You are on page 1of 5

BO

OYSUN GAS PR
ROCES
SSING PLANT
P (BGPP))
Pu
urchase Orrder No.: BOGPZ-20/2
287-ZKPS

Lube O
Oil Syste
em Data Sheett
Ta
ag No. 214-01-P
2 PA-01AA/B; 214
4-02-PA -01A/B

BGPP--ZKP-200
0-MR-E02
2-0287-2
214-0005--E-1

Vendo
or’s Drawin
ng Numberr: BGPP-ZKKP-200-MR--E02-0287--214-0005-E
E-1
Sheet Num
mber: 5
Revisio
on: 1

R
Rev Revision Description Date Prepared
P Checked Approved
0 Issued for review 19.01.2022 HTF ZHL XYH
1 Issued for review 08.09.2022 He Tengfeng Z
Zeng Hailong Xia Yihong

VENDO
OR DATA STATUS NO
OTE: Perrmission to proceed no ot constitute
e
accceptance orr approval of design n
□1 : Rejectted
details, calcullations, Analysis, testt
□2 : Acceptable with co
omments methods or m materials de eveloped orr
□3 : Acceptable seleected by thee supplier and does nott
□4 : Information Only relieve supplieer from full compliance e
with
h contractua l obligations.
SUBC
CONTRACTO
OR PURCHASE
ER

ENGIINEER LEAD ENG


GINEER PRO
OJECT MAN
NAGER

. . . . . .
General : Implement the
comment and submit for AFC
revision.
Sub-Vendor: Vendor: M25-BOYSUN GAS PROCESSING PLANT EP Contractor: Owner/Purchaser:

LUBE OIL STATION DATASHEET FOR LEAN


SULFINOL CHARGE-X PUMPS 214-01-PA-01A/B checka nd correct item no.
214-02-PA-01A/B
Zhejiang EAGLE PRO ZHEJIANG KEER
Lubrication Equipment CO., VENDOR DOC. NO. : BGPP-ZKP-200-MR-E02-0287-
PUMP STOCK CO., Rev.: 1
LTD. 214-0005-E
LTD
Pls use SI (metric units)

API 614/ISO 10438-3 DATASHEET Job No.: Item No.: XYZ-63 0


SCOPE AND ATTACHEMENTS Page: 1 of 4 By: He Tengfeng 0
USC units Date: 2022-9-7 Revision: Chen Liang 0

1 APPLICABLE TO: □Proposal □Purchase ■As Built


2 For Site SURKHANDARYA REGION, REP. OF UZBEKISTAN
Oil system for LEAN SULFINOL CHARGE-X PUMPS Inquiry No. BGPP-ZKP-200-MR-E02-0287-214-0005
3 Supplier KEER PUMP Manufacturer EAGLE PRO 0
4 Purchase Order NO. Date 0
5
6
7 Explanations: 1.The party to complete the information is indicated as follows:
8 ○Purchaser □ Vendor ▽Either, but by vendor if not by purchaser.
2.An asterisk * specifies a requirement, value, or criterion .
9 3.Designations in parenthesis()are explained in the cited standard ;numbers without a prefix are subclause numbers ;those prefixed
10 “T” are text figure numbers; those prefixed “A” are Annex “A” Figure numbers.
4. For definition of general purpose basic system, see4.1
11
12
13
14 Basic Design(4.1.1) Class:○ Ⅰ ○Ⅱ ●Ⅲ Code: Class III-P0-R1-H1-BP2-C2F2-C0-PV1-TV1-BB1 0
15 Design goal for uninterrupted operation (mission time)of the equipment(4.2.2): ≥ 60 months
16 MR

17 Overall system typical schemas Figure No: Option Nos. Comment


18 ○Basic oil supply module
BGPP-ZKP-200-PR-G18-
19 ○Lube module at equipment 0287-214-0001-E

20 ○Drawing requirements ●Component review


21 Oil Requirements :See API614/ISO 10438-1 Datasheet
22 Baseplate / layout: □Combined with equipment base
23 ●Grout hole/vent holes(4.3.6) ○Point support(4.3.7)
●Epoxy grout/primer pre-coat ● 1800mm (ft) min. clearance for components(4.2.10)
24
○Sloped decking required(4.3.3) ●Non-skid decking required(4.3.5)
25
26 Basic system detail:
■Equipment coast-down time 3 minutes ● Shop test conditions
27
■Minimum start-up oil temperature 10 (℃) ● Field start-up/run-in conditions
28 ●Sound level <85 d B max.(4.2.5) ■Welding and special fabrication requirements
29 Special provisions necessary for back-up supply of lube oil (4.2.15): ■Standby pump■Rundown tank
30
31 Components: ●All steel external components(4.2.11)
32 Piping and Tubing ○Additional special requirements ,see
33 ▽Tubing fitting –Mfg.: GB Model: Φ14*2 ○Utilities manifolded to common connections
●Carbon steel slip-on flanges not allowed(ISO 10438-1,T 1-4) ○Air
34
●Through studs required ● Cooling water
35 ○Heat tracing required by □ Purch. □Vendor ○Instrument test valves required
36 ○Value heads vented to reservoir ● Valved vents, drains and piping furnished to permit
37 ○Radiographic examination (5.1.3) draining of idle components during operation(4.2.13)
38
39 Continuous flow transfer valves
●Tight shutoff required ▽with lifting jack
40
●Type six-port a straight plug valve, without resilient seats for filter Rating: 16 (barg)
41 ○Spectacle Blinds provided(4.8.4) ▼Materials :body:304
42 ▼Manufacturer QIDONG XINGYUAN ▼Plug or ball:304
43 ▼Model ZSF1.6PC DN40 ▽Trim

