1.04 Confirm all paint/surface coatings are free from damage. Ongoing
1.05 Inspect connection/junction boxes for corrosion, cleanliness, moisture and ensure silica gel is Ongoing
provided and replace if necessary.
1.06 Ensure all holes for entry cable are plugged properly. Ongoing
1.07 All panel fronts, gauges and in line instrumentation adequately protected from construction activity. Ongoing
1.08 Ensure equipment that is installed is protected suitably from any ongoing construction activities to Ongoing
prevent any damage.
1.09 Confirm preservation tag or label is fitted & updated. Ongoing
Comments:
Note: Tick all check item under OK - Satisfactory; N/A - Not Applicable; Punch items(s) are to be PL.