DESIGN AND DEVELOPMENT DOCUMENTATION

DELIVERABLE
Discipline TYPE Inputs to the Design
CODE - DESCRIPTION
D DR
1. Assay / thermodynamics properties.
Pipeline Design Basis x 2. Conceptual Information.
1. Assay / thermodynamics properties.
Heat and Mass Balance x 2. Conceptual Information.
1. Design Basis.
2. Conceptual Information.
Pipeline Hydraulic Calculation Report x 3. Topographic Survey
4. Preliminary Route
1. Design Basis.
2. PFD
Equipment List x 3. Datasheets
4. Process Description
P
1. Heat and Mass Balance
R Process Description x 2. PFD
O 3. Hydraulic Calculations
4. Design Basis
C Operation Philosophy x 1. Process Description
E 1. Heat and Mass Balance
Datasheets - Support x
S 2. PFD

S PFD - System Flow Diagram Pipeline x 1. Heat and Mass Balance

1. Hydraulic Calculations
2. PFD
P&ID-General Pipeline x 3. Conceptual Information
4. Design Basis
5. Equipment List

P&ID - MLV Typical Arrangement x 1. Process Description


1. P&ID General Pipeline
P&ID - Pig Trap x 2. Equipment List
3. Process Description
1. P&ID General Pipeline
P&ID - Metering System x 2. Equipment List
3. Process Description
1. P&ID General Pipeline
P&ID - Pressure Regulation Station x 2. Equipment List
3. Process Description
1. P&ID General Pipeline
P&ID - Batch Cutting System x 2. Equipment List
3. Process Description
P&ID - Legend and Symbols - Support x 1. Owner Standards

Design Basis x 1. Conceptual Information


1. Hydraulic Calculations
Specifications for pig receiving and
launching skids x 2. Conceptual Information
M 1. Hydraulic Calculations
Data Sheets for pig receiving and launching
x
E skids 2. Conceptual Information

C RQMs for pig launcher and receiver x 1. Specifications


2. Datasheet
H 1. Hydraulic Calculation
A Specification for pressure regulation system
x 2. PFD
package 3. P&ID Pressure Regulation System
N 4. Process Description
I 1. Hydraulic Calculation
2. PFD
C Specification for metering system package x 3. P&ID Metering System
A 4. Process Description

L 1. Hydraulic Calculation
2. PFD
Specification for batch cutting system x 3. P&ID Batch Cutting System
4. Process Description
Specification for supply of
launching/receiving craper trap x 1. Specification for pig receiving and launching

Design Basis x 1. Conceptual Information

1. Basis Design
2. Equipment Layout
3. Fedder Calculation
4. Grounding Calculation
Electrical Material Take Off - Support x 5. Lighting Calculation
6. Electrical power supply main route
7. Cable and conduit List
8. Equipment Tech. Spec. - General
9. Electrical Drawings - General

1. Design Basis
Feeder Calculation Report x 2. Equipment Layout
3. Electrical Power Supply Main Route
1. Design Basis
Lighting Calculation Report x 2. Equipment Layout (Mechanical and Civil)
1. Design Basis
Grounding System Calculation Report x 2. Resistivity Study
2. Equipment Layout
1. Design Basis
Cathodic Protection Calculation Report x 2. Resistivity Study
E 3. Preliminary Pipeline Route
L 1. Design Basis
2. Equipment List
E Load Analysis x 3. P&ID-General Pipeline
C 4. Instrumet Data Sheet
1. Basis Design
T Transformer-Rectifier Technical
Specification x 2. Cathodic Protection Calculation Report
R Anode Technical Specification x 1. Basis Design
2. Cathodic Protection Calculation Report
I 1. Basis Design
C Power Cables Technical Specification x 2. Feeder Calculation
3. Load Analysis
I 4. Cathodic Protection Calculation Report
T 1. Basis Design
Transformer Technical Specification x 2. Load Analysis
Y 3. Cathodic Protection Calculation Report
1. Basis Design
UPS Technical Specification x 2. Load Analysis
1. Basis Design
Distribution Panel Technical Specification x 2. Load Analysis
1. Basis Design
2. Equipment Layout
3. Fedder Calculation
Cable and Conduit List x 4. Grounding Calculation
5. Lighting Calculation
6. Electrical power supply main route

1. Basis Design
2. Equipment Layout
3. Fedder Calculation
4. Grounding Calculation
Bill of Quantities x 5. Lighting Calculation
6. Electrical power supply main route
7. Cable and conduit List
8. Equipment Tech. Spec. - General
9. Electrical Drawings - General

Single Line Diagram x 1. Basis Desgin


2. Load Analysis
x 1. Transformer Tech. Spec
2. UPS Tech. Spec
Equipment Layout
3. Distribution Panel Tech. Spec
4. Transformer-Rectifier Tech. Spec

Indoor and Outdoor Lighting x 1. Lighting Calculation


2. Equipment Layout
x 1. Equipment Layout
Electrical power supply main route 2. Feeder Calculation
2. Cable and Conduit List
x 1. Equipment Layout
Grounding System 2. Grounding Calculation
2. Cable and Conduit List
x 1. Process Description
Classification Area 2. Process Stream Thermodynamics properties
3. Preliminary Pipeline Route
1. Cathodic Protection Calculation Report
Cathodic Protection Equipment Layout x 2. Transformer-Rectifier Tech. Spec.
3. Anode Tech. Spec.

1. Conceptual Information
Topographic Survey and Geothecnical
Studies Contracting Specifications x 2. Scope of Work - General
1. Conceptual Information
Hydrological Studies Contracting
Specifications x 2. Scope of Work - General
1. Conceptual Information
Design Basis x 2. Scope of Work - General
1. Conceptual Information
Concrete Work - Descriptive Memory x 2. Scope of Work - General
1. Foundations drawings
2. Telemetry House Drawings
Material Take off - Support x 3. Steel Structures Drawings
4. Pipe Support - Plant and Details
1. Traps Tech. Spec.
2. Basis Design
Foundations for Traps Calculation Report x 3. Preliminary Equipment Layout
4. Soil Study
1. Pressure Regulation Skid Tech. Spec.
2. Basis Design
C
Foundations for Pressure Regulation
Calculation Report x 3. Preliminary Equipment Layout
4. Soil Study
I
1. Metering System Skid Tech. Spec.
V 2. Basis Design
Foundations for Metering Unit Calculation
x
I Report 3. Preliminary Equipment Layout
4. Soil Study
L 1. Batch Cutting System Skid Tech. Spec.
2. Basis Design
Foundations for Batch Cutting System
Calculation Report x 3. Preliminary Equipment Layout
4. Soil Study
1. Basis Design
Telemetry House - Preliminary Calculation
Report x 2. Soil Study
3. Preliminary Pipeline Route
1. Basis Design
Steel Structure - Preliminary Calculation
Report x 2. Soil Study
3. Preliminary Equipment Layout

1. Foundation Traps Areas. Plan and Section


2. Foundation Pressure Regulation Skid. Plan and
Section
Bill of Quantities - Concrete Works x 3. Foundation Metering Skid. Plan and Section
4. Foundation Batch Cutting Skid. Plan and Section
5. Telemetry House - Plan and Details
6. Pipe Support - Plant and Details

S Bill of Quantities - Steel Structures x 1. Steel Structures - Plan and Details


2. Telemetry House - Plan and Details
I
1. Foundation Traps Areas. Plan and Section
2. Foundation Pressure Regulation Skid. Plan and
A Section
3. Foundation Metering Skid. Plan and Section
H Bill of Quantities - Civil Works x 4. Foundation Batch Cutting Skid. Plan and Section
5. Telemetry House - Plan and Details
O 6. Steel Structures - Plan and Details
7. Pipe Support - Plant and Details

1. Equipment Layout
General Foundatons Plant x 2. Preliminary Pipeline Route
3. Topographic Survey
1. Topographic Survey
2. Equipment Layout
Foundations for Traps Areas. Plan and
Sections x 3. Preliminary Pipeline Route
4. Foundations for Traps Calculation Report
1. Topographic Survey
2. Equipment Layout
Foundations for Metering System. Plan and
Sections x 3. Preliminary Pipeline Route
4. Foundations for Metering System Calculation
Report
1. Topographic Survey
2. Equipment Layout
Foundations for Batch Cutting System. Plan
and Sections x 3. Preliminary Pipeline Route
4. Foundations for Batch Cutting System Calculation
Report
1. Topographic Survey
2. Equipment Layout
Foundations for Pressure Regulation
System. Plan and Sections x 3. Preliminary Pipeline Route
4. Foundations for Pressure Regulation Skid
Calculation Report
1. Topographic Survey
2. Equipment Layout
Telemetry House - Plant and Details x 3. Preliminary Pipeline Route
4. Foundations for Telemetry House Calculation
Report
1. Topographic Survey
2. Equipment Layout
Steel Structure - Plan and Details x 3. Preliminary Pipeline Route
4. Steel Structures Calculation Report
1. Topographic Survey
Pipe Support - Plant and Details x 2. Preliminary Pipeline Route
3. Stress Analysis Calculation Report