44

Figure A.1-Datasheet-Scope and attachments-USC units(continued)

SHEET. 1 OF 4
Sub-Vendor: Vendor: M25-BOYSUN GAS PROCESSING PLANT EP Contractor: Owner/Purchaser:

LUBE OIL STATION DATASHEET FOR LEAN


SULFINOL CHARGE-X PUMPS 214-01-PA-01A/B
214-02-PA-01A/B
Zhejiang EAGLE PRO ZHEJIANG KEER
Lubrication Equipment CO., VENDOR DOC. NO. : BGPP-ZKP-200-MR-E02-0287-
PUMP STOCK CO., Rev.: 1
LTD. 214-0005-E
LTD

API 614/ISO 10438-3 DATASHEET Job No.: Item No.: XYZ-63 0


SCOPE AND ATTACHEMENTS Page: 2 of 4 By: He Tengfeng 0
USC units Date: 2021-8-19 Revision: Chen Liang 0

1 Applicable to □Proposal Purchase ■As built


Supplier KEER PUMP Manufacturer EAGLE PRO 0
2
Purchase Order No. Inquiry no. 0
3 Date 2021-8-19 0
4
5
6 Oil conditioners(if required)
7 ○Purchaser’s item no. 0 Driver for. 0
○Type 0 ▽(HP) and enclosure 0
8
○Portable or mounted on Pls attach the drawing
0 ▽Volts/PH/Hz
9 Previous Revision comment
▽Rated 0 / / not 0implemented. Change to
10 ▽Manufacturer 0 ○ SRY 0
11 ▽Model 0 Water removal rate 0
▽Material if construction 0
12
13 Reservoir(4.4) Pumps and drivers(4.5)
●Figures no. XYZ-63-TK01 0 ○Purchaser item nos.
14
○Include options no: 0 ●Full details on date sheet
15 ●Electric heater (4.4.7) ●Removable during Pump type and material:
16 operation[4.4.7.c)] ●Supplier standard
17 ●(HP) and enclosure BRY 400V/5KW IP66 0 ○Centrifugal(4.5.1) ○horizontal ●vertical
●Volts/PH/Hz ○ISO 13709 ASME B73.2/ASNE B 73.3
18
AC400V / 3PH / 50HZ 0 ●Rotary positive displacement (4.5.1)
19 ●Special heater sizing[4.4.7.b)] ●API RP 676 Vendor to confirm the sizing of reservoir
20 ●Oil level glass(4.4.5.d) ●Submerged working capacity is greater than flow rate
required for 3 minutes by both pumps
21 ●Low level alarm(4.4.6.1) ○Steel casing(4.2.11) simultaneously
●50-mm fill opening[4.4.5.f)] ○In-line
22
●Sloped bottom with low point drain(4.4.4.2) Pump quantity and driver(s): Two pumps (1 operating and 1 standby
23 ●Free surface- 1.861 (m2) Single-shaft driven
24 ▼Working capacity 0.125 m3 ●Single-motor driven
25 ▼Retention capacity 0.51m3 ▽Motor driven start-up w/shaft drive main (4.5.3)
■Rundown capacity 0.454 m3 0 ●Full-sized motor-driven start-up to double as auxiliary pump (4.5.4)
26
■Normal operating range 0.51~0.69m3 0 ○Dual motor drive Kindly check, as these pumps are under shelter
27 ○Dual steam turbine main/motor
■Charge capacity 0.96 m3 0 aux.AC, reservoir insulation may be
without
28 ○Insulation clips(4.4.8) ○Motors per(4.5.5) required.
29 ○Ladder with handrail(4.4.10.1) ●IEC1) ○NEMA ○ Other 0
30 ●(HP) and enclosure 2X3KW/IP66 0
○Handrails on top(4.4.10.2) ●Volts/PH/Hz
31
○Non-skid decking(4.4.10.3) AC400V / 3PH / 50HZ
32 ●Flanged vent ●Shaft power 2.24KW
33 ●Flanged drain connection(4.4.4.3) Pump installation
○Extra connection (4.4.9) ●Removable strainer(4.5.14)
34
○Siphon breaker ○Mounting pads[4.5.19.a)]
35
●Top mounted components permitted ●Jackscrews provided for pump driver[4.5.19.e)]
36 ○Oil Mist Fan
■Submerged components and materials
37 OIL HEATER ○IEC1) ○NEMA ○ Other 0
38 ■Dimensions of tank LxWxH 2100x2200x1850 (mm) ○(HP) and enclosure 0
○Volts/PH/Hz
39
LUBE OIL / /
40 NORMAL PRESSURE 10barg ○Shaft power
41 NORMAL FLOW 89L/min
42
This is oil pump pressure.
43 Add another line for lube oil
supply pressure as 2.5 barg
44 as per GAD.
45
46

