Professional Documents
Culture Documents
Track drainage
RailControl
Flushing and inspection shaft
Technical data
Flushing and inspection shaft as 180° shaft or wye shaft in connection with RailPipe
Application: drainage pipe for track drainage; for application in the internal and external pressure
range and outside the pressure range.
Shaft bottom: PE (polyethylene)
Material / raw material:
Extension pipe: PP (polypropylene)
According to Directive DBS 918 064 of Deutsche Bahn AG
Specification: With valid manufacturer-related product qualification (HPQ)
EBA approval 21.42-21izbit/011-2101#075 (023-19-ZUL) 1.Ä. 036/17
Inside diameter of shaft
600
bottom: [mm]
Nominal diameter
600
extension pipe (DN/ID):
Outside diameter:
682
DO [mm] approx.
Nominal connection
2/250 3/250 2/400
diameters:
Ring stiffness
16 (SN 16) according to DIN EN ISO 9969
of extension pipe: [kN/m²]
Usability in cold
environments:
Laboratory performing
MFPA Leipzig
external quality control:
Push-fit couplings at the shaft bottom; EPDM profile sealing ring according to
Connections:
DIN EN 681 (DIN 4060); BARD ring (class D concrete support ring)
FRÄNKISCHE Rohrwerke Gebr. Kirchner GmbH & Co. KG | Hellinger Str. 1 | 97486 Königsberg / Germany
Phone +49 9525 88-0 | Fax +49 9525 88-92200 | marketing@fraenkische.de | www.fraenkische.com