Professional Documents
Culture Documents
OBJECTIVES:
WORK EXPERIENCE:
May 15, 2021 – June 20, 2022 SINOTCC (Singapore) P.T.E. LTD
Oil and Gas
Project: Jurong Island
Line hauling, loading, and unloading freight vehicles using related equipment.
Transporting materials to the facility.
Securing loads to the machine before transportation.
Locate and move stock of products pallet or crates for storage or shipment.
Prepare grinder, cutting disk, grinding dish, tape measure, level bar and etc.
Checking ISO drawing and standard support drawings before preparing the
material.
Plans installation or repair to avoid obstruction and to avoid interfering with the
activities of other workers.
Selects the Type and size of pipe, and related materials and equipment, such as
support, hangers and hydraulics.
Cuts pipe support, using saws, hammers, cutting torch, and grinder.
Layout, assembles, and install the pipe support according to the ISO drawing and
standard drawing and check the location and the ISO number.
October 31, 2016 – June 23, 2017 Daeshin Plant Construction Co. LTD
Turkmenistan/Turkmenbashi
Project: Tace Ethane Cracker
and PE/PP Plant
Steel Erector
Line hauling, loading, and unloading freight vehicles using related equipment.
Transporting materials to the facility.
Securing loads to the machine before transportation.
Locate and move stock of products pallet or crates for storage or shipment.
Prepare grinder, cutting disk, grinding dish, tape measure, level bar and etc.
Checking ISO drawing and standard support drawings before preparing the
material.
Plans installation or repair to avoid obstruction and to avoid interfering with the
activities of other workers.
Selects the Type and size of pipe, and related materials and equipment, such as
support, hangers and hydraulics.
Cuts pipe support, using saws, hammers, cutting torch, and grinder.
Layout, assembles, and install the pipe support according to the ISO drawing and
standard drawing and check the location and the ISO number.
.
Bolt tightening and fixing by using torque wrench and impact wrench.
Segregated the bolts and different sizes.
Know how to operate man lift or cherry picker.
Knowledge in some basic rigging jobs like hand signal and ETC.
Can modified structural materials and components as per modification drawing.
Preparing tools and materials to be used at a time.
May 25, 2012 – June 03, 2013 CB&I
Papau New Guinea
Project: PNG/LNG EPC4
EDUCATIONAL BACKGROUND:
PERSONAL DATA: