PROYEK : Bangunan TM Ex Pre Treatment

LOKASI : Tarjun
KONSULTAN : INHOUSE CORE DESIGN TEAM
B
TAHUN : 2020
O
REV : 0/1/2/3 B
B
O
O
T
S CURV - TIME SCHEDULE Mei 2021 B
O
M Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 Week 9 Week 10 Week 11 Week 12 Week 13 Week 14 Week 15 Week 16 Week 17 Week 18
NO. ITEM PEKERJAAN T BOBOT TOTAL
A 5-Jun-21 12-Jun-21 19-Jun-21 26-Jun-21 3-Jul-21 10-Jul-21 17-Jul-21 24-Jul-21 31-Jul-21 6-Aug-21 12-Aug-21 18-Aug-21 25-Aug-21 1-Sep-21 8-Sep-21 15-Sep-21 22-Sep-21 29-Sep-21
U
T
P S/d S/d S/d S/d S/d S/d S/d S/d S/d S/d S/d S/d S/d S/d S/d S/d S/d S/d
E
A 11-Jun-21 18-Jun-21 25-Jun-21 2-Jul-21 9-Jul-21 16-Jul-21 23-Jul-21 30-Jul-21 5-Aug-21 11-Aug-21 17-Aug-21 24-Aug-21 31-Aug-21 7-Sep-21 14-Sep-21 21-Sep-21 28-Sep-21 5-Oct-21
R
H
I
A. PEKERJAAN PERSIAPAN ###
### 11.334% 0.630% 0.630% 0.630% 0.630% 0.630% 0.630% 0.630% 0.630% 0.630% 0.630% 0.630% 0.630% 0.630% 0.630% 0.630% 0.630% 0.630% 0.630%
A
L

B. PEKERJAAN PENDUKUNG PELAKSANAAN ###


### 4.829% 0.268% 0.268% 0.268% 0.268% 0.268% 0.268% 0.268% 0.268% 0.268% 0.268% 0.268% 0.268% 0.268% 0.268% 0.268% 0.268% 0.268% 0.268%

C. PEKERJAAN STRUKTUR :
C.1 PEKERJAAN STRUKTUR BAWAH ###
### 16.983% 0.015439 0.015439 0.015439 0.015439 0.01543886 0.015439 0.015439 0.015439 0.015439 0.015439 0.015439

Fabrikasi di site Erection


C.2 PEKERJAAN STRUKTUR BAJA ###
### 32.706% 0.02973275 0.029733 0.029733 0.029733 0.029733 0.029733 0.029733 0.029733 0.029733 0.029733 0.029733

D. PEKERJAAN ARSITEKTUR ###


### 24.456% 0.027174 0.027174 0.027174 0.027174 0.027174 0.027174 0.027174 0.027174 0.027174

E. HEAVY EQUIPMENT ###


### 9.692% 0.032308 0.032308 0.032308

Total Bangunan TM Ex Pre Treatment ###


### 100.000%
PLAN 0.898% 2.442% 2.442% 2.442% 2.442% 5.415% 5.415% 5.415% 5.415% 8.132% 8.132% 8.132% 6.589% 6.589% 6.589% 9.819% 6.846% 6.846%
PLAN CUMMULATIVE 0.898% 3.340% 5.782% 8.223% 10.665% 16.080% 21.495% 26.910% 32.326% 40.458% 48.590% 56.723% 63.311% 69.900% 76.489% 86.308% 93.154% 100.000%
ACTUAL 1.317% 4.092% 1.792% 4.600% 4.000% 3.000% 3.000% 3.662% 1.501% 2.000% 2.000% 2.000% 8.247%
ACTUAL CUMMULATIVE ### 1.317% 5.409% 7.201% 11.800% 15.800% 18.800% 21.800% 22.499% 24.000% 26.000% 28.000% 40.401% 48.648%
DEVIATION 0.419% 2.069% 1.419% 3.577% 5.135% 2.720% 0.305% -4.411% -8.326% -14.458% -20.590% -16.322% -14.664%

Page 1 of 15
RENCANA ANGGARAN BIAYA

PROYEK : Bangunan TM Ex Pre Treatment


LOKASI : Tarjun
KONSULTAN : INHOUSE CORE DESIGN TEAM
TAHUN : 2020
REV : 0/1/2/3
Rekapitulasi

