Professional Documents
Culture Documents
g Tower
Performance Assessment
PMI Revision 01 1
Cooling Tower Thermal Performance
Testing
Importance
po a ce oof Cooling
oo g Tower
o Performance
o
Monitoring
PMI Revision 01 2
CenPEEP
Importance of Cooling
3 Tower Performance
Monitoring
PMI Revision 01
Cooling
g Tower Thermal Performance
Testing
Parameters to be Measured
A
Approach
h
Range
T
Tower Capability
C bilit
PMI Revision 01 8
Cooling Tower Thermal Performance Testing
Where :
PMI Revision 01 10
CenPEEP
Causes for Performance Deterioration
11
y Fill clogging
PMI Revision 01
CenPEEP
Causes for Performance Deterioration
12
y Damage of fills.
y Chocking of nozzle.
nozzle
y Falling of nozzle.
y Damage of splash bars.
bars
y Algae formation on splash bars
y Damaged
g drift eliminators
y Unequal water flow in different cells.
y Recirculation of vapors.
y Poor air flow due to less blade angle.
PMI Revision 01
CenPEEP
Causes for Performance Deterioration
13
y Hot water distribution pipe damage
y Annular clearance between distribution pipe
and hot water channel
y Growth of trees/plants/bushes near cooling
tower
y Overflow of cold water basin.
y Improper quality
li off water
¾ Control of COC
¾ Control of Turbidity
y Rain/any other water entering in open
channel
PMI Revision 01
CenPEEP
Optimizing Cooling Tower Performance
14
y Maintaining proper L/G ratio
¾ Equal water distribution between the cells
¾ Visual inspection of pipes, nozzles, fills, etc., for
proper water distribution.
y Increasing the air flow
¾ By increasing blade angle to obtain max allowable
loading of fans
Ù By plugging all air path that do not pass through the fill
zone
i Sealing shaft hole of fan.
fan
ii Sealing door openings of fan chamber.
iii Sealing the fan hub area.
iv Maintaining blade tip clearances
v Reducing drift handled by fan
PMI Revision 01
CenPEEP
Optimizing Cooling Tower Performance
15
y Cleaning of fills with water jets
y Cleaning
l off ffills
ll manually
ll bby removing ffrom tower
y Cleaning of cold water basin during overhauls.
y Regular cleaning/checking of nozzles.
y Continuous Chlorination & Shock dozing to
maintain
i t i required
i d FRC
PMI Revision 01
PMI Revision 01 16
Coolingg Tower Thermal Performance
f Testingg
Location Of Inlet Wet Bulb Temperature for Station with Counter Flow Tower
L L
PMI Revision 01 17
Coolingg Tower Thermal Performance
f Testingg
Location Of Inlet Wet Bulb Temperature for Station with Cross Flow Tower
L L
PMI Revision 01 19
Cooling Tower Thermal Performance Testing
Grid setupp for
f Cold Water Temp.
p measurement
PMI Revision 01 20
Cooling Tower Thermal Performance Testing
Grid setup for Cold Water Temp. measurement of single cell
PMI Revision 01 21
Cooling Tower Thermal Performance Testing
Grid setup for Cold Water Temp. measurement of single cell
PMI Revision 01 22
CenPEEP
Grid Measurement for Cold Water Temperature for one Cell
23
Grid of 48 probes
PMI Revision 01
CT Performance Test
CWT 32 31 33
31.33 31 84
31.84 31 6
31.6
24
HWT 44 40.51 41.13 41.1
WBT 27 7
27.7 24 52
24.52 24 42
24.42 24 6
24.6
CW Flow 2222/40000 2520 2515 44188
Fan Power 47.81 45.65 43.84 44.17
(A
(Average)
)
Range 12 9.18 9.29 9.50
Approach 4.3 6.81 7.42 7.0
Effectiveness 73.62 57.4 55.59 57.58
(Actual)
Effectiveness 63.22 64.4 64.32
(EXP)
Capability
PMI Revision 01
100 87.13 80.04 85.07
CenPEEP
Cooling Tower Thermal Performance Testing
25
37.0
ATURE C 36.0
WATER
35.0
34.0
33.0
TEMPERA
COLD W
32 0
32.0
31.0
30.0
29.0
28.0
27.0
23.0 24.0 25.0 26.0 27.0 28.0 29.0 30.0 31.0 32.0 33.0
Wet Bulb (C)
PMI Revision 01
CenPEEP
Cooling Tower Thermal Performance Testing
26
37.0
ATURE C 36.0
WATER
35.0
34.0
33.0
TEMPERA
COLD W
32.0
31.0
30.0
29.0
28.0
23 0
23.0 24 0
24.0 25 0
25.0 26 0
26.0 27 0
27.0 28 0
28.0 29 0
29.0 30 0
30.0 31 0
31.0 32 0
32.0 33 0
33.0
Wet Bulb (C)
PMI Revision 01
CenPEEP
Cooling Tower Thermal Performance Testing
27
37.0
ATURE C 36.0
WATER
35.0
34.0
33.0
TEMPERA
COLD W
32.0
31.0
30.0
29.0
28.0
23 0
23.0 24 0
24.0 25 0
25.0 26 0
26.0 27 0
27.0 28 0
28.0 29 0
29.0 30 0
30.0 31 0
31.0 32 0
32.0 33 0
33.0
Wet Bulb (C)
PMI Revision 01
CenPEEP
Cooling Tower Thermal Performance Testing
28
RATURE C
37.0
WATER
36.0
35.0
34.0
COLD W 33.0
32.0
TEMPER
31 0
31.0
30.0
29.0
28.0
27.0
23.0 24.0 25.0 26.0 27.0 28.0 29.0 30.0 31.0 32.0 33.0
30.8
TURE (C)
30.6
WATER
30.4
30 2
30.2
TEMPERAT
COLD W
30.0
29.8
29.6
29.4
8.0 9.0 10.0 11.0 12.0 13.0 14.0
COOLING RANGE (C)
90% Flow
PMI Revision 01
CenPEEP
Cooling Tower Thermal Performance Testing
30
32.0
COLD WATER TEMPERATURE
31.5
31.0
(C)
30.5
30.0
29.5
29.0
C
30 8
30.8
URE (C)
30.6
ATER
30.4
EMPERATU
COLD WA
30.2
30.0
29 8
29.8
TE
29.6
80 85 90 95 100 105 110 115
Predicted Flow (%)
37.0
RE
MPERATUR
35.0
33.0
WATER TEM
(C)
31.0
29.0
COLD W
27.0
25.0
25,000 35,000 45,000 55,000 65,000 75,000 85,000
Predicted Flow (t/hr)
PMI Revision 01
ALGAE FORMATION
CenPEEP
34
PMI Revision 01
CenPEEP
ONLINE FILL CLEANING RIHAND
35
PMI Revision 01
CenPEEP
AIR PASSAGE THROUGH SHAFT OPENING
36
PMI Revision 01
CenPEEP
SEALING OF AIR PASSAGE THROUGH SHAFT
OPENING
37
PMI Revision 01
CenPEEP
SEALING FAN HUB AREA
38
PMI Revision 01
SEALING FAN HUB AREA
PMI Revision 01 39
Rain Water Entering Cold Water Basin
PMI Revision 01 40