STANDARD SUBMITTAL FORM

Attachment to Specification Section 013300

1. To: 2. From: 3. Date: 14-feb-21 5.


GHAFARI Associates, L.L.C. Walbridge de Mexico David Montoya 4. SUBMITTAL NO. 024 - 260526. -
X New
00 M Bonding Jumpers for Cable Tray
17101 Michigan Resubmittal
Fuente de Pirámides 6. Specification Section No.
Dearborn, MI 48185 260526
Naucalpan, C.P. 53950
Attn: Submittals Processing Tel: 011 52 55-5294-11-09 GHAFARI Project No.
7.
Phone: 313.441.3000 Fax: 313.425.3660 Fax: 011 52 55-5294-18-53
2064016
Email: submittals@ghafari.com Email: david.montoya@walbridge.mx 8. Project Title: GM Ramos Propulsion Battery Assembly &
Electric Motor (US #200420)
9. Copies Item No. 10. Item Description 11. Mfr/Contractor

1 001 Bonding Jumper 99-40, B-Line Eaton

1 002 bonding Jumper, FBE16-1, T&B Thomas & Betts

12. Contractor's Remarks

The undersigned certifies that the above-submitted items have been reviewed in detail and are correct and in strict conformance with all requirements of the contract documents
except as otherwise noted. Note: Approval of items submitted does not relieve contractor from complying with all requirements of the contract documents.

13. Name of Contractor Walbridge de Mexico Signature David Montoya

GHAFARI ASSOCIATES L.L.C - SUBMITTAL VERIFICATION SECTION


If a discipline necessary for proper review is not listed, add to Comments:
the distribution list and forward the submittal for review.
See comments within the submittal.
ACTION TAKEN
REVIEWED

X REVIEWED WITH COMMENTS


REVISE & RESUBMIT
FILE ONLY, NOT REVIEWED
NOT REQUESTED, NOT REVIEWED
DISTRIBUTION
Architectural Interior
Civil Landscape
Structural Tel/Data
Mechanical Industrial

X Electrical
Reviewed by & Date: REVIEW IS FOR GENERAL CONFORMANCE WITH THE DESIGN CONCEPT AND CONTRACT DOCUMENTS.
M. Sussi THIS OFFICE ASSUMES NO RESPONSIBLITY FOR THE ACCURACY AND COMPLETENESS OF THE SUBMITTAL. THIS REVIEW
DOES NOT RELIEVE THE CONTRACTOR OF RESPONSIBILITY OF ANY DEVIATION FROM THE CONTRACT DOCUMENTS.
2/22/2021

Form Revision Date: 06/30/2011 Página 1 de 1 AE-CA-F-201


Transmisión de Submittal
Reporte MSR010

Proyecto 200134
GM Ramos Propulsion Battery Assembly & Electric Motor (US #200420)

Fecha 14-feb-2021 Transmisión de Submittal 1129

Atención: John Heidt Transmitido Por: David Montoya


SSOE Inc. Walbridge de Mexico
1001 Madison Avenue Fuente de Pirámides
Toledo, OH 43604 Naucalpan, C.P. 53950
Tel: (419) 255-3830 Tel: 011 52 55-5294-11-09
Fax: (419) 255-6101 Fax: 011 52 55-5294-18-53

Transmitido Para Número de Submittal Descripción Fecha de Vencimiento

Aprobación 024 - 260526. - 00 M Bonding Jumpers for Cable Tray 21-feb-21

ASELEC

No. Registro Rev Sección Cantidad Tipo Descripción Proveedor Acción


Partida No. Espec_

001 4164 0 260526 1 Bonding Jumper 99-40, B-Line Eaton


002 4165 0 260526 1 bonding Jumper, FBE16-1, T&B Thomas & Betts
Acción:
A - Aprobado / Approved A1 - Aprobado / Revisar AAN1 - Aprobado Como se ha AAN - Aprobado Como se ha
Señalado Señalado/ Approved as Noted
C - Cancelled / Cancelado FONR - File Only, Not Reviewed NR - Not Requested NRNR - Not Requested, Not
Reviewed
R2 - Rechazado R - Rechazado/ Rejected RA - Regresar para Aprobar / R1 - Reviewed
Return for Approval
RC - Reviewed with Comments RR1 - Revisar y volver a RR - Revisar y volver a
presentar presentar/ Revise and Resubmitt
Observaciones
260526 - 024 - 00 M Bonding Jumpers for CableTray

David Montoya 14-feb-21


Revisor:
Firma Fecha

cc: Compañía Contacto Fax # Copias Notas


SHOP DRAWING REVIEW

A-E REMARKS
No Exceptions Note Markings

Comments Attached Rejected

1. Strictly adhere to GM-EI-1 Electrical Installation requirements for REQUIRED OF CONTRACTOR

cable trays. Process Resubmit

A-E review is for general conformance with the


design concept and contract documents.
Markings or comments shall not be construed as
2. Utilize bonding jumpers at expansion joints and where the cable relieving the Contractor from compliance with the
project plans and specifications, nor departures
therefrom. The Contractor remains responsible
tray is not mechanically/electrically continuous to ground. for details and accuracy, for confirming and
correlating all quantities and dimensions, for

- SSOE verification of field conditions, for selecting


fabrication processes, for techniques of assembly
and for performing his work in a safe manner.
SSOE #409
Gray, Gary
Fecha y hora de impresión: 14-feb-2021 15:41:35
BY:
Página: 1 de 1
DATE: 03/11/2021
Ramos Arizpe, Coahuila a 19 de agosto de 2021.

REPORTE FOTOGRAFICO DE RECEPCION DE MATERIAL

Lugar de recepción: GM Ramos Arizpe, “El Sarape”

Descripción de material: Jumpers de cobre para juntas de expansión en charola.

Responsable de recepción: Mauro Peña Pineda

FOTOGRAFIAS:

Ignacio Romero # 119 Col: San Benito, Hermosillo, Sonora. www.aselec.mx


Multilineas: (662) 215-1599 RFC: EAS110124UW8 ventas@aselec.mx
Página 1 de 1