Professional Documents
Culture Documents
OYSUN GAS PR
ROCES
SSING PLANT
P (BGPP))
Pu
urchase Orrder No.: BOGPZ-20/2
287-ZKPS
Lube O
Oil Syste
em Data Sheett
Ta
ag No. 214-01-P
2 PA-01AA/B; 214
4-02-PA -01A/B
BGPP--ZKP-200
0-MR-E02
2-0287-2
214-0005--E-1
Vendo
or’s Drawin
ng Numberr: BGPP-ZKKP-200-MR--E02-0287--214-0005-E
E-1
Sheet Num
mber: 5
Revisio
on: 1
R
Rev Revision Description Date Prepared
P Checked Approved
0 Issued for review 19.01.2022 HTF ZHL XYH
1 Issued for review 08.09.2022 He Tengfeng Z
Zeng Hailong Xia Yihong
VENDO
OR DATA STATUS NO
OTE: Perrmission to proceed no ot constitute
e
accceptance orr approval of design n
□1 : Rejectted
details, calcullations, Analysis, testt
□2 : Acceptable with co
omments methods or m materials de eveloped orr
□3 : Acceptable seleected by thee supplier and does nott
□4 : Information Only relieve supplieer from full compliance e
with
h contractua l obligations.
SUBC
CONTRACTO
OR PURCHASE
ER
. . . . . .
General : Implement the
comment and submit for AFC
revision.
Sub-Vendor: Vendor: M25-BOYSUN GAS PROCESSING PLANT EP Contractor: Owner/Purchaser:
44
SHEET. 1 OF 4
Sub-Vendor: Vendor: M25-BOYSUN GAS PROCESSING PLANT EP Contractor: Owner/Purchaser:
SHEET. 2 OF 4
Sub-Vendor: Vendor: M25-BOYSUN GAS PROCESSING PLANT EP Contractor: Owner/Purchaser:
SHEET. 3 OF 4
Sub-Vendor: Vendor: M25-BOYSUN GAS PROCESSING PLANT EP Contractor: Owner/Purchaser:
12 High differential pressure for each oil filter set 0.15 MPa (PDIT-91101A) /
13 High temperature alarm downstream the cooler >50℃(214-TT-91110) /
l
14 ○Requirements of API 614/ISO 10438-1.6.2.1.1 apply(6.3)
15
16 Shop inspection : Shop test
17 ○Compliance with inspector’s checklist(7.1) Required Witness
18 ○Required for system assemblies ●Cleanliness ■ □
19 ○Cleanliness prior to closure ●Used during shop test(7.3.1.2) ■ □
20 ○Required for major components ●Check controls □ □
21 ●Material certifications to be furnished ●Changeover filters/coolers ■ □
22 ○Special examinations ●One and two pump operation ■ □
23 ●Code construction /stamp ■/□ ●Sound level ■ □
24 ●Certified copies of all test logs and date ●Hydro test assembled system ■ □
25 ○Check pipe strain(7.3.1.4) ●Used for complete-unit test(7.3.1.3) □ □
26 ○Pipe radiography(5.1.3) ●Certified copies of all test logs and date □ □
27 ●Sound level recorded during test ■ □
28 Vendor’s Date:
29 ○Coordination meeting to be held within4-6 weeks after order commitment(8.1)
30
31 Comments:
32 0
33 0
0
34
0
35 0
36 0
37 0
38 0
0
39
0
40 0
41 0
42 0
0
0
Figure A.1-Datasheet-Scope and attachments-USC units(continued)
SHEET. 4 OF 4