You are on page 1of 1
# 3 July, 2020 Our ref: LAB12-05 The Permanent Secretary for Infrastructure & Transport Ministry of Infrastructure and Transport Nasilivata House Samabula Suva Attention: Mr. Mikaele Belena Dear Sir, Ret Scheme LAB12-05: Electr yy Supply to Dramea, Draunivau & Nubuntkavula Village, Labasa. Greetings from Energy Fiji Limited (“EFL”. Kindly note that EFL has revised the quotation tor the supply of electricity to the following thirty eight (38) applicants at Dramea, Draunivau and Nubunikavula Villages, Labasa. 1. Anare Tunavau «9, Osea Bolenaitei_ 16. Tmoci Kalauvou 24, Joseva 31, Kameli Wainigolo 2. Asenaca 10. Veresa Colabana 17. Miriama Maya 25. Joell Saravaki 32, Like Laione 3, Sanalla Drecala 11, Hlomotama Talal 18. Losalini Manuleka_Z®, samisont 33, Jona Lege 4, Alipate Kevakina 12. Sakiusa Moliveitala 19. SociceviToa 27. Tevita Dakuna 34, Pita 5. Uniasi Matia +13, Solomne Maviri_ 20. Apisai Radravo 28, Osea Balenaitei_35, Malakai Tamani 6. Timoci Lakenisici. 14, Samuela Solomoni 21. Church 29. Lotu 36, Osea Tabuiga 7, Atunaisa Vunivalu 15. SainianaTinai 22. Dispensary 30, Alifereti Kivi 37, Samisoni Lagent 8, Timaci Vavumeke 23. Shins Pracad 38. Samu Waga Energy Fiji Limited wishes to advise that power supply will be made available under the following terms and conditions: 1.0 Lost of Capital Contribution The capital contribution for this scheme {s $408,237.55 (VIP) and EFL requires full payment to process the scheme further. 2.0 Formal Easement for Power-lines Extension Works The proposed route of the extension requires way - leave clearance and therefore the applicants will be ‘required co Co-ordinate with our way-leave ofricers prior to the installation ot our assets at the site, 3.0 nsumers’ Security Deposit & Meter Connection Fees for Supply Connections Each applicant will be required to pay a consumer sccurity deposit equal to two (2) months assessed consumption charges and connection fees before the electrical installation is connected to the supply snd. The above offer is valid for a period of twelve (12) months from the date of this letter. The Authority reserves the right to review the quote should there be a change in the proposed design arising from circumstances Beyond its control. Please contact us on telephone 6656434 should you require any further information relating to this scheme. “wh Hasmukh Patel. CHIEF EXECUTIVE OFFICER Enclosed: Attachment 1; Preliminary Design with scope of work Attachment 2; Project Cost for the scheme LAB12-05, Enerey fiji Limited. Head Office 2 Mailuw steel Private Mall Bay Suva Fy Islands 1(0/9) $51 $555 HO/9) $51 18B2

You might also like