You are on page 1of 112

BC-5800 Liquid System

International service department, Mindray.,Co


Liquid System
Components
Counting Principle
Counting Sequence
Troubleshooting

International service department, Mindray.,Co


Components

International service department, Mindray.,Co


Components
Solenoid valve 22 3-way Mindray valves, 26 2-way
Mindray valves, 4 2-way ASCO valve,
Valve
1 SMC valve ( 2-way valve)
Pinch valve 3 small tube, 6 big tube
Check valve 6 CHV

Metering Pump Metering pump 1 0.32mL, 2 0.52mL, 2 1ml, 1 1.5ml,


1 2mL, 1 2.6mL
Shear valve , Syringe: 100uL, 2.5mL

Sampling Parts Sample probe, Pierce needle, Wipe block

RBC Pre-mixing bath, RBC/PLT bath


Pre-heat bath, WBC Reaction bath, Flow Cell bath, FCM filter
HGB bath
Chamber/Bath
3 Reagent chamber, 3 Waste chamber, Buffer chamber

International service department, Mindray.,Co


SV: Solenoid Valve

New

New New

International service department, Mindray.,Co


Application of Valves

New

International service department, Mindray.,Co


CHV: Check Valve

International service department, Mindray.,Co


Application of Valves

International service department, Mindray.,Co


SMC valve ( 2-way valve)

New

Note: Pay attention to the direction of tubing connection

International service department, Mindray.,Co


Application of Valves

New

International service department, Mindray.,Co


PV: Pinch Valve

International service department, Mindray.,Co


Application of Valves

International service department, Mindray.,Co


DP: Diaphragm pump/Metering Pump

1 metering pump + 1 GV=


1 motor + 1 syringe
New

International service department, Mindray.,Co


Application of Metering Pump
LEO(II)
Diff Bath

LEO(I)
Preheat 5

LBA
Preheat 7

International service department, Mindray.,Co


Application of Metering Pump
WC2-2 WC2-1

HGB Bath

Flow Cell

FCM

Diff & Baso

International service department, Mindray.,Co


Application of Metering Pump
SRV

DIL

DIL
New SRV

International service department, Mindray.,Co


Application of Metering Pump

SRV DIL

New

International service department, Mindray.,Co


Application of Metering Pump
DP1 DP2, 3 DP4 DP5,6 DP7 DP8

Specification 0.32mL 0.52mL 1.5mL 1mL 2mL 2.6mL

DIFF DIFF DIFF/BASO HGB HGB RBC


Usage
LEO(II) LEO(I) sample LH Diluent Diluent

BASO RBC
LBA Premixing

PS: DP2 & DP3, DP5 & DP6 are using different membrane inside, so could not
exchange the position with each other.

International service department, Mindray.,Co


Notice : when using metering pump
• Liquid port should be toward up in case of some air bubble remain
in the pump.

Liquid port

Gas port

International service department, Mindray.,Co


Sampling Parts

120ul Blood (WB)


Sample Probe
2.5ml Syringe SRV 120ul Dilution (PD)
Pierce Needle 180ul Blood (WB)

International service department, Mindray.,Co


Sample Probe

International service department, Mindray.,Co


Pierce Needle

Sample aspirate

internal needle clean (Gas


hole)

external needle clean Blow-dry

Sample aspirate Clean procedure (Sample hole & Gas hole)

International service department, Mindray.,Co


Syringe

Syringe

Syringe motor Syringe sensor

International service department, Mindray.,Co


FCM

Application of Syringe
Flow Cell

BASO&DIFF

International service department, Mindray.,Co


Application of Syringe

DIL

 Sample Aspiration
 SRV with Diluent Cleaning

International service department, Mindray.,Co


Shear Valve

International service department, Mindray.,Co


Shear Valve
• Assembly Chart

International service department, Mindray.,Co


Manufacture of SRV

• Materials: special alumina ceramic

• Advantage:
1. wearable, stability of chemical character, anti-rust,
good temperature character
2. dispensing fast

• Disadvantage: frangible, hard to machining

International service department, Mindray.,Co


Shear Valve Components
• Inside New

Sampling valve Rotary valve Rear fixed valve

International service department, Mindray.,Co


Shear Valve Components
• Difference
• BC5500 SRV, • BC5800 SRV,
DIFF&BASO distribution hole=1*20ul DIFF&BASO distribution hole=2*10ul
RBC distribution hole=8.3ul RBC distribution hole=6ul
One position fixing hole Two position fixing hole: UP & DOWN position