BOBOT BOBOT BOBOT PROGRESS S/D BLN LALU PROGRESS S/D BLN INI PROGRESS BLN INI
NO. ITEM PEKERJAAN MATERIAL UPAH TOTAL

A. PEKERJAAN PERSIAPAN 0.000% 11.334% 11.334% 50.316% 5.703% 65.000% 7.367% 14.684% 1.664%

B. PEKERJAAN PENDUKUNG PELAKSANAAN 0.000% 4.829% 4.829% 50.421% 2.435% 65.000% 3.139% 14.579% 0.704%

C. PEKERJAAN STRUKTUR

C.1 PEKERJAAN STRUKTUR BAWAH 13.019% 3.964% 16.983% 87.156% 14.801% 88.991% 15.113% 1.835% 0.312%

C.2 PEKERJAAN STRUKTUR BAJA 23.415% 9.291% 32.706% 47.440% 15.516% 65.179% 21.317% 17.738% 5.801%

D. PEKERJAAN ARSITEKTUR 18.268% 6.188% 24.456% 0.588% 0.144% 1.176% 0.288% 0.588% 0.144%

E. HEAVY EQUIPMENT 0.000% 9.692% 9.692% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%

Total Bangunan TM Ex Pre Treatment 1 Ls 54.702% 45.298% 100.000% 40.401% 40.401% 48.648% 48.648% 8.247% 8.247%

Disetujui Oleh: Diperiksa Oleh: Dibuat Oleh:


PT. SMART Tbk PT. SMEC Denka Indonesia PT. Paramita Bangun Sarana Tbk

Riyadi Sibarani Suriadi Ridwan Sain


Project Manager Construction Manager Site Manager
Page 2 of 15
RENCANA ANGGARAN BIAYA
PROYEK : Bangunan TM Ex Pre Treatment
LOKASI : Tarjun
PEMBERI TUGAS : INHOUSE CORE DESIGN TEAM
TAHUN : 2020
REVISI : 0/1/2/3
Detail

BOBOT BOBOT PROGRESS S/D BLN LALU PROGRESS S/D BLN INI PROGRESS BLN INI
NO. ITEM PEKERJAAN UNIT VOLUME KETERANGAN MATERIAL UPAH
BOBOT TOTAL

A. PEKERJAAN PERSIAPAN

1 Mobilisasi dan Demobilisasi Peralatan Kerja,Material Kerja,Tenaga Kerja, Dll Ls 1.00 0.000% 6.038% 6.038% 50.000% 3.019% 65.000% 3.925% 15.000% 0.906%
2 Direksi Keet / Workshop , Area kerja, dan bedeng pekerja Ls 1.00 0.000% 1.738% 1.738% 50.421% 0.877% 65.000% 1.130% 14.579% 0.253%
3 Shop Drawing & As Build Drawing Ls 1.00 0.000% 0.693% 0.693% 50.421% 0.350% 65.000% 0.451% 14.579% 0.101%
4 Perlengkapan safety untuk tenaga kerja seperti helm, Sepatu Seafty, dll. Ls 1.00 0.000% 2.863% 2.863% 50.421% 1.444% 65.000% 1.861% 14.579% 0.417%
5 Test Covid Ls -

B. PEKERJAAN PENDUKUNG PELAKSANAAN

1 Site Management Ls -
2 Air dan Listrik Kerja Selama Masa Pelaksanaan Ls 1.00 Power Supply By SMART 0.000% 2.952% 2.952% 50.421% 1.488% 65.000% 1.919% 14.579% 0.430%
3 Kebersihan dan Keamanan Proyek Selama Masa Pelaksanaan bulan 4.00 0.000% 1.136% 1.136% 50.421% 0.573% 65.000% 0.739% 14.579% 0.166%
4 Peralatan utama dan peralatan pendukung Ls 1.00 0.000% 0.741% 0.741% 50.421% 0.374% 65.000% 0.482% 14.579% 0.108%

C. PEKERJAAN STRUKTUR

C.1 PEKERJAAN STRUKTUR BAWAH

1 Pekerjaan Pemancangan Pcs 22.00


- Pemotongan Pancang Pcs 22.00 0.000% 0.162% 0.162% 100.000% 0.162% 100.000% 0.162% 0.000% 0.000%
Pile Head Treatment (PHT)
- Concrete fc' 25 Mpa m3 2.69 0.134% 0.010% 0.145% 100.000% 0.145% 100.000% 0.145% 0.000% 0.000%
- Rebar 4 - Ø8 (Hanger) kg 58.08 0.020% 0.003% 0.024% 100.000% 0.024% 100.000% 0.024% 0.000% 0.000%
- Rebar Ø10 - 75 (Spiral) kg 612.77 0.212% 0.036% 0.248% 100.000% 0.248% 100.000% 0.248% 0.000% 0.000%
- Rebar 8 - D16 (Tulangan Utama) kg 520.01 0.180% 0.031% 0.211% 100.000% 0.211% 100.000% 0.211% 0.000% 0.000%
- Rebar D16 (Ties) kg 428.24 0.148% 0.025% 0.173% 100.000% 0.173% 100.000% 0.173% 0.000% 0.000%
- Plate 2 mm kg 36.33 0.015% 0.007% 0.022% 100.000% 0.022% 100.000% 0.022% 0.000% 0.000%

