INDUSTRIAL GASES STORAGE & SUPPLY SYSTEM 工业气瓶
INDUSTRIAL GASES STORAGE & SUPPLY SYSTEM 工业气瓶
OWNER’S ENGINEER
EPC CONTRACTOR
DESIGNER
PROJECT
AL DUR II IWPP
FOR APPROVAL
VALID FOR PURCHASE
FOR CONSTRUCTION 28/05/2019
AS BUILT
AL DUR II IWPP
OWNER EPC CONTRACTOR DOCUMENT NUMBER DATE
AD2-C1-00-QJ_-PSD-IDM-00633 28/05/2019
DOCUMENT NAME PAGE
CONTENTS:
1. AIM ................................................................................................................................ 3
2. GENERAL DESCRIPTION ............................................................................................ 4
2.1. MAIN FUNCTIONS ............................................................................................ 4
2.2. DESCRIPTION ................................................................................................... 4
3. INTERFACES ................................................................................................................ 7
3.1. GENERAL .......................................................................................................... 7
3.2. SUPPORT SYSTEMS ........................................................................................ 7
3.3. DEPENDENT SYSTEMS ................................................................................... 7
4. INSTRUMENTATION AND CONTROL ......................................................................... 9
4.1. INSTRUMENTATION ......................................................................................... 9
4.2. Control................................................................................................................ 9
5. REFERENCE DOCUMENTS ....................................................................................... 11
PROJECT DOCUMENT OWNER
AL DUR II IWPP
OWNER EPC CONTRACTOR DOCUMENT NUMBER DATE
AD2-C1-00-QJ_-PSD-IDM-00633 28/05/2019
DOCUMENT NAME PAGE
1. AIM
The main purpose of the present document is to provide a description of the Industrial
Gases Storage and Supply System for Al Dur II IWPP project, to be erected by
SEPCOIII for Haya Power & Desalination Company B.S.C. in Bahrein.
The document defines the purpose, characteristics, control and protection philosophy
for the above-mentioned system.
PROJECT DOCUMENT OWNER
AL DUR II IWPP
OWNER EPC CONTRACTOR DOCUMENT NUMBER DATE
AD2-C1-00-QJ_-PSD-IDM-00633 28/05/2019
DOCUMENT NAME PAGE
2. GENERAL DESCRIPTION
The main functions of the industrial gases system are to store, generate and supply
the industrial gases (hydrogen, argon and nitrogen) to the equipment who needs it for
a correct maintenance or operation; complying with their requirements in terms of
pressure, temperature and flow rate.
- Hydrogen (H2): Hydrogen is supplied to the gas turbine and steam turbine
generator for internal pressurization. During normal operation, hydrogen will be
supplied by the hydrogen generation plant. During initial filling and pressurization,
hydrogen should be supplied from high pressure cylinders.
- Argon (Ar): Argon is supplied to the GT and ST generators during filling and purge
to avoid contact between atmospheric air and hydrogen.
2.2. DESCRIPTION
2.2.1. General
Ar, H2 and N2 gases are used as industrial gases for plant industrial gas requirement.
The Ar gas system supply Ar gas for turbine generator air purging before hydrogen
filling during start-up / commissioning and for hydrogen removal during generator
maintenance.
Hydrogen is filled in the generator to remove the heat from the generator. The
hydrogen consumption is applicable in the following cases:
AL DUR II IWPP
OWNER EPC CONTRACTOR DOCUMENT NUMBER DATE
AD2-C1-00-QJ_-PSD-IDM-00633 28/05/2019
DOCUMENT NAME PAGE
The H2 system includes H2 supply skids for each generator for initial filling and
commissioning operations. This system is designed/supplied by turbine vendor, for
further details refer to GT/ST supplier (SIEMENS) documents.
For maintaining the H2 pressure during plant normal operation, a hydrogen generator
plant (electrolyser) will supply the required flow of hydrogen at needed pressure. This
plant has a configuration 2 x 100% and distributes hydrogen for the 6 generators of
the plant.