Figure A.1-Datasheet-Scope and attachments-USC units(continued)

SHEET. 2 OF 4
Sub-Vendor: Vendor: M25-BOYSUN GAS PROCESSING PLANT EP Contractor: Owner/Purchaser:

LUBE OIL STATION DATASHEET FOR LEAN


SULFINOL CHARGE-X PUMPS 214-01-PA-01A/B
214-02-PA-01A/B
Zhejiang EAGLE PRO ZHEJIANG KEER
Lubrication Equipment CO., VENDOR DOC. NO. : BGPP-ZKP-200-MR-E02-0287-
PUMP STOCK CO., Rev.: 1
LTD. 214-0005-E
LTD

API 614/ISO 10438-3 DATASHEET Job No.: Item No.: XYZ-63 0


SCOPE AND ATTACHEMENTS Page: 3 of 4 By: He Tengfeng 0
USC units Date: 2021-8-19 Revision: Chen Liang 0

1 Applicable to □Proposal □Purchase ■As built


2 Supplier KEER PUMP Manufacturer EAGLE PRO 0
Purchase Order No. Inquiry no. 0
3
Date 2021-8-19 0 Vendor to confirm du[plex filter with
4 replaceable cartridges/element is provided
5
6 Filters:
7 ○Purchaser item no. 0 ●Cartridges make/model[4.7.7.m)] EAGLE PRO /1W-10um
8 ●Duplex(4.7.1) ○Single[4.7.1.a)] ○Thermal relief valves(4.7.3)
9 ●10 Micron filtration level(4.7.1) ●Non-hydroscopic elements[4.7.1)]
10 ▼Manufacturer/Model EAGLE PRO/SLQ-40 Furnish 0 extra sets of cartridges
▼Design/test(barg) 16 / 24 0 ○Per filter(extra over other spares)
11
▼Material: case and top 304 0 ●Code construction/stamp(4.2.14) ■/□
12 ●Vents piped to reservoir(4.7.5) ●with flow indicators(4.7.6)
○Filter drains manifolded with drains(4.7.4)
13
14 Lube oil rundown tanks:
15 ●Required(4.9.1) □Capacity (gal) 0.193 m³
16 ●Purchaser item no. XYZ-63-TK02 Material(4.9.1) 304L
17 Time at flow rate(min) 3
○Code construction/stamp(4.2.14.4.9.4) ■/□ Design/test pressure (barg) atmospheric / leak test
18
19 Coolers □None required(4.6.1.1) ▼Single ▽ Connections only off-base cooler[4.6.1.2.b)]
20 Type: ●Shell and tube ○ Fin fan (4.6.1.2.a) ○Plate frame[4.6.1.2.a)] ○Flanged vent & drain nozzles(4.6.1.8)
21 ●Refer to specification ●Supplier std. ○Special sizing criteria[4.6.1.2.f)] ●Vents piped to reservoir(4.6.1.9)
22 ○Suitable for use with 150℃(300℉) coolant(4.6.1.6) ○Cooler drains manifolded with filter clean oil drains(4.6.1.9)
23 ●Purchaser item no(s) XYZ-63-E01 0 □Duty (BTU/hr) 61407 0
24 ○Twin units(4.6.1) ▼ Manufacturer/Model EAGLE PRO /SGLL-5m2 0
25 ○Details on date sheet
26 Shell and tube:
27 ○Water side for steam heating ▼Design/test shell side(barg) 16 / 24 0
28 ▼Water side corrosion allowance 3mm 0 ▼Design/test tube side (barg) 16 / 240
29 ●TAME class C 0 ▼Designt temperature shell side(°C) 90 0
30 ▼Fouling factor water/oil side 0.00035/0.00172 m2℃/w 0 ▼Designt temperature tube side (°C) 90
31 ▼Tube :L/OD/BWG 1200mm/Φ12mm/18 BWG 0 ●Code construction/ shamp (1.2.17) ●/○
○Thermal relief valve(4.6.1.2.e) ▼Tube water velocity and capacity 2(m/s)/ 6(m3/h)
32
●Oil temperature control valve with bypass line(4.6.1.3) ▼Material :shell(4.6.2.4) 304L 0
33
○Flanged ,pneumatically operated(4.6.1.3.b) ▼Channels and covers(4.6.2.4) 304L 0
34 ●Manual override(4.6.1.3) ▼Tube sheets and tubes(4.6.2.4) 304L 0
○Oil side operating pressure less than water side[4.6.2.1.c)]
35
●Removable bundle(4.6.2.1)
36 Air Cooled Hear Exchangers:
37 ○Dual fanc [4.6.4.2.a)] ○Stainless steel plate header boxes[4.6.4.2.c)]
38 ○Austenitic stainless steel tubes[4.6.4.2.b)] ○High vibration alarm for each fan[4.6.4.2.e)]
39 Continuous flow transfer valves(4.8)
40 ▼Manufacturer 0●Model 6ZSF1.6PC DN40 ▼Rating:(barg) 16 0
41 ●Type six-port a straight plug valve, without resilient ▼Materials: ▼ Body: 304 ▼Plug or ball: 304 ▽Trim
seats for filter0 ○Spectacle blinds(4.8.4)
●filters(4.8.1)
42