1. Conceptual Information
Design Basis x 2. Scope of Work - General
1. Basis Design
2. Preliminary Pipeline Route
I/O List RTU x 3. Instrument List MLV
4. P&ID MLV Typical Arrangement
1. Basis Design
2. P&ID MLV Typical Arrangement
Main Valves Data Sheets x 2. PFD
3. Preliminary Pipeline Route
1. Instrument Datasheet
2. Main Valves Datasheet
A Material Take off x 3. Typical MLV route drawing
U 4. Scada Architecture
5. DCS Architecture
T 1. HAZOP
O 2. LOPA
2. ASIL
M Cause and Effect Matrix x 3. SIS-ESD Philosophy
A 4. P&ID Pipeline
5. P&ID MLV Typical Arrangement
T Main Valves requisition and evaluation offer x 1. Main Valves Datasheets
I
Typical MLV route drawing x 1. Basis Design
O
N 1. Basis Design
2. PFD
3. P&ID Pipeline
Instrumet Data Sheet x 4. P&ID MLV Typical Arrangement
5. Preliminary Pipeline Route
6. Mechanical Equipment Layout
A 7. Field Instrument Spec.
N 1. Basis Design
D Field Instrument Specification x 2. P&ID Pipeline
3. P&ID MLV Typical Arrangement
4. Process Description
C 1. Basis Design
2. P&ID Pipeline
O 3. P&ID MLV Typical Arrangement
Instrument List MLV x
N 4. Process Description
5. Preliminary Pipeline Route
T 6. Typical MLV route drawing

R 1. Process Description
O 2. P&ID Pipeline
3. P&ID MLV Typical Arrangement
L Automation Philosophy x 4. P&ID Leak Detection
5. P&ID Pressure Regulation System
6. P&ID Metering System
7. P&ID Batch Cutting System
1. Basis Desgin
SCADA System Specification x 2. Automation Philosophy
3. SCADA Architecture

S
I

A
S 1. Basis Desgin
2. Automation Philosophy
I SCADA Architecture x 3. P&ID Pipeline
4. P&ID MLV Typical Arrangement
5. P&ID Leak Detection System
A 1. Basis Design
H RTU Control Panel Specification x
2. SCADA Architecture
3. P&ID Pipeline
O 4. P&ID MLV Typical Arrangement
5. Preliminary Pipeline Route

1. Basis Desgin
2. Automation Philosophy
3. DCS Architecture
DCS Control System Specification x 4. P&ID Pipeline
5. P&ID MLV Typical Arrangement
6. Preliminary Pipeline Route

1. Basis Desgin
2. Automation Philosophy
3. P&ID Pipeline
4. P&ID MLV Typical Arrangement
DCS Architecture x 5. P&ID Leak Detection
6. P&ID Pressure Regulation System
7. P&ID Metering System
8. P&ID Batch Cutting System
9. I/O Lists

1. P&ID Pipeline
2. P&ID MLV Typical Arrangement
3. P&ID Leak Detection
I/O List DCS System x 4. P&ID Pressure Regulation System
5. P&ID Metering System
6. P&ID Batch Cutting System

1. P&ID Pipeline
2. P&ID MLV Typical Arrangement
3. P&ID Leak Detection
4. P&ID Pressure Regulation System
Emergency Shutdown System (SIS-ESD)
Specification x 5. P&ID Metering System
6. P&ID Batch Cutting System
7. Hazop Study
8. LOPA Study
9. ASIL Study

1. Process Description
2. P&ID Pipeline
Specification for Batch Cutting System x 3. P&ID MLV Typical Arrangement
4. Hidalgo Terminal Operational Philosophy
5. Basis Design
1. Process Description
Specification for Metering System x 2. Hidalgo Terminal Operational Philosophy
3. Basis Design
1. Process Description
2. Basis Design
Specification for Leak Detection System x 3. P&ID Pipeline
4. P&ID MLV Typical Arrangement
1. Process Description
2. Hidalgo Terminal Operational Philosophy
Specification for Regulation System x 3. Basis Design
4. P&ID Pipeline
5. P&ID MLV Typical Arrangement

