The undersigned certifies that the above-submitted items have been reviewed in detail and are correct and in strict conformance with all requirements of the contract documents
except as otherwise noted. Note: Approval of items submitted does not relieve contractor from complying with all requirements of the contract documents.
X Electrical
Reviewed by & Date: REVIEW IS FOR GENERAL CONFORMANCE WITH THE DESIGN CONCEPT AND CONTRACT DOCUMENTS.
M. Sussi THIS OFFICE ASSUMES NO RESPONSIBLITY FOR THE ACCURACY AND COMPLETENESS OF THE SUBMITTAL. THIS REVIEW
DOES NOT RELIEVE THE CONTRACTOR OF RESPONSIBILITY OF ANY DEVIATION FROM THE CONTRACT DOCUMENTS.
2/22/2021
Proyecto 200134
GM Ramos Propulsion Battery Assembly & Electric Motor (US #200420)
ASELEC
A-E REMARKS
No Exceptions Note Markings
FOTOGRAFIAS: