Re: Scheme No. RAO1-19: Electricity Supply to Waiqumu Settlement, Wairuku, Rakiraki.
Greetings from Enerey Fifi Limited (“EFL”)
| refer to the application dated 27 Movember 2018 for the supply of electricity to the following fifteen (15)
applicants at Waiqumu Settlement, Wairuku, Rakiraki.
41. Fitju 2. Muniratnam 3, Chandra 4, Hem Prakash
5. Suchana Devi 6. Hevayan Si 7. Prushs 8. Karuna Oupatan
9, Rainesh Prasad 10, Rajend Kumar 11, Kali Dass 12. Jay Prakash
13. Anish Kumar 14, Avinesh Ram 1, Ispa Lingam
Energy Fiji Limited wishes to advise that the power supply will be made available under the following terms
and conditions:
1.0 Cost of Capital Contribution
‘The capital contribution for Uhis scheme is $71,380.41 (VIP) and Energy Fiji Limited requires full payment 10
process the scheme further.
2.0 Formal Easement for Power-lines Extension Works
“The proposed route of the extension requires wayleave clearance and therefore the applicants will be required
to co-ordinate with our Wayleave Officers prior to the installation of our assets at the site.
3.0 Consumer Security Deposit & Meter Connection Fee for Supply Connection
Each applicant will be required to pav a consumer security deposit equal to two (2) months assessed
‘consumption charges and a meter connection fee before the electrical installation is connected to the supply
rid,
‘The above offer is valid for @ pevivd uf twelve (12) muutly front Une date of Uily Weiter, Energy FU Limited
reserves the right to review the quote should there be a change in the proposed design arising from
‘circumstances beyond its control.
Please contact us on telephone 665 6610 or mobile 999 9242 should you require any further information
relating to this scheme,
Qk
asmukh Patel
CHIEF EXECUTIVE OFFICER
‘Attachment 1; Preliminary Design with scope of work:
‘Attachment 2; Project Cost for the scheme RAOI~19
Energy Fiji Limited, Mead Office 2 Maslow Street Private Mell Bay Suva FIJI Islands T(079) 331 3333 F979) 331 1002