1.At what stage should you consider the provisions of RA 9266?

A. At the very onset, during Pre – Design Services


B. Anytime during the Design Development Stage
C. During contract documentation Stage
D. After Construction Phase

2.What should be the project’s AMBF?


A. 50% of TLA
B. 60% of TLA
C. 70% of TLA
D. 80% of TLA

3.Based on the lot configuration and NBC Rules 7 & 8, what is the allowable
TGFA for this project assuming that a sprinkler system is provided?
A. 6 x 80%
B. 5 x 80%
C. 3 x 80%
D. 2 x 80%

4.What is the Maximum PSO based on occupancy assuming no firewall are used?
A. 50% of TLA
B. 60% of TLA
C. 70% of TLA
D. 80% of TLA

5.What is the required TOSL based on occupancy assuming no firewall are used?
A. 30% of TLA
B. 40% of TLA
C. 50% of TLA
D. 60% of TLA

6.Based on the lot configuration, what is the required setback for the frontage?
A. 2 meters
B. 3 meters
C. 5 meters
D. 7 meters

7.Based on the lot configuration, what is the required setback for the sides?
A. 2 meters
B. 3 meters
C. 5 meters
D. 7 meters

8.Based on the lot configuration, what is the required setback for the rear?
A. 2 meters
B. 3 meters
C. 5 meters
D. 7 meters

9.What is the project’s USA if no firewall will be constructed?


A. 10% of TLA
B. 20% of TLA
C. 30% of TLA
D. 40% of TLA

10. What is the project’s ISA if a firewall is to be constructed?


A. 10% of TLA
B. 20% of TLA
C. 30% of TLA
D. 40% of TLA

11. What is the project’s FLAR


Designation / Rights?
A. 1.00
B. 1.50
C. 2.50
D. 3.50

12. As per NBC, eaves over required windows shall not be less than how many
millimetres from the side and rear property lines?
A. 600 mm
B. 750 mm
C. 900 mm
D. 1200 mm

13. If the calculated Allowable Maximum TGFA exceeded AMVB, which should
prevail?
A. TGFA must always prevail.
B. AMVB must always prevail.
C. Use which
D. Use the lesser area

14. What should be the allowable BHL for this project type?
A. 15 meters but not to exceed the duly approved BHL in the major zone it is
part of.
B. 21 meters but not to exceed the duly approved BHL in the major zone it is part
of.
C. 27 meters but not to exceed the duly approved BHL in the major zone it is part
of.
D. 30 meters but not to exceed the duly approved BHL in the major zone it is part
of.

15. What is the minimum percentage of open space for the


project if without firewall?
A. 20%
B. 30 %
C. 40 %
D. 50%

16. What size of an average car parking slot for perpendicular parking?
E-DESIGN: THEATER
A. 2.00 meters x 5.00 meters
B. 2.15 meters x 5.00 meters
C. 2.50 meters x 5.00 meters
D. 2.15 meters x 6.00 meters

17. What size of an average car parking slot for diagonal parking?
A. 2.00 meters x 5.00 meters
B. 2.15 meters x 5.00 meters
C. 2.50 meters x 5.00 meters
D. 2.15 meters x 6.00 meters

18. What size of an average car parking slot for parallel parking?
A. 2.00 meters x 5.00 meters
B. 2.15 meters x 5.00 meters
C. 2.50 meters x 5.00 meters
D. 2.15 meters x 6.00 meters

19. Considering accessibility and user comfort, what should be the width of the
aisles?
A. 1200 mm
B. 1350 mm
C. 1500 mm
D. 1650 mm

20. Which of the following materials would you recommend for the stage area?
A. Rockwool Insulation
B. Soundproof foam panels
C. Soundproof drywalls
D. Painted gypsum board