Professional Documents
Culture Documents
1. Installation requirements
2. Unpacking
3. Removal and installation
4. Connections
5. Start up and adjustment
6. Shut down
7. Software upgrade
Space Requirement:
1. Between right or left panel and the wall ≥ 100 cm
2. Between back panel and the wall ≥ 50 cm
3. Make sure there are enough space for you to put the
reagents bottle.
Power Requirement:
1. Voltage: A.C.100V-240V
2. Input power: ≤300 VA
3. Frequency: 50/60 Hz
4. Make sure the analyzer is properly grounded.
Packing tapes
Paper protective
corners
Clamp
Plastic
cable tie
Set IP of PC :10.0.0.1
Reagents, identified by
color when connecting
Waste
Install the
supporting board for
diluent.
Service engineer:
Name: service
Password: Se s700
Then click „OK‟ to go on.
Select work mode: click new, and choose “WB” “CBC+DIFF”, then click
“Save”.
Version: 1.1, Update Date: 2009-5-20
Start up and adjustment-Background test
1. Prepare particle: press “Dliuent”, and add diluent 3 times then add one
drop 7um particle.
2. Then select work mode: WB CBC+DIFF and use the prepared particle
to run as sample.
Version: 1.1, Update Date: 2009-5-20
Start up and adjustment-Particle test
FS SS
Four
screws