BANGUNAN UTAMA

- Excavation Soil Existing m3 688.20 0.000% 0.847% 0.847% 100.000% 0.847% 100.000% 0.847% 0.000% 0.000%

2 Pekerjaan Pondasi Tipe-1 (PC 2) (2000 x 800) Pcs 8.00


- Excavation m3 62.64 0.000% 0.077% 0.077% 100.000% 0.077% 100.000% 0.077% 0.000% 0.000%
- Backfilling and Compacted m3 50.89 0.000% 0.063% 0.063% 100.000% 0.063% 100.000% 0.063% 0.000% 0.000%
- Soil Disposal m3 11.75 0.000% 0.007% 0.007% 100.000% 0.007% 100.000% 0.007% 0.000% 0.000%
- Compacted Sand t = 50 mm m3 0.76 0.007% 0.001% 0.008% 100.000% 0.008% 100.000% 0.008% 0.000% 0.000%
- Lean Concrete t = 50mm m3 0.76 0.024% 0.006% 0.030% 100.000% 0.030% 100.000% 0.030% 0.000% 0.000%
- Formwork m2 35.84 0.106% 0.057% 0.163% 100.000% 0.163% 100.000% 0.163% 0.000% 0.000%
- Rebar D13 - 100 kg 96.65 0.033% 0.006% 0.039% 100.000% 0.039% 100.000% 0.039% 0.000% 0.000%
- Rebar D16 - 100 kg 894.97 0.310% 0.053% 0.363% 100.000% 0.363% 100.000% 0.363% 0.000% 0.000%
- Rebar D19 - 100 kg 1,263.16 0.437% 0.074% 0.512% 100.000% 0.512% 100.000% 0.512% 0.000% 0.000%
- Concrete fc' 25 Mpa m3 10.24 0.512% 0.039% 0.551% 100.000% 0.551% 100.000% 0.551% 0.000% 0.000%

3 Pekerjaan Pile Cap 2 (PC 2) (2000 x 1850) Pcs 2.00


- Excavation m3 19.92 0.000% 0.025% 0.025% 100.000% 0.025% 100.000% 0.025% 0.000% 0.000%
- Backfilling and Compacted m3 15.05 0.000% 0.019% 0.019% 100.000% 0.019% 100.000% 0.019% 0.000% 0.000%
- Soil Disposal m3 4.87 0.000% 0.003% 0.003% 100.000% 0.003% 100.000% 0.003% 0.000% 0.000%
- Compacted Sand t = 50 mm m3 0.30 0.003% 0.000% 0.003% 100.000% 0.003% 100.000% 0.003% 0.000% 0.000%
- Lean Concrete t = 50mm m3 0.30 0.010% 0.002% 0.012% 100.000% 0.012% 100.000% 0.012% 0.000% 0.000%
- Formwork m2 10.52 0.031% 0.017% 0.048% 100.000% 0.048% 100.000% 0.048% 0.000% 0.000%
- Rebar 2 - D13 kg 15.10 0.005% 0.001% 0.006% 100.000% 0.006% 100.000% 0.006% 0.000% 0.000%
- Rebar D16 - 100 kg 252.71 0.087% 0.015% 0.102% 100.000% 0.102% 100.000% 0.102% 0.000% 0.000%
- Rebar D19 - 100 kg 356.67 0.123% 0.021% 0.144% 100.000% 0.144% 100.000% 0.144% 0.000% 0.000%
- Concrete fc' 25 Mpa m3 4.27 0.213% 0.016% 0.230% 100.000% 0.230% 100.000% 0.230% 0.000% 0.000%

