


Tender Process

Project Tender Contract


Management Process Management

Phases

RFx Contract
Vendor Award
Publishing Opening Creation
Creation Response

RFx setup both technical and commercial

Publishing the RFx

Vendor responses
activities
FTB

Opening and award

Building a Bridge for Tomorrow …


SRM RFx Types

Initial Screening of bidders


Single Split Single Split Traditional
Prequalification Combined Single
Commercial Technical Sequential
•Clarifications for •Technical and •Technical and •Technical and •Stage 1 –
prequalification commercial commercial commercial Technical
to be submitted response response response response and
by bidders in the submitted submitted submitted evaluation
form of together; together; together; •Stage 2 –
questionnaires Technical and Commercial Technical Commercial
Commercial evaluation Evaluation response and
evaluation done followed by followed by the evaluation
in parallel. Technical Commercial
evaluation. evaluation.

Building a Bridge for Tomorrow … 37


Initial Screening of Bidders

New Bidders –
PDO Bidders- Existing on SRM Not Existing on
SRM

Existi Temporary
ng No registration
SRM thru SLC#
users

Yes
Access
the bid
invitatio
n Register
to SRM
system
Publish tender on
public portal Answer
the
question
naire A

`
Recieve
Submit user id
respons and
e password
Answ
Evaluate er to
Reponse quest
s ionna
ire No Exit
from
process

Provide
Yes
access
to Access
tender tender
docume docume
nt nts

# Foreign compan
Building a Bridge for Tomorrow …
Pre-Qualification

PDO Bidders- Existing on SRM

Access to
bid
invitation

Access
tender
Publish bid documen
invitation ts

Answer
the pre-
question
naire

Upload
Recieve responses attachme
nts

Submit
response

Building a Bridge for Tomorrow …


Bid Submission

Contract Engineer Bidders- Existing on SRM

Yes Access the bid


invitation

Access tender
documents
Publish bid
invitation

Provide technical
response

Provide
Commercial
Response

Recieve responses

Submit response

Building a Bridge for Tomorrow …


Key Changes

 Decommissioning of Omnicom, IX2,


PPT
 Fully automated contract
management process (creation,
approval, negotiation and analysis)
 RFQ process to be done in SAP SRM
and not ECC/IX2 Systems
 Discontinuity of Fax of Award
 Internal and external collaboration
using system
 Integrated systems (SAP SRM and SAP
Mustaqbal)
 Workflows in SAP
 New SAP SRM System Security Roles

Building a Bridge for Tomorrow … 41


Business Benefits

 Single cohesive system to manage


the key C&P operations
 Time reduction between
awarding and contract creation
 Compliance enforcement
 Process visibility
 Standardized and formalized
purchasing organization
 Collaboration with suppliers
 Better visibility, monitoring and
workflow for all contract owners

Building a Bridge for Tomorrow … 42


Bidder view in SRM

If you have not created any


response for the RFx , this
column will be blank.
Click on any of the
RFx to view details of
the RFx

Building a Bridge for Tomorrow … 43


cFolder for Collaboration

Steps:
• If you are opening the Cfolder for the first time , you will get disclaimer that you need
to accept . Scroll down to find Accept button
• Also make sure you accept any java applet warning that comes up .

To access Tender related


documents click on
Technical Rfx to access
Cfolders.

Building a Bridge for Tomorrow … 44


Creating RFx
Response/Quotation
If it’s a public tender , you
need to first Register . Only
after you register you can
create a Response/Quote

First click on participate


button and then Click on
Create Response

New screen with Create RFx


response heading will open .
This is your Quotation

If there are any screening


questions which are
mandatory to answer , you
can find them here.

Building a Bridge for Tomorrow … 45


Answering Screening Questions

Building a Bridge for Tomorrow … 46


Creating RFx
Response/Quotation

Vendor
Steps:
• To submit any technical documents relating to the tender , vendor has to click on
Technical RFx response button to open Cfolder .
• Any point of time if you need any clarification on the tender you can use Questions
and Answers functionality or Cfolder Collaboration For any Bid clarification
you can use Chat
functionality with Buyer

Open cFolder and


provide Technical
Response Enter
Price

For any Bid Clarification


you can use
Collaboration Folder

Building a Bridge for Tomorrow … 47


Technical Response by Bidder

Click here to open Cfolder where


you will submit your technical
documents .

Your technical submission should


be inside Tech_Bid folder and not
in Collaboration or External folder .

Building a Bridge for Tomorrow … 48


Financial Response by Bidder

Steps:
• To submit your financial response , you need to attach your commercial sheet in
attachment area of the main RFx and not in CFOLDER .
• Once Commercial is attached you need to click on Submit button to submit your
response.

Building a Bridge for Tomorrow … 49


Contract Document Review

Click to Open
the agreement
All Active
Agreements

Building a Bridge for Tomorrow … 50


Contract Document Review

1
Click here to open
the contractual
document

Click here to
Download document
to local desktop

Building a Bridge for Tomorrow … 51


Contract Document Review

Use Check out to make


modification to
contractual document
(which you downloaded
to local machine)

Use Check in to
upload the modified
contractual
document

Building a Bridge for Tomorrow … 52


QUESTIONS

Building a Bridge for Tomorrow … 53

You might also like