International service department, Mindray.,Co


Shear Valve Components
• Sketch Map

Sampling valve Rotary valve Rear fixed valve

International service department, Mindray.,Co


Function of SRV
• Use flow paths, take the certain length and section to get or
measure the sample
• Ration and shear the blood sample

International service department, Mindray.,Co


Function of SRV
SRV New
DP1

DP2
DP3
DP8
DP8 DP6
DP7

DP5

International service department, Mindray.,Co


Tubing Connection of SRV

International service department, Mindray.,Co


Work Principle of SRV (1)
Open-vial mode

• The handle on the


sampling valve is
turned to the upper
position. 2.5ml
syringe aspirates
sample into the
shear valve.

International service department, Mindray.,Co


Work Principle of SRV (2)
Open-vial mode

• The handle of the


sampling valve is turned
to the lower position.
The sampling valve
divides the sample into
4 segments and sends
them into different baths
for analysis.

International service department, Mindray.,Co


Work Principle of SRV (3)
Open-vial mode

• The handle of the


sampling valve is on
the lower position.
Certain amount of
primarily diluted
sample is aspirated
from the premix bath.

International service department, Mindray.,Co


Work Principle of SRV (4)
Open-vial mode

• The handle of the


sampling valve is
turned to the upper
position. Certain
amount of primarily
diluted RBC
sample is injected
into the RBC bath.

International service department, Mindray.,Co


Work Principle of SRV (1)
Autoloader/close tube mode

• The handle on the


sampling valve is
turned to the lower
position. 2.5ml
syringe aspirates
sample into the
shear valve.

International service department, Mindray.,Co


Work Principle of SRV (2)
Autoloader/close tube mode

• The handle of the


sampling valve is turned
to the upper position. The
sampling valve divides
the sample into 4
segments and sends
them into different baths
for analysis.

International service department, Mindray.,Co


Work Principle of SRV (3)
Autoloader/close tube mode

• The handle of the


sampling valve is on
the upper position.
Certain amount of
primarily diluted sample
is aspirated from the
premix bath.

International service department, Mindray.,Co


Work Principle of SRV (4)
Autoloader/close tube mode

• The handle of the


sampling valve is
turned to the lower
position. Certain
amount of primarily
diluted RBC sample is
injected into the RBC
bath.

International service department, Mindray.,Co


RBC Pre-mixing Bath & RBC/PLT Bath

International service department, Mindray.,Co


Application of RBC Pre-mixing Bath

RBC Sample In
First Dilution
Out

International service department, Mindray.,Co


Application of RBC/PLT Bath

-0.04Pa
vacuum

New

International service department, Mindray.,Co


Volumetric Metering
This analyzer uses a volumetric metering unit to control the count
cycle and to ensure that a precise volume of sample is analyzed.

International service department, Mindray.,Co


HGB Bath

International service department, Mindray.,Co


Application of HGB Bath

Lyse HGB sample from SRV

Bubble mixing

International service department, Mindray.,Co


Pre-heat Bath

International service department, Mindray.,Co


Pre-heat Bath

International service department, Mindray.,Co


Application of Pre-heat Bath

SRV-Diff
LEO(I)
LBA
DIL

International service department, Mindray.,Co


WBC Reaction Bath

International service department, Mindray.,Co


WBC Reaction Bath

International service department, Mindray.,Co


Application of WBC Reaction Bath
FCM

LEO1
LBA
LEO2

Flow Cell

WC1

International service department, Mindray.,Co


Flow Cell Bath

International service department, Mindray.,Co


Application of Flow Cell Bath

International service department, Mindray.,Co


Application of FCM filter
New

Function:
Filter impurity of FCM, protect flow
cell
Shelf life : 2 year
Attention:
In the installation, inlet port must be
upward

International service department, Mindray.,Co


Reagent, Waste and Buffer Chamber
DIL FCM

WC2

New

Buffer
Cleanse bath
r
WC1
WC3

International service department, Mindray.,Co


Reagent Chamber

International service department, Mindray.,Co


Waste and Buffer Chamber

International service department, Mindray.,Co


Application of DIL&FCM Chamber

Cleanser Container

DIL Container

Soak the liquid path Generate the sheath Sample dilute and cleaning
when shut down fluid in flow cell

International service department, Mindray.,Co


Application of WC1

WC3

Waste
Container

International service department, Mindray.,Co


Application of WC2
(ASCO Valve
Protection)

WC1

International service department, Mindray.,Co


Application of WC3

WC1

International service department, Mindray.,Co


FAQ1

• What are the 8 metering pumps used for?


• How can we maintain the liquid
components?
• Metering pump, Solenoid valve
• Shear valve
• DIFF/BASO bath, RBC bath, HGB bath
• Flow cell
• Reagent chamber

International service department, Mindray.,Co


FAQ2: How to Check…?

• Sample volume

• Metering pump

International service department, Mindray.,Co


FAQ3: How to Check…?

• Premix/RBC/HGB bath/DIL/FCM chamber

International service department, Mindray.,Co


Counting Principle

International service department, Mindray.,Co


Counting Principle

WBC channel

• First count Diff channel, get


Lym%, Mon%, Eos%, Neu%

• Then count Baso channel, get


WBC, Baso#, Baso%

• Then get
Lym#, Mon#, Eos#, Neu#

International service department, Mindray.,Co


Counting Principle
HGB channel
• Colorimetry

International service department, Mindray.,Co


Counting Principle
RBC/PLT channel
• Electrical Impedance Method

International service department, Mindray.,Co


Counting Sequence

International service department, Mindray.,Co


Counting Sequence
Flow Chart of Whole Blood Mode

New

International service department, Mindray.,Co


Counting Sequence
Flow Chart of Prediluted Mode

International service department, Mindray.,Co


Liquid Diagram

International service department, Mindray.,Co


0~11 seconds

International service department, Mindray.,Co


Aspirate sample, test HGB blank, clean & drain (0-11s)
International service department, Mindray.,Co
11~18 seconds

International service department, Mindray.,Co


Dispense sample & lyse, aspirate from pre-mix bath, clean & drain
RBC bath (11-18s) International service department, Mindray.,Co
18~23 seconds

International service department, Mindray.,Co


Dispense into RBC bath, prepare DIFF dilution & Sheath fluid,
HGB dilution stay still(18-23s) International service department, Mindray.,Co
23~34 seconds

International service department, Mindray.,Co


RBC/PLT, DIFF counting, clean pre-mix bath, diff bath, sample
probe & wipe block (23-34s) International service department, Mindray.,Co
34~39 seconds

International service department, Mindray.,Co


RBC/PLT, HGB counting, WBC channel cleaning (34-39s)
International service department, Mindray.,Co
39~45 seconds

International service department, Mindray.,Co


Prepare Baso& Sheath fluid, clean RBC/PLT, HGB bath, prefill pre-mix,
HGB bath; ready for next sample (39-45s) International service department, Mindray.,Co
45~49 seconds

 Clean the WBC counting module

International service department, Mindray.,Co


Clean RBC rear bath, prefill HGB, DIFF, BASO bath (45-49s)
International service department, Mindray.,Co
49~60 seconds

International service department, Mindray.,Co


Cleaning WBC channel, zap and prefill RBC bath, waste draining
(49-60s) International service department, Mindray.,Co
Maintenance Sequence

International service department, Mindray.,Co


Cleanser Cleaning
• Cleanser Prime :
Open SV13 and corresponding valves, prime cleanser by +70kPa
pressure.

• Cleanser Cleaning :
1.Open SV17, use diluent cleaning corresponding tubings by +70kPa
pressure.
2.Use Metering pump and syringe to clean counting tubing again.

International service department, Mindray.,Co


Cleanser Maintenance
International service department, Mindray.,Co
Probe Cleanser Cleaning
• It includes SRV, WBC bath, RBC bath, Flow Cell, HGB bath, Premix
bath, HGB bath maintenance.
• Aspiration:
Overall Maintenance: Open SV07, PV10, SV11, SV16 and SV10,
use DP4 aspirate 6ml (4 times) probe cleanser from Open-Vial
probe into WBC channel and flow cell.
SRV Maintenance: Use 2.5ml syringe to aspirate probe cleanser
into SRV.
• Dispensing:
Use 2.5ml syringe dispense probe cleanser into HGB, RBC, Pre-mix
bath.
• Cleaning: it is similar to cleanser cleaning.