Page 3 of 15
4 Pekerjaan Pile Cap 3 (PC 3) (1000 x 1000) Pcs 1.00

Page 4 of 15
- Excavation m3 2.40 0.000% 0.003% 0.003% 100.000% 0.003% 100.000% 0.003% 0.000% 0.000%
- Backfilling and Compacted m3 1.80 0.000% 0.002% 0.002% 100.000% 0.002% 100.000% 0.002% 0.000% 0.000%
- Soil Disposal m3 0.60 0.000% 0.000% 0.000% 100.000% 0.000% 100.000% 0.000% 0.000% 0.000%
- Cerucuk Dolken Dia 100 cm, 6 m pic 9.00 0.167% 0.042% 0.209% 100.000% 0.209% 100.000% 0.209% 0.000% 0.000%
- Compacted Sand t = 50 mm m3 0.05 0.000% 0.000% 0.001% 100.000% 0.001% 100.000% 0.001% 0.000% 0.000%
- Lean Concrete t = 50mm m3 0.05 0.002% 0.000% 0.002% 100.000% 0.002% 100.000% 0.002% 0.000% 0.000%
- Formwork m2 2.00 0.006% 0.003% 0.009% 100.000% 0.009% 100.000% 0.009% 0.000% 0.000%
- Rebar D13 - 300 kg 41.18 0.014% 0.002% 0.017% 100.000% 0.017% 100.000% 0.017% 0.000% 0.000%
- Concrete fc' 25 Mpa m3 0.50 0.025% 0.002% 0.027% 100.000% 0.027% 100.000% 0.027% 0.000% 0.000%

5 Colom 1 (C1) (400 x 400) Pcs 10.00


- Formwork m2 68.80 0.203% 0.110% 0.313% 100.000% 0.313% 100.000% 0.313% 0.000% 0.000%
- Rebar 12 - D22 kg 1,298.09 0.449% 0.077% 0.526% 100.000% 0.526% 100.000% 0.526% 0.000% 0.000%
- Rebar D10 - 100 kg 331.45 0.115% 0.020% 0.134% 100.000% 0.134% 100.000% 0.134% 0.000% 0.000%
- Concrete fc' 25 Mpa m3 3.44 0.172% 0.013% 0.185% 100.000% 0.185% 100.000% 0.185% 0.000% 0.000%
- Grouting Ls 10.00 0.131% 0.131% 0.263% 0.000% 0.000% 100.000% 0.263% 100.000% 0.263%

6 Colom 2 (C2) (225 x 350) Pcs 1.00


- Formwork m2 4.08 0.012% 0.007% 0.019% 100.000% 0.019% 100.000% 0.019% 0.000% 0.000%
- Rebar 6 - D16 kg 25.03 0.009% 0.001% 0.010% 100.000% 0.010% 100.000% 0.010% 0.000% 0.000%
- Rebar D10 - 150 kg 7.99 0.003% 0.000% 0.003% 100.000% 0.003% 100.000% 0.003% 0.000% 0.000%
- Concrete fc' 25 Mpa m3 0.13 0.007% 0.001% 0.007% 100.000% 0.007% 100.000% 0.007% 0.000% 0.000%
- Grouting Ls 1.00 0.006% 0.002% 0.008% 0.000% 0.000% 100.000% 0.008% 100.000% 0.008%

7 Tie Beam 1 (TB1) (300 x 600) m 54.40


- Compacted Sand t = 50 mm m3 0.82 0.008% 0.001% 0.009% 100.000% 0.009% 100.000% 0.009% 0.000% 0.000%
- Lean Concrete t = 50mm m3 0.82 0.026% 0.006% 0.032% 100.000% 0.032% 100.000% 0.032% 0.000% 0.000%
- Formwork m2 65.28 0.192% 0.105% 0.297% 100.000% 0.297% 100.000% 0.297% 0.000% 0.000%
- Rebar 8 - D16 kg 770.28 0.267% 0.045% 0.312% 100.000% 0.312% 100.000% 0.312% 0.000% 0.000%
- Rebar Ø10 - 150/200 kg 433.93 0.150% 0.026% 0.176% 100.000% 0.176% 100.000% 0.176% 0.000% 0.000%
- Concrete fc' 25 Mpa m3 9.79 0.490% 0.038% 0.527% 100.000% 0.527% 100.000% 0.527% 0.000% 0.000%