The Argon system includes Ar bottle rack, Ar evaporator and supply gas to H2 skid
which further lead to turbines generators during commissioning operation. This
system is designed/supplied by Turbines supplier, for further details refer to GT/ST
supplier (SIEMENS) documents.
The N2 system includes storage bottles & manifold to supply N2 gas to the fuel gas
system line/equipment purging and to HRSG steam side during maintenance and long
shutdown period for preservation. The gas manifold system consists of pressure
reducing station to reduce the bottled gas pressure to supply N2 gas at required
PROJECT DOCUMENT OWNER
AL DUR II IWPP
OWNER EPC CONTRACTOR DOCUMENT NUMBER DATE
AD2-C1-00-QJ_-PSD-IDM-00633 28/05/2019
DOCUMENT NAME PAGE
condition. The pressure reducing valve station downstream is provided with pressure
safety valve.
AL DUR II IWPP
OWNER EPC CONTRACTOR DOCUMENT NUMBER DATE
AD2-C1-00-QJ_-PSD-IDM-00633 28/05/2019
DOCUMENT NAME PAGE
3. INTERFACES
3.1. GENERAL
The interfaces of the industrial gases storage and supply system with other systems
or related equipment are described below. The interfaces are classified according to
those that are necessary for the operation of the system (support systems) or
according to those that are provided by the system and are necessary to allow other
systems to carry out their functions (dependent systems).
Mechanical systems:
Electrical Systems:
Control Systems:
Mechanical systems:
▪ Gas turbine generator, this system supplies Ar gas for purging and H2 gas for
cooling to GT generator
▪ Steam turbine generator, this system supplies Ar gas for purging and H2 gas for
cooling to ST generator
▪ HRSG, this system supplies N2 gas to HRSG steam side during maintenance or
during long shutdown period for preservation.
PROJECT DOCUMENT OWNER
AL DUR II IWPP
OWNER EPC CONTRACTOR DOCUMENT NUMBER DATE
AD2-C1-00-QJ_-PSD-IDM-00633 28/05/2019
DOCUMENT NAME PAGE
▪ Fuel Gas System. This system supplies N2 gas for purge and inertization of the
system.
PROJECT DOCUMENT OWNER
AL DUR II IWPP
OWNER EPC CONTRACTOR DOCUMENT NUMBER DATE
AD2-C1-00-QJ_-PSD-IDM-00633 28/05/2019
DOCUMENT NAME PAGE
4.1. INSTRUMENTATION
4.2. Control
In this section, descriptive narrative is provided for the control and protection of the
system. For details on the logics of this system, please refer to the following
document:
This system is in close relation with the H2 generation plant PLC, therefore some
signals are exchanged between this PLC and the DCS in order to operate in a
coordinated way. Details of this exchange are included in the logic diagram document
mentioned above.
This system includes few actuators as it is very simple in terms of control. It does not
include any control loop implemented in the DCS. Manifolds include self regulating
valves to provide constant pressure for the consumers connected in the distribution
systems. These valves will adjust depending on the demands.
PROJECT DOCUMENT OWNER
AL DUR II IWPP
OWNER EPC CONTRACTOR DOCUMENT NUMBER DATE
AD2-C1-00-QJ_-PSD-IDM-00633 28/05/2019
DOCUMENT NAME PAGE
4.2.1. H2 generators
One single H2 generators is sized to supply all GT/ST generators as per their
expected normal consumption.
In case of a problem with the H2 generator plant, pressure would reduce below the
predefined setting and H2 high pressure cylinders would work as backup. Operator
can decide to changeover to the other H2 generation plant.
PROJECT DOCUMENT OWNER
AL DUR II IWPP
OWNER EPC CONTRACTOR DOCUMENT NUMBER DATE
AD2-C1-00-QJ_-PSD-IDM-00633 28/05/2019
DOCUMENT NAME PAGE
5. REFERENCE DOCUMENTS