Figure A.1-Datasheet-Scope and attachments-USC units(continued)

SHEET. 3 OF 4
Sub-Vendor: Vendor: M25-BOYSUN GAS PROCESSING PLANT EP Contractor: Owner/Purchaser:

LUBE OIL STATION DATASHEET FOR LEAN


SULFINOL CHARGE-X PUMPS 214-01-PA-01A/B
214-02-PA-01A/B
Zhejiang EAGLE PRO ZHEJIANG KEER
Lubrication Equipment CO., VENDOR DOC. NO. : BGPP-ZKP-200-MR-E02-0287-
PUMP STOCK CO., Rev.: 1
LTD. 214-0005-E
LTD

API 614/ISO 10438-3 DATASHEET Job No.: Item No.: XYZ-63 0


SCOPE AND ATTACHEMENTS Page: 4 of 4 By: He Tengfeng 0
USC units Date: 2021-8-19 Revision: Chen Liang 0

1 Applicable to □Proposal □Purchase ■As built


2 Supplier KEER PUMP Manufacturer EAGLE PRO 0
Purchase Order No. Inquiry no. 0
3
Date 2021-8-19
4
5
6 Alarms and Shutdowns: Alarm Shutdown
Condition Liquid level, pressure, differential pressure, and
7 Liquid level and pressure
temperature
Low oil pressure When the system pressure is lower than 1.5bar (PIT- When the system pressure is
8 lower than 1.2bar (PIT-
91101A)
91102A)
Low level for each oil reservoir When the liquid level of the tank is lower than
375mm (LIT-91101A); When the liquid level of
9 the tank is higher than 618mm (LIT-91101A); /
When the liquid level of the tank is lower than
375mm(LIT-91101A) it is caused to trip of oil
Low level for each lube-oil rundown tank When the liquid level of the tank is lower than
10 /
870mm (LIT-91102A)
Pump running for each stand-by pump
Start pump when the system pressure is lower than
11 1.5bar (PIT-91102A); or stop pump when the /
system pressure is higher than 2.5bar (PIT-91102A)

12 High differential pressure for each oil filter set 0.15 MPa (PDIT-91101A) /
13 High temperature alarm downstream the cooler >50℃(214-TT-91110) /
l
14 ○Requirements of API 614/ISO 10438-1.6.2.1.1 apply(6.3)
15
16 Shop inspection : Shop test
17 ○Compliance with inspector’s checklist(7.1) Required Witness
18 ○Required for system assemblies ●Cleanliness ■ □
19 ○Cleanliness prior to closure ●Used during shop test(7.3.1.2) ■ □
20 ○Required for major components ●Check controls □ □
21 ●Material certifications to be furnished ●Changeover filters/coolers ■ □
22 ○Special examinations ●One and two pump operation ■ □
23 ●Code construction /stamp ■/□ ●Sound level ■ □
24 ●Certified copies of all test logs and date ●Hydro test assembled system ■ □
25 ○Check pipe strain(7.3.1.4) ●Used for complete-unit test(7.3.1.3) □ □
26 ○Pipe radiography(5.1.3) ●Certified copies of all test logs and date □ □
27 ●Sound level recorded during test ■ □
28 Vendor’s Date:
29 ○Coordination meeting to be held within4-6 weeks after order commitment(8.1)
30
31 Comments:
32 0
33 0
0
34
0
35 0
36 0
37 0
38 0
0
39
0
40 0
41 0
42 0
0
0
Figure A.1-Datasheet-Scope and attachments-USC units(continued)

SHEET. 4 OF 4