Tender

documents,
commercial
annexures etc

Santos’ Electrically Driven Compressor Scope of Work – includes HV


Motor Santos’ Electric Drive Infrastructure Scope of Work

• Supply summary; 1x100% centrif permeate and 1x100% centrif CO2


compressors, HV motor, ancillary items (lube oil, DGS if applicable, • Supply Summary; Variable Frequency Drives, Transformer
etc) • Optional pricing; Induction or Synchronous etc
• Verbal description of design cases, considerations for optimisation • Any optioneering required to be thought through during tender
• Optional pricing summary i.e “noise hood”, DGS vs CR, process
• Early engineering requirements • Early engineering required; Including electrical integration studies

VFD Technical Tx Technical


Potential combined “BUCCS Centrif Compressor Spec”
Specification Spec
Generic Permeate CO2 Technical
Centrifugal Technical Spec Spec
Technical Spec • Technical details/requirements for design and delivery of the VFD
and Motor Tx.
• Keep high level, mostly specified by the vendor
• Compressor process/mech data
• Some key criteria from the SOW written by Jeremy to be
• On-skid E&IC
incorporated and removed from SOW
• Control System
• Instruments
• Anti surge
• Seals
• HV Motor
• Couplings etc.
VFD Datasheet Tx Datasheet
• Look to rationalise documents, hard to align 3 similar docs of this length. (by vendor) (by vendor)
Permeate and CO2 compressor tech specs can probably be the same with a short
note on the differences between the two. Incorporating the generic spec may
make it too long winded however?
Datasheets (By
Equinox,
completed by
vendor)