International service department, Mindray.,Co


Probe Cleanser Maintenance
International service department, Mindray.,Co
Troubleshooting

International service department, Mindray.,Co


Abnormal PLT Background

• PLT: 10~40. It is caused by dirty diluent, SRV or tubing.


• Cleaning by background test, probe cleanser soaking and
disassemble cleaning.

International service department, Mindray.,Co


Abnormal PLT Background
• PLT: If there is interference, usually there will be a peak wave
between 0-10 FL.

International service department, Mindray.,Co


Abnormal PLT Background
• Check the shielding cover of RBC bath and the signal processing
board whether they are installed well.

• Check or decrease the RBC Gain. After that, you may recalibrate
RBC, PLT and MCV.

• Check there is leakage in the RBC rear bath.

• Check the isolation chamber under the RBC bath whether it is


dirty.

International service department, Mindray.,Co


RBC Bubble
RBC bath not enough diluent?
RBC rear bath leaking?
Anywhere leaking from rear bath to
WC3?
Tube connectors loose?
RBC reference count time setting?
Volumetric sensors work well?

International service department, Mindray.,Co


No WBC Result (about 0.00)
Leucopenia: BASO channel blocked

International service department, Mindray.,Co


No WBC Result (about 0.00)
• Check the reagent of LBA. Check the liquid parts adding LBA. Such
as metering pump DP3, gas valve GV72, liquid valve SV27 and
tubing from LBA container to SRV.

• Check the metal connectors of WBC reaction bath whether they are
blocked; Clean the SRV and the tubing between the SRV and WBC
reaction Bath.

• Check the pinch valve PV12 and gas valve GV50.

• Check the pressure 0.25MPa, 0.07MPa and -0.085MPa.

• Check the signal processing board.

International service department, Mindray.,Co


Flow cell blocked

International service department, Mindray.,Co


Flow cell inner-surface dirty

Facula before
SS PD

International service department, Mindray.,Co


Flow cell out-surface dirty

Direct light
blocker

Out-surface dirty
Facula before
SS PD

International service department, Mindray.,Co


Hemolysis insufficient
Lyse reagents, lyse dispense volume, temperature

International service department, Mindray.,Co


Lyse Resist (hemolysis insufficient)

Lyse resist & low LAS Gain

International service department, Mindray.,Co


Lyse Resist (hemolysis insufficient)

• Check the ambient temperature; it should be much more than 15


centigrade.
• Check the Gain.
• Check the temperature of WBC reaction bath and pre-mix bath.
• Check the lyse LEO(I) and LEO(II); maybe themselves.
• Check the tubing adding LEO(I) and LEO(II) and metal connectors
of WBC reaction bath;
• Clean the SRV and the tubing between the SRV and WBC reaction
Bath.
• Checking the metering pump DP1 and DP2 whether the dispensing
volume is enough. Also the gas valves (such as GV69, 71) and
liquid valves (such as SV25, SV26)
• Check the pressure 0.07MPa and -0.085MPa.

International service department, Mindray.,Co


HGB Error or HGB Results Abnormal

• Check and adjust HGB Gain to make sure the HGB blank voltage is
2.0-2.4V (2.28V recommended).
• Check the HGB bath whether it is dirty or there is leakage.
• Check the HGB unit whether it is loose or dirty.
• Check whether there is enough diluent dispensed into the HGB bath
when counting. If not, check GV73, and SV19.
• Check whether there is enough LH lyse dispensed into the HGB
bath when counting. If not, check GV70, and SV28.
• Observe the mixing to see if bubble is too big or none. If yes, check
GV65 and CV6.
• Check the pressure 0.07MPa and -0.085MPa.

International service department, Mindray.,Co


All the stars on the scattergrams
• Check the sheath fluid in the FCM chamber whether it is enough. If
not, perform “Prime > FCM cistern” in the “Service > Maintain”
screen.
• Check the corresponding liquid parts aspirating or dispensing the
diluent; such as SMC valve SV53, liquid valve GV80, tube kinkled or
leaked? Make sure no air going into FCM channel.
• Check the liquid parts dispensing the sheath fluid (diluent) into the
flow cell; such as SV3.

International service department, Mindray.,Co


Thanks!

You might also like