You are on page 1of 4

Liquid Penetrant Inspection Test Report

Date Tested: Sept. 17, 2022 Report No.: PT-ITC-002

Project : Imperium Tower Crown


Location of Testing : Site
Test Description : Liquid Penetrant Inspection (Type-II, Method-C)
Sample Description : (See on the test result)
Sample Identification : (See on the test result)
Type of Material : Carbon Steel
Surface Condition : As welded
Surface Temperature : Ambient
Standard Test Method : ASTM E-165 -12 “Standard Test Method for Liquid Penetrant Examination
Acceptance Criteria : AWS D1.1/D1.1M Structural Welding Code
Dwell Time : 5 min
Developing Time : 10 min

EQUIPMENT & TESTING MATERIAL USED

Material Maker Model / Type


Cleaner Sherwin Dubl-Check DR-60
Penetrant Sherwin Dubl-Check DP-50
Developer Sherwin Dubl-Check D-100

TEST RESULT

Sample Description Findings Remarks


1. Segment – 14
Column No significant surface discontinuities Accepted
2. Segment – 12
Column No significant surface discontinuities Accepted
3. Segment – 8
Column No significant surface discontinuities Accepted
4. Segment – 2
Column No significant surface discontinuities Accepted
5. Segment – 1
Column No significant surface discontinuities Accepted
6. Segment – 21
Horizontal Brace No significant surface discontinuities Accepted
7. Segment – 20
Column No significant surface discontinuities Accepted
*See attached photos

Tested by: Marco Antonio Marasigan Noted by: Marivic Ochoa Diaz
Certified Welding Inspector QC Manager
Certification No. 2020-100334

TEST RESULT

Sample Description Findings Remarks


1. Segment – 21
Column No significant surface discontinuities Accepted
2 Segment – 70
Horizontal & Diagonal Brace No significant surface discontinuities Accepted
*See attached photos

Tested by: Marco Antonio Marasigan Noted by: Marivic Ochoa Diaz
Certified Welding Inspector QC Manager
Certification No. 2020-100334
Fig. 1. Segment 14 Column Fig. 2. Segment 12 Column

Fig. 3. Segment 8 Column Fig. 4. Segment 2 Column

Fig. 5. Segment 1 Column Fig. 6. Segment 21 Horizontal Brace


Fig. 7. Grid 20 Column Fig. 8. Grid 21 Column

Fig. 9. Segment 70 Horizontal & Diagonal Brace

You might also like