8 Tie Beam 1A (TB1A) (300 x 600) m 26.40


- Excavation m3 5.54 0.000% 0.007% 0.007% 100.000% 0.007% 100.000% 0.007% 0.000% 0.000%
- Compacted Sand t = 50 mm m3 0.40 0.004% 0.000% 0.004% 100.000% 0.004% 100.000% 0.004% 0.000% 0.000%
- Lean Concrete t = 50mm m3 0.40 0.013% 0.003% 0.016% 100.000% 0.016% 100.000% 0.016% 0.000% 0.000%
- Formwork m2 31.68 0.093% 0.051% 0.144% 100.000% 0.144% 100.000% 0.144% 0.000% 0.000%
- Rebar 8 - D16 kg 380.97 0.132% 0.022% 0.154% 100.000% 0.154% 100.000% 0.154% 0.000% 0.000%
- Rebar Ø10 - 150/200 kg 211.15 0.073% 0.012% 0.086% 100.000% 0.086% 100.000% 0.086% 0.000% 0.000%
- Concrete fc' 25 Mpa m3 4.75 0.238% 0.018% 0.256% 100.000% 0.256% 100.000% 0.256% 0.000% 0.000%

9 Tie Beam 2 (TB2) (250 x 400) m 16.35


- Compacted Sand t = 50 mm m3 0.20 0.002% 0.000% 0.002% 100.000% 0.002% 100.000% 0.002% 0.000% 0.000%
- Lean Concrete t = 50mm m3 0.20 0.007% 0.002% 0.008% 100.000% 0.008% 100.000% 0.008% 0.000% 0.000%
- Formwork m2 13.08 0.039% 0.021% 0.060% 100.000% 0.060% 100.000% 0.060% 0.000% 0.000%
- Rebar 6 - D16 kg 264.35 0.092% 0.016% 0.107% 100.000% 0.107% 100.000% 0.107% 0.000% 0.000%
- Rebar Ø10 - 200 kg 73.23 0.025% 0.004% 0.030% 100.000% 0.030% 100.000% 0.030% 0.000% 0.000%
- Concrete fc' 25 Mpa m3 1.64 0.082% 0.006% 0.088% 100.000% 0.088% 100.000% 0.088% 0.000% 0.000%

10 Tie Beam 3 (TB3) (250 x 400) m 26.40


- Excavation m3 4.62 0.000% 0.006% 0.006% 100.000% 0.006% 100.000% 0.006% 0.000% 0.000%
- Compacted Sand t = 50 mm m3 0.26 0.003% 0.000% 0.003% 100.000% 0.003% 100.000% 0.003% 0.000% 0.000%
- Lean Concrete t = 50mm m3 0.26 0.008% 0.002% 0.010% 100.000% 0.010% 100.000% 0.010% 0.000% 0.000%
- Formwork m2 21.12 0.062% 0.034% 0.096% 100.000% 0.096% 100.000% 0.096% 0.000% 0.000%
- Rebar 6 - D16 kg 337.87 0.117% 0.020% 0.137% 100.000% 0.137% 100.000% 0.137% 0.000% 0.000%
- Rebar Ø10 - 200 kg 94.12 0.033% 0.006% 0.038% 100.000% 0.038% 100.000% 0.038% 0.000% 0.000%
- Concrete fc' 25 Mpa m3 2.64 0.132% 0.010% 0.142% 100.000% 0.142% 100.000% 0.142% 0.000% 0.000%

11 Tie Beam 4 (TB4) (200 x 300) m 9.05


- Compacted Sand t = 50 mm m3 0.09 0.001% 0.000% 0.001% 100.000% 0.001% 100.000% 0.001% 0.000% 0.000%
- Lean Concrete t = 50mm m3 0.09 0.003% 0.001% 0.004% 100.000% 0.004% 100.000% 0.004% 0.000% 0.000%
- Formwork m2 5.43 0.016% 0.009% 0.025% 100.000% 0.025% 100.000% 0.025% 0.000% 0.000%
- Rebar 6 - D16 kg 115.23 0.040% 0.007% 0.047% 100.000% 0.047% 100.000% 0.047% 0.000% 0.000%
- Rebar Ø10 - 200 kg 29.00 0.010% 0.002% 0.012% 100.000% 0.012% 100.000% 0.012% 0.000% 0.000%
- Concrete fc' 25 Mpa m3 0.54 0.027% 0.002% 0.029% 100.000% 0.029% 100.000% 0.029% 0.000% 0.000%

12 Cable Trench m 26.97


- Compacted Sand t = 50 mm m3 1.35 0.013% 0.002% 0.015% 100.000% 0.015% 100.000% 0.015% 0.000% 0.000%
- Lean Concrete t = 50mm m3 1.35 0.043% 0.010% 0.054% 100.000% 0.054% 100.000% 0.054% 0.000% 0.000%
- Formwork m2 29.81 0.088% 0.048% 0.136% 100.000% 0.136% 100.000% 0.136% 0.000% 0.000%
Page 5 of 15
- Wiremesh M8 - 150, 2 Layer m2 56.78 0.257% 0.052% 0.310% 100.000% 0.310% 100.000% 0.310% 0.000% 0.000%

