TO : Ian Danao FROM : Arcadis Philippines Inc.


OF : Metro Retail Stores Group, Inc. DATE : 08 April 2021
CC : Mikhael Lataza/ Joel Tabaranza REF. :
TOTAL
PROJECT : Metro Gaisano – Project Oval (Retail) : 2 (including attachments)
PAGES

Should this message be incomplete, please contact us.

Fire Protection Query No. 3

NO. QUESTION ANSWER

EVP
1 Please confirm that the clouded pre-action system
is included in the measurement.

Part plan of sheet no. FP-04

2 We have noticed some discrepancies on the


quantity of sprinkler heads shown on the sprinkler
schedule and plan layout. Please confirm that the
plan layout will govern.

PRACTICE MANUAL – ISO 9001:2015 EDITION: 5


STANDARD FORM BQF006 REVISION: 1 (JAN 2018)

Page 1 of 2
ARCADIS
PHILIPPINES INC
12/F Quadrants B and C,
8 Rockwell,
Hidalgo Drive, Rockwell Center
Brgy. Poblacion, Makati City
1210, Philippines

Tel +63 (2) 908 2888

www.arcadis.com

3 Please confirm if the sprinkler risers, drain risers


and feedmain connections intended for phase 2,
are included in this measurement.

Part plan of sheet no. FP-04

NOTE: Your reply to the above queries on or before (12 Apr 2021) would be of assistance, please.

Query List Monitoring

Date
Item Query List No. Remarks
Sent Required Replied
1 Fire Protection Query No. 1 05 Apr 2021 07 Apr 2021 07 Apr 2021
2 Fire Protection Query No. 2 08 Apr 2021 12 Apr 2021 08 Apr 2021
3 Fire Protection Query No. 3 08 Apr 2021 12 Apr 2021

Total No. of Pending Queries 1


Total No. of Answered Queries 2

PRACTICE MANUAL – ISO 9001:2015 EDITION: 5