LABOR AND MATERIALS

COST ESTIMATE

Project Information      
House Renovation      
Block 25 Lot 21 Paragon Village, Cabuco, Trece Martires 4109

Labor and Materials Cost Estimate


Additional
Description Original Cost Total
Ceiling and Division Work *Additional
 Hardie flex cost for 1
 Metal furring room
 Metal stud
 Door jamb and flush door (2rooms)
 Insulation foam

59,000 14,000 73,000


 Electrical Work
 Electrical wire
 Outlet
 Switch 12,000 3,000 15,000
Tiles Work (1st floor and 2nd floor)
 Tiles
 Tiles adhesive
 Grout
 Cement
 White sand 55,000 0 55,000
 Paint Work (1st floor and 2nd floor)
 Wall putty
 Skim coat
 Gauze
 Flat latex and gloss latex
 Neutralizer 45,000 10,000 55,000
Canopy and Fence Work (Front and Back Side) *Additional 65,000
 Angle bar 1 ½ x 1 ½x6m 3/8 cost for plain
 Angle bar 1x1x6m 1.5mm sheet and
 Tubular 1x2x6m 1.5mm 57,000 fence for
 Tubular 1x1x6m 1.5mm side part of
 Steel matting ¼ the house

Block 35 Lot 63, Paragon Village, Trece Martires City 4109 0970-5510-692
A4constructionofficial@gmail.com
fb:
Armando Loquiano
 Color Roof 0.4mm
 Gutter 0.4mm
 Plain Sheet 0.4mm
 C Purlins 1.5mm
 CHB
 Cement
8,000
 White Sand
 Teks Screw
 Sealant
 Welding rod
 PVC #3
 Elbow #3
 Blue pipe ½
Cabinet (for 2 rooms) *Additional
 Marine plywood ¾ cost for
 Good lumber 1 x 1 cabinet in
 Good lumber ½ x 1 another 1
 Hinges cabinet room 
 Magnetic catches
 Stickwel  26,000 13,000 39,000
Additional work
TV Rack with storage 23,000 23,000
Additional work
Waterproofing 4,000 4,000
Additional work
Steel Deck 4,000 4,000

Total Price 254,000 79,000 333,000