You are on page 1of 60

Shri Vaari Electricals Private Limited

Information Overview

1
Glimpses
 Leading Chennai-based Panel board manufacturers and EHV contractors up to 230 KV
 Key supplier/contractor to major Industries, electricity boards, Airports and Port trusts
 Manufacturing plant located in Chennai. Has a manufacturing capacity to produce 400
Tons equivalent of Panel boards
 Company is in the process of setting up its second manufacturing facility near Chennai
with an annual capacity of 800 tons of panel boards p.a - Capex plan of Rs 10 crores
 New facility would also manufacture HV panel boards up to 33 KV
 More than 500 satisfied customers
 Executed several SEZ projects
 Having an unique and rich experience of executing and Liaisoning more than 1000
Projects and substations.
 Fully equipped EHV teams & Dedicated tools for EHV projects
 Having three branch offices including the one in Hyderabad catering to complete south
India.
 Involved in various power plants and Co-Gen plants
 Approved by various consultants
 ISO certified processes 2
Snapshot - Shri Vaari Electricals Private Limited
Overview P&L Projection
• Promoted in 1998, a reputed manufacturer LT Panel boards & EHV
contractor 5,575
6,000
• Co. is a leading manufacturer of Panel boards and Contracts 5,000 4,183
• Has majority market share in high voltage projects and LT panels 4,000

Rs Mn
• Strong industry relationships – Supply & providing services to all 3,000 2,355 2,034
1,600
major Industries, State Electricity Boards & major T&D players 2,000 1,220 1,114
938 740
1,000 541 216 506 233 417
108
-
FY07A FY08E FY09E FY10E FY11E

Net Sales EBITDA PAT

Operations B/S Projection


• Manufacturing facility Chennai (Tamil Nadu) with annual capacity of (Rs Mn)
400 TPA of Panel boards SOURCES FY07A FY08E FY09E FY10E FY11E
• Has about 200 employees, including a strong project team
Shareholders Funds 165 1,823 2,240 2,980 4,094
• Is setting up a manufacturing facility near Chennai for HT panel Loan Funds 320 318 818 318 318
boards. Production would commence in 2011
Others 19 9 - - -
• AMC services for various clients Total 504 2,151 3,058 3,298 4,412
• CPRI type tested panels APPLICATIONS
Net Block 298 1,126 2,120 1,667 1,332
Net Current Assets 196 1,015 928 1,621 3,070
Others 10 10 10 10 10
Total 504 2,151 3,058 3,298 4,412
3
Promoters
• Passionate entrepreneur with over 30 of years of experience in the Electrical projects
Mr. V.Rengarajan field
• Plays a critical role in the formulation of the company’s vision, mission and strategy. Is
(Managing Director)
a graduate in Electrical Engineering

Mr.Nathan • Has over 35 years of experience in Panel board manufacturing and tendering
• Factory and administration
(Executive Director)

Mrs. Kausalya
• Factory Administration
(Director)

Mrs. S.M.Jayanthi • Day to Day management

(Director)

4
Key Management Personnel
 An Electrical Engineering Graduate.
 Mr. Ram Srinivasan
 Heads the Marketing functions of the company. Plays a significant role in identifying
 (Marketing Director) new areas of growth for the company

 Mr. Anand  Has over 20 yrs of experience in the Project management and design of electrical
systems, TPM, TQM, LEAN and Six sigma
 (Technical Director)
 Design, Engineering, Energy management and project management, Value creation
for Customer

Mr.Raamesh • Engineer with over 27 years of experience in Contracts and tendering


• Heads the contract division in the Company
(GM-- Contracts)
(GM

5
Product Portfolio
MCCs PMCCs

PCCs Bus
Ducts

MV
Panel
s APFC

PLC
panel VFD Retrofittin
s panel g
s

6
Project Portfolio
Interior
Substation Switch Plant &
electrifica
s yards Machinery
tion

Outdoo
Indoor Power Lighting
r

220 Instru
110/132 DG
33 KV /230 Control ment
KV sets
KV ation

7
Extra-High Voltage Projects
A Competitive Advantage
EHV license for all southern states

ISO Certification

Excellent rapport with various Electricity boards and


CEIG

Technology Upgradation Vendor Management

 Continuous training for  Excellent vendor support


Engineers and field staff
 Lot of choices wrt brands
 Most modern tools and testing
 Ensuring timely delivery
equipment E.H.V Projects
 Regular vendor assessment
 Latest Autocad software

 A0 Plotter

 Design softwares

8
Result of Quality Processes

9
Addresses of Head & Branch offices

10
HEAD OFFICE & BRANCH OFFICE DETAILS
NAME OF THE COMPANY REGISTERED JOBS

Shri Vaari Electricals Pvt.Ltd. SSI No. 180768914. EHT/HT & LT Supply, Installation, Testing
No.C-37, Thiru vi-ka Industrial Estate, TIN No. 33630904755 / & Commissioning, Manufacturing all types of
Guindy Panel Boards such as MCC, PCC, AMF
Chennai – 600 032. CST No. 846337/ 3-04-2006 Panels, Bus Ducts, Rising Mains Etc.,
Ph : 2 234 8541 ECC No. AAJCS5545EXM001 Annual maintenance contracts jobs in
2 233 0557. Tele fax. ESI No. 51-7728-66 Airports, TNPL, Ford, Sutherland Global
ESA LICENSE NO: 246 E-mail: srivaari@gmail.com Services Pvt. Ltd., & Cognizant Technology
Web site: www.srivaarielectricals.com Solutions India Pvt. Ltd.,
Importer – Exporter Code 0406010935
NSIC No. NSIC [C] GP / [ S – 1115 /06 ]

Shri Vaari Electricals Pvt Ltd., KGST No. 73125260 EHT/HT& LT Electrical Installation, Testing
No.2, Pillappa Industrial Estate CST No. 73175260 & Commissioning, Manufacturing all types of
Sungathagatha Panel Boards such as MCC, PCC, AMF
Bangalore – 560 091. Panels, Bus Ducts, Rising Mains Etc.,
Karnataka
ESA LICENSE NO. 16354

Shri Vaari Electricals Pvt. Ltd., APGST No. CTR – 01-4-2437 EHT/HT& LT Electrical Installation, Testing
Plot# 31/131/1/2, D-5 CST No. CTR – 01 – 4 – 2195 & Commissioning, Manufacturing all types of
Surya Enclave, Bharani colony, Email: srivaari.ap@gmail.com Panel Boards such as MCC, PCC, AMF
Sainikpuri, Panels, Bus Ducts, Rising Mains Etc.,
Secunderabad-500094.
ESA LICENSE NO. A/3109
11
List of EHV Jobs

12
List of EHV Jobs . continued
Value of Project
SI No Client Name Capacity of Installations
in Cr

110 KV WORKS

M/s. ARRKAY energy ,


1 110 KV switch yard works 12 Crores
Rameshwaram

2 M/s. SISCOL/ JSW, Salem 110 KV transmission line and switchyard works 8 Crores

M/s. Allisons power transmission,


3 110 KV cable supply and laying works 14 crores
Orgadam, Chennai

2 X 16MVA, 110KV / 11 KV Transformers,


4 M/s. Exide Industries Limited, Hosur switchyard works and Transmission line works 10.5 Crores
for 8 kms

13
EHV Liaisoning jobs
•Sterlite Industries (copper) Tuticorin 230 KV

•JSW Salem 110 KV

•Hyundai Chennai 230 KV

•Arrkay energy Rameshwaram 110 KV

•Manali Petro Chemicals Manali 110 KV

•MALCO Mettur 110 KV

•Bannari amman sugars Thiruvannamalai 110 KV

•Dharani Sugars Kallakurichi 110 KV

•Synergy shakthi Krishnagiri 110 KV

•Kamashi sponge Iron Gumidipoondi 230 KV


14
India Cements Thalavai 110 KV
EHV Liaisoning jobs
•Thiru Arooran sugars Thanjavur 110 KV

•Tamilnadu chemicals Karaikudi 110 KV

•Dhanalakshmi sugars Perambalur 110 KV

•Shakthi Sugars Coimbatore 110 KV

•SV Sugars Kanchipuram 110 KV

•SBQ Steels Gudur 132 KV

•SRF Limited Manali 110 KV

•High tech carbon Gumidipoondi 110 KV

Dalmia Cements Ariyalur 110 KV

Kothari sugars and Chemicals Ariyalur 110 KV


15
TNPL Pugalur 110 KV
EHV Liaisoning jobs

Chettinad Cements Karur 110 KV

Madras Cements Thalavai 110 KV

EID Parry Nellikuppam 110 KV

Arrkay energy Rameshwaram 110 KV

16
List of Power and Co- Gen projects

17
Power & Co-Gen Projects
• Bannari Amman Sugars, Tiruvannamalai.
• Dharani Sugars & Chemicals, Kallakurichi
• JSW Steel Ltd. Salem
• MMS steels, Nagapattinam,
• AARKAY Energy, Rameshwaram
• TNEB, Chennai
• ETPS, Chennai

18
List of Customers
In
33 KV segment

19
List of 33 KV Jobs
• Elforge Limited, Chennai
• Alufit India Ltd., Kuppam
• BYD electronics, chennai
• Tata Blue scope steels, Chennai
• Robert Bosch, Coimbatore
• EID Parry, Ennore,
• Chennai airport
20
List of consultants

21
List of Consultants/Architects
• Kausi Consultancy Services, Chennai.
• Avant-Garde Engineers & Consultants
• M.N.Dastur & Sons
• CRN, Chennai
• S.M. Engineers & Consultants, Chennai
• Pal Designs, Chennai
• Mecon
• SEMAC Consultants, Hyderabad
22
List of Tools and Tackles

23
List of tools & testing instruments
Sl.
Name of the Equipments Quantity
No

1 500V Megger 10 Nos.

2 1000V Megger 10 Nos.

3 2500V Megger 10 Nos.

4 5000V Megger. 3 Nos.

5 Earth Resistance Tester 10 Nos.

6 Phase Sequence Meter 10 Nos.

7 Tong tester 10 Nos.

8 Voltmeter & Ammeter testing board 10 Nos.

9 Multi meter ( Digital ) 15 Nos.

CMC 356 Protection relay set- Omicron make


10. 1 No

11. Model : EW188 – Tan delta testing kit 1 No


24
12 Scope make DCRM100B test kit 1 No
Financial performance

25
Financial performance

120
100
Value in Crores

80
60
40
20
0
2006-07 2007-08 2008-09
Series1 92.12 94.5 98.73
Years
26
List of Satisfied customers

27
28
29
30
31
32
33
Design & Drawings

34
Design Facilities

• ETAP Software for electrical design

• Indian Standards

• Indian electricity rules

35
ELECTRICAL WORKS:
DESIGN DOCUMENTS:
•Busbar Sizing Calculation including Bending Stress, Vertical Deflection
•Vibration Calculation for Tubular Busbar.
•Cantilever Strength Calculation for Post Insulator.
•CT & PT Burden Calculation.
•Design of Earthing.
•Outdoor Lighting Calculation.
•Indoor Lighting Calculation.
•Short Circuit Force Calculation for Gantry.
•Cable & Interconnection Schedule.
DRAWINGS:
•Metering & Relaying Single Line Diagram.
•Electrical Layout.
•Erection Key Diagram.
•Shielding Layout.
•Outdoor Lighting Layout.
•Indoor Lighting Layout.
•Earthing Layout 36
•Detail of Earthing.
STRUCTURAL WORKS:

DESIGN DOCUMENT:

•Design Basis for Structural Works.


•Design of Girder.
•Design of Tower.
•Design of Lightning Mast.
•Design of CT Supporting Structure.
•Design of PT Supporting Structure.
•Design of LA Supporting Structure.
•Design of PI Supporting Structure.
•Design of PI ‘A’ Frame Supporting Structure.
•Design of ISOLATOR Supporting Structure (Low Level).
•Design of ISOLATOR Supporting Structure (High Level).

37
CIVIL WORKS:
DESIGN DOCUMENT:
•Design Basis for Civil Works.
•Design of Control Building.
•Design of Foundation for Transformer.
•Design of Burnt Oil Tank.
•Design of Fire Barrier Wall.
•Design of Foundation for Tower.
•Design of Foundation for Lightning Mast.
•Design of Foundation for CB
•Design of Foundation for CT Supporting Structure.
•Design of Foundation for PT Supporting Structure.
•Design of Foundation for LA Supporting Structure.
•Design of Foundation for PI Supporting Structure.
•Design of Foundation for PI ‘A’ Frame Supporting Structure.
•Design of Foundation for ISOLATOR Supporting (Low Level).
•Design of Foundation for ISOLATOR Supporting (High Level).
•Design of Cable Trench.
38
Site Photographs 220 KV

39
40
41
42
43
44
45
46
47
48
49
Site Photographs 110 KV

50
110 KV 20 MVA transformer

51
110 KV, 20 MVA Transformer

52
110 KV switch yard

53
110 KV switch yard

54
110 KV switch yard

55
56
57
58
C&R Panels
ERROR: ioerror
OFFENDING COMMAND: image
STACK:

You might also like