You are on page 1of 2

METHODOLOGY:

Mobilization:

After clearing the site, we shall mobilize to site the necessary equipment for the project in the
order of its usage.

Stake and Layout:

While mobilizing the equipment needed, the survey team will start the setting out, measuring
and leveling and shall stake out reference point and markers that will served as guide for the excavation.

Concrete Cutting and Demolition:

After the stake and layout, we will cut the concrete to its line mark in order not to damaged the
area of the concrete that is to be retained with the use of concrete cutter. After the cutting of concrete
the Backhoe with the breaker will start the demolition of the area of the concrete slab that is to be
excavated according to the plan.

Cutting Outfit:

After the cutting and demolition of the concrete we shall cut all of the exposed rebars with the
use of acetylene oxide to prevent the breaking of the area of the concrete slab that is to be retained.

Excavation:

After the cutting outfit, the Backhoe will start to excavate all of the demolished and affected soil
and debris.

Hauling:

While excavating the partial excavated soil and debris will be loaded in the drum truck and will
temporarily disposed in lot 2 and will repeat the process until its done. After the excavation the
excavated soil and debris that is disposed in lot 2 will be disposed in the appropriate disposal area.

You might also like