1.07 After unloading of shop fabricated pipe, an inspection should be made to ensure pipe spools are Ongoing
not damaged and all end covers are in place. Any missing end covers shall be replaced.
1.08 All random length pipes shall be identified as specified. Ongoing
1.09 Protection covers and plugs shall be of original packing for all materials. If water or dirt ingress due Ongoing
to damaged or improperly secured covers, the pipes shall be cleaned and covered with durable
end caps.
1.10 The end protection shall be inspected and securely installed in monthly basis, and repair them as Ongoing
necessary.
1.11 Check material is free from mechanical damage. Ongoing
1.12 Confirm all paint/surface coatings are free from damage. Ongoing
1.14 Ensure material that is installed is protected suitably from any ongoing construction activities to Ongoing
prevent any damage.
1.15 Confirm preservation tag or label is fitted & updated. Ongoing
Comments:
Note: Tick all check item under OK - Satisfactory; N/A - Not Applicable; Punch items(s) are to be PL.
Contractor Company
Data Input
Performed By Checked By Checked By Accepted By Witnessed By
Name:
Signature:
Date:
11