Page 6 of 15
- Concrete fc' 25 Mpa m3 8.52 0.426% 0.033% 0.459% 100.000% 0.459% 100.000% 0.459% 0.000% 0.000%
- L 50x50x5 (3.77 kg/m) kg 735.89 0.302% 0.302% 0.604% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Pekerjaan Dynabolt M12-300 pic 180.00 0.220% 0.028% 0.247% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Pengecetan Rangka Baja(Cat Tebal 250 micron + Sandblast SA 2,5) m² 52.52 0.168% 0.101% 0.269% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Chequered Plate t=4.5mm m2 33.00 0.584% 0.127% 0.711% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%

13 Slab m2 151.74
- Sirtu t = 500 mm m3 66.62 0.640% 0.082% 0.722% 100.000% 0.722% 100.000% 0.722% 0.000% 0.000%
- Wiremesh M8 - 150, 2 Layer m2 151.74 0.687% 0.140% 0.827% 100.000% 0.827% 100.000% 0.827% 0.000% 0.000%
- Concrete fc' 25 Mpa m3 22.76 1.138% 0.088% 1.226% 100.000% 1.226% 100.000% 1.226% 0.000% 0.000%

14 Pekerjaan Selasar m2 46.33


- Sirtu t = 500 m m3 14.29 0.137% 0.018% 0.155% 100.000% 0.155% 100.000% 0.155% 0.000% 0.000%
- Wiremesh M8 - 150, 1 Layer m2 46.33 0.105% 0.021% 0.126% 100.000% 0.126% 100.000% 0.126% 0.000% 0.000%
- Formwork m3 26.35 0.078% 0.042% 0.120% 100.000% 0.120% 100.000% 0.120% 0.000% 0.000%
- Concrete fc' 25 Mpa m3 6.95 0.348% 0.027% 0.374% 100.000% 0.374% 100.000% 0.374% 0.000% 0.000%

15 Pekerjaan Ramp / Tangga m2 3.96


- Sirtu t = 500 m m3 1.98 0.019% 0.002% 0.021% 100.000% 0.021% 100.000% 0.021% 0.000% 0.000%
- Wiremesh M8 - 150, 1 Layer m2 3.96 0.009% 0.002% 0.011% 100.000% 0.011% 100.000% 0.011% 0.000% 0.000%
- Formwork m3 5.72 0.017% 0.009% 0.026% 100.000% 0.026% 100.000% 0.026% 0.000% 0.000%
- Concrete fc' 25 Mpa m3 0.59 0.030% 0.002% 0.032% 100.000% 0.032% 100.000% 0.032% 0.000% 0.000%

16 Paving Block (EL. -0.550) m2 70.62


- Backfilling and Compacted m3 14.12 Estimasi 20 cm 0.000% 0.017% 0.017% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Compacted Sand t = 50 mm m3 3.53 0.034% 0.004% 0.038% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Paving Block Light Duty 8 cm m2 70.62 0.413% 0.130% 0.543% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Bak Kontrol 1000x100 Unit 3.00 0.506% 0.099% 0.605% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%

17 Pekerjaan Pondasi Trafo m2 9.00


- Rebar D16 - 200 m2 119.21 0.041% 0.007% 0.048% 100.000% 0.048% 100.000% 0.048% 0.000% 0.000%
- Concrete fc' 25 Mpa m3 2.25 0.113% 0.009% 0.121% 100.000% 0.121% 100.000% 0.121% 0.000% 0.000%
- Steel Gratings Hot Dip Galvanized 25x5 / 30x100 m2 5.36 0.289% 0.038% 0.326% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%

C.2 PEKERJAAN STRUKTUR BAJA

BANGUNAN UTAMA

1 Kolom rencana HB 300x300x10x15 (K1)


- HB 300x300x10x15 (94 kg/m)) kg 6,094.49 2.735% 1.172% 3.907% 99.000% 3.868% 100.000% 3.907% 1.000% 0.039%
- End Plate 15 mm kg 129.82 0.053% 0.025% 0.078% 99.000% 0.077% 100.000% 0.078% 1.000% 0.001%
- Base Plate 15 mm + Stiffner 10 mm kg 302.91 0.124% 0.058% 0.183% 99.000% 0.181% 100.000% 0.183% 1.000% 0.002%
- Anchor Bolt 6-M24, L = 850 pic 60.00 0.512% 0.102% 0.615% 99.000% 0.609% 100.000% 0.615% 1.000% 0.006%
- Pengecetan Rangka Baja(Cat Tebal 250 micron + Sandblast SA 2,5) m2 109.62 0.351% 0.211% 0.562% 75.000% 0.422% 90.000% 0.506% 15.000% 0.084%