1. P&ID Pipeline
2. P&ID MLV Typical Arrangement
3. P&ID Leak Detection
I/O list for SCADA System x 4. P&ID Pressure Regulation System
5. P&ID Metering System
6. P&ID Batch Cutting System

S
M Pipeline Design Basis x 1. Conceptual Information
2. Scope of Work - General
I Pipeline List of Crossings x 1. Topographic Survey
E 1. Design Basis
Line pipe specification x
A 2. Hydraulic Calculations
1. Design Basis
HT Pipeline Wall Thickness Calculation Report x 2. PFD - Pipeline
O 1. Pipeline Material Specification
Pipeline Bill of Materials x 2. Long. Profiles / Layout Drawings
A 3. Special Items Spec.

Ú
T

A
1. Pipeline Material Specification
Pipeline Material Requisition x
L P
2. Long. Profiles / Layout Drawings
I Piping Material Specification x 1. Design Basis
2. Assay / Thermodynamics Properties
P 1. Design Basis
Ú E Piping Class Summary x 2. Assay / Thermodynamics Properties
L Painting specifications x 1. Design Basis

R I
2. Owners Specs. Or Standards

N Coating specifications x 1. Design Basis


2. Owners Specs. Or Standards
E 1. Design Basis
G Specification for stress analysis x 2. Owners Specs. Or Standards
S 1. Design Basis
2. Material Pipeline Specification
II Specification for piping special items x 3. Preliminary Pipeline Route
4. Preliminary Pipeline Stress Analysis

C
A
Specification for radiography/ultrasonic
inspection services x 1. Design Basis
2. Owners Specs. Or Standards
H Welding Specifications x 1. Design Basis
2. Owners Specs. Or Standards
A
O 1. Design Basis
Datasheet for Manual Sectioning Valve x 2. Material Pipeline Specification
3. Preliminary Pipeline Route
1. Design Basis
Speicification for Pipeline Hydrostatic
Testing x 2. Owners Specs. Or Standards
1. Sress Analysis Spec
Preliminary Stress Analysis x 2. Pipeline Key Plan
3. Pipeline Longitudinal Profiles and Layout
1. Topographic Survey
Pipeline Key Plan x 2. Pump Station Layout
3. TAR/TAD Layout
1. Topographic Survey
2. Pump Station Layout
Pipeline Longitudinal Profiles/Layout x 3. Booster Pumps Stations Layout
4. TAR/TAD Layout
5. Hydrologial Study
1. Topographic Survey
Pipeline Typical Crossing x 2. Pipeline Longitudinal Profile/Layout
1. Topographic Survey
Pipeline Contractor staging areas x 2. Pipeline Longitudinal Profile/Layout
1. Topographic Survey
Pipeline Vicinity map x 2. Pipeline Longitudinal Profile/Layout
1. Basis Design
Pipeline MLV typical layout x 2. Pipeline Material Spec.
DOCUMENTATION
Norm

Standard Control Document


Guide and Code

1 14 231 - TH - PR - DE - 001

1 14 231 - TH - PR - BL - 001

1 14 231 - TH - PR - DT - 001

1 14 231 - TH - PR - LD - 001

1 14 231 - TH - PR - DT - 002

1 14 231 - TH - PR - MO - 001

N/A

1 14 231 - TH - PR - 10 - 001

1 14 231 - TH - PR - 12 - 002

1 14 231 - TH - PR - 12 - 003

1 14 231 - TH - PR - 12 - 004

1 14 231 - TH - PR - 12 - 005

1 14 231 - TH - PR - 12 - 006

1 14 231 - TH - PR - 12 - 007

1 14 231 - TH - PR - 12 - 001

1 14 231 - TH - PK - DE - 001

1 14 231 - TH - PK - MC - 001

1 14 231 - TH - PK - 40 - 001

1 14 231 - TH - PK - MR - 001

1 14 231 - TH - PK - MC - 002

1 14 231 - TH - PK - MC - 003

1 14 231 - TH - PK - MC - 004
1 14 231 - TH - PK - SP - 001

1 14 231 - TH - EL - DE - 001

1 14 231 - TH - EL - 27 - 001

1 14 231 - TH - EL - DT - 001

1 14 231 - TH - EL - DT - 002

1 14 231 - TH - EL - DT - 003

1 14 231 - TH - EL - DT - 004

1 14 231 - TH - EL - DT - 005

1 14 231 - TH - EL - SP - 001

1 14 231 - TH - EL - SP - 002

1 14 231 - TH - EL - SP - 003

1 14 231 - TH - EL - SP - 004

1 14 231 - TH - EL - SP - 005

1 14 231 - TH - EL - SP - 006

1 14 231 - TH - EL - LD - 001

1 14 231 - TH - EL - 27 - 002

1 14 231 - TH - EL - 60 - 001

1 14 231 - TH - EL - 14 - 002

1 14 231 - TH - EL - 60 - 002

1 14 231 - TH - EL - 60 - 003

1 14 231 - TH - EL - 60 - 004
1 14 231 - TH - EL - 60 - 005

1 14 231 - TH - EL - 60 - 006

1 14 231 - TH - CV - SP - 001

1 14 231 - TH - CV - SP - 002

1 14 231 - TH - CV - DE - 001

1 14 231 - TH - CV - 52 - 001

1 14 231 - TH - CV - 27 - 001

1 14 231 - TH - ST - 53 - 001

1 14 231 - TH - ST - 53 - 002

1 14 231 - TH - ST - 53 - 003

1 14 231 - TH - ST - 53 - 004

1 14 231 - TH - ST - 53 - 005

1 14 231 - TH - ST - 53 - 006

1 14 231 - TH - CV - 27 - 002

1 14 231 - TH - CV - 27 - 003

1 14 231 - TH - CV - 27 - 004

1 14 231 - TH - ST - 14 - 001

1 14 231 - TH - ST - 15 - 001

1 14 231 - TH - ST - 15 - 002
1 14 231 - TH - ST - 15 - 003

1 14 231 - TH - ST - 15 - 004

1 14 231 - TH - ST - 15 - 005

1 14 231 - TH - ST - 15 - 006

1 14 231 - TH - ST - 59 - 001

1 14 231 - TH - IN - DE - 001

1 14 231 - TH - IN - LD - 001

1 14 231 - TH - IN - 40 - 001

1 14 231 - TH - IN - 27 - 001

1 14 231 - TH - IN - DT - 001

1 14 231 - TH - IN - MR - 001

1 14 231 - TH - IN - 14 - 001

1 14 231 - TH - IN - 40 - 002

1 14 231 - TH - IN - CR - 001

1 14 231 - TH - IN - LD - 002

1 14 231 - TH - IN - MO - 001

1 14 231 - TH - IN - CR - 002
1 14 231 - TH - IN - CR - 003

1 14 231 - TH - IN - CR - 004

1 14 231 - TH - IN - LD - 003

1 14 231 - TH - SF - SP - 001

Inside the package discipline


document

Inside the package discipline


document

1 14 231 - TH - IN - CR - 005

Inside the package discipline


document

1 14 231 - TH - IN - LD - 003

1 14 231 - TH - PP - DE - 001

1 14 231 - TH - PP - LD - 001

1 14 231 - TH - PP - 21 - 001

1 14 231 - TH - PP - DT - 001

1 14 231 - TH - PP - 27 - 001
1 14 231 - TH - PP - MR - 001

1 14 231 - TH - PP - 21 - 002

1 14 231 - TH - PP - 21 - 003

1 14 231 - TH - PP - SP - 001

1 14 231 - TH - PP - SP - 002

1 14 231 - TH - PP - SP - 003

1 14 231 - TH - PP - MS - 001

1 14 231 - TH - PP - SP - 004

1 14 231 - TH - PP - SP - 005

1 14 231 - TH - PP - 40 - 001

1 14 231 - TH - PP - SP - 006

1 14 231 - TH - PP - DT - 002

1 14 231 - TH - PP - 14 - 001

1 14 231 - TH - PP - 15 - 001

1 14 231 - TH - PP - 14 - 003

1 14 231 - TH - PP - 14 - 004

1 14 231 - TH - PP - 14 - 005

1 14 231 - TH - PP - 14 - 002
item Input List
1 Assay / thermodynamics properties.
2 Conceptual Information
3 Topographic Survey
4 Owner Spec. or Owner Standards
5 Resistivity Study
6 Soil Study
7 Hazop Study
8 ASIL Study
9 LOPA Study
10 Tuxpan Terminal Operational Philosophy
11 Hidalgo Terminal Operational Philosophy
12 Tuxpan Terminal Layout
13 Hidalgo Terminal Layout
14 Preliminary Pumps Station Layout
15 Preliminary Booster Station Layout
Remarks
Done, but there is not transmix properties in order to simulate it
Done.

This Analysis should be done during this project stage


Depends on Hazop Study
Depends on Hazop Study

You might also like