2 Kolom rencana WF 250x125x6x9 (K2)


- WF 250x125x6x9 (29.6 kg/m)) kg 1,826.59 0.749% 0.351% 1.101% 99.000% 1.090% 100.000% 1.101% 1.000% 0.011%
- Base Plate 15 mm kg 336.57 0.138% 0.065% 0.203% 99.000% 0.201% 100.000% 0.203% 1.000% 0.002%
- Base Plate 10 mm + Stiffner 10 mm kg 6.32 0.003% 0.001% 0.004% 99.000% 0.004% 100.000% 0.004% 1.000% 0.000%
- HTB 2X3-M22 pic 66.00 0.049% 0.010% 0.059% 99.000% 0.059% 100.000% 0.059% 1.000% 0.001%
- Anchor Bolt 6-M16 L=640 pic 6.00 0.027% 0.005% 0.032% 99.000% 0.032% 100.000% 0.032% 1.000% 0.000%
- Pengecetan Rangka Baja(Cat Tebal 250 micron + Sandblast SA 2,5) m2 53.71 0.172% 0.103% 0.275% 75.000% 0.207% 95.000% 0.262% 20.000% 0.055%

3 Balok rencana WF 350x175x7x11 (B1)


- WF 350x175x7x11 (49.6 kg/m) kg 429.14 0.193% 0.083% 0.275% 99.000% 0.272% 100.000% 0.275% 1.000% 0.003%
- Connection Plate 12 mm kg 22.09 0.009% 0.004% 0.013% 99.000% 0.013% 100.000% 0.013% 1.000% 0.000%
- Stiffner Plate 10 mm kg 60.80 0.025% 0.012% 0.037% 99.000% 0.036% 100.000% 0.037% 1.000% 0.000%
- HTB 2X6-M16 pic 24.00 0.013% 0.004% 0.017% 99.000% 0.017% 100.000% 0.017% 1.000% 0.000%
- Pengecetan Rangka Baja(Cat Tebal 250 micron + Sandblast SA 2,5) m2 13.12 0.042% 0.025% 0.067% 75.000% 0.050% 95.000% 0.064% 20.000% 0.013%

4 Balok rencana WF 300x150x6.5x9 (B2)


- WF 300x150x6.5x9 (36.7 kg/m) kg 4,161.44 1.867% 0.800% 2.668% 99.000% 2.641% 100.000% 2.668% 1.000% 0.027%
- Connection Plate 10 mm kg 81.95 0.034% 0.016% 0.049% 99.000% 0.049% 100.000% 0.049% 1.000% 0.000%
- Stiffner Plate 10 mm kg 169.56 0.070% 0.033% 0.102% 99.000% 0.101% 100.000% 0.102% 1.000% 0.001%
- Stiffner Plate 8 mm kg 42.39 0.017% 0.008% 0.026% 99.000% 0.025% 100.000% 0.026% 1.000% 0.000%
- HTB 2X6-M16 pic 288.00 0.157% 0.044% 0.201% 99.000% 0.199% 100.000% 0.201% 1.000% 0.002%
- Pengecetan Rangka Baja(Cat Tebal 250 micron + Sandblast SA 2,5) m2 139.95 0.449% 0.269% 0.718% 75.000% 0.538% 100.000% 0.718% 25.000% 0.179%

5 Balok rencana WF 200x100x5.5x8 (B3)


- WF 200x100x5.5x8 (21.3 kg/m) kg 2,349.11 0.964% 0.452% 1.415% 99.000% 1.401% 100.000% 1.415% 1.000% 0.014%

Page 7 of 15
- Connection Plate 8 mm kg 112.07 0.046% 0.022% 0.068% 99.000% 0.067% 100.000% 0.068% 1.000% 0.001%
- HTB 2X3-M16 pic 306.00 0.166% 0.047% 0.213% 99.000% 0.211% 100.000% 0.213% 1.000% 0.002%
- Pengecetan Rangka Baja(Cat Tebal 250 micron + Sandblast SA 2,5) m2 90.01 0.289% 0.173% 0.462% 75.000% 0.346% 75.000% 0.346% 0.000% 0.000%

6 Lantai 2 (Thk 150 mm) EL. +6.950 m2 148.50


- Bondek, Thk : 0.75 mm m2 148.50 0.876% 0.238% 1.114% 99.000% 1.103% 100.000% 1.114% 1.000% 0.011%
- Sheer Connector 2xD13-200 kg 194.80 0.080% 0.037% 0.117% 100.000% 0.117% 100.000% 0.117% 0.000% 0.000%
- Wiremesh M8-150, 2 Layer m2 148.50 0.672% 0.137% 0.810% 100.000% 0.810% 100.000% 0.810% 0.000% 0.000%
- Lantai Beton m3 22.28 1.114% 0.086% 1.199% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%

7 Balok atap WF 250x125x6x9 (B8)


- WF 250x125x6x9 (29.6 kg/m) kg 1,511.08 0.620% 0.291% 0.911% 99.000% 0.901% 100.000% 0.911% 1.000% 0.009%
- Connection Plate 10 mm kg 75.36 0.031% 0.014% 0.045% 99.000% 0.045% 100.000% 0.045% 1.000% 0.000%
- Stiffner Plate 8 mm kg 61.54 0.025% 0.012% 0.037% 99.000% 0.037% 100.000% 0.037% 1.000% 0.000%
- HTB 2X5-M16 pic 160.00 0.087% 0.025% 0.112% 99.000% 0.110% 100.000% 0.112% 1.000% 0.001%
- Pengecetan Rangka Baja(Cat Tebal 250 micron + Sandblast SA 2,5) m2 52.99 0.170% 0.102% 0.272% 75.000% 0.204% 95.000% 0.258% 20.000% 0.054%

8 Rafter atap WF 250x125x6x9 (R1)


- WF 250x125x6x9 (29.6 kg/m) kg 1,909.70 0.783% 0.367% 1.151% 99.000% 1.139% 100.000% 1.151% 1.000% 0.012%
- Connection Plate 10 mm kg 108.33 0.044% 0.021% 0.065% 99.000% 0.065% 100.000% 0.065% 1.000% 0.001%
- Stiffner Plate 8 mm kg 88.47 0.036% 0.017% 0.053% 99.000% 0.053% 100.000% 0.053% 1.000% 0.001%
- HTB 2X5-M16 pic 224.00 0.122% 0.034% 0.156% 99.000% 0.155% 100.000% 0.156% 1.000% 0.002%
- Pengecetan Rangka Baja(Cat Tebal 250 micron + Sandblast SA 2,5) m2 67.31 0.216% 0.129% 0.345% 75.000% 0.259% 95.000% 0.328% 20.000% 0.069%

9 Atap Bangunan Utama EL. +12.085


- Gording CNP 150x50x2.3 (4.96 kg/m) kg 1,308.55 0.537% 0.252% 0.788% 0.000% 0.000% 100.000% 0.788% 100.000% 0.788%
- Ikatan Angin D16 kg 121.66 0.050% 0.023% 0.073% 0.000% 0.000% 100.000% 0.073% 100.000% 0.073%
- Sagrod Ø12 kg 70.76 0.029% 0.014% 0.043% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Pengecetan Rangka Baja(Cat Tebal 250 micron + Sandblast SA 2,5) m2 131.91 0.423% 0.254% 0.676% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Atap Lysaght Trimdek Optima Colorbond XRW 0.4 BMT m² 265.67 1.260% 0.204% 1.465% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%

10 Talang (uk 550 x 320)


- UNP 150x75x6.5 (18.6 kg/m) kg 723.95 0.297% 0.139% 0.436% 50.000% 0.218% 50.000% 0.218% 0.000% 0.000%
- L 50x50x5 @500 (3.77 kg/m) kg 385.24 0.158% 0.074% 0.232% 50.000% 0.116% 50.000% 0.116% 0.000% 0.000%
- Zincalum t=1.5mm m² 49.20 0.233% 0.038% 0.271% 50.000% 0.136% 50.000% 0.136% 0.000% 0.000%
- Down Pipe 4" D L=12.905 (8 Unit) Connect to Bak Kontrol Titik 8.00 PVC D 0.283% 0.088% 0.371% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Roofdrain 4" SS Pcs 8.00 0.113% 0.023% 0.135% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%

TANGGA

1 Balok rencana WF 200x100x5.5x8 (B3) (Bordes)


- WF 200x100x5.5x8 (21.3 kg/m) kg 137.39 0.056% 0.026% 0.083% 0.000% 0.000% 35.000% 0.029% 35.000% 0.029%
- Connection Plate 8 mm kg 3.24 0.001% 0.001% 0.002% 0.000% 0.000% 35.000% 0.001% 35.000% 0.001%
- HTB 2X3-M16 pic 12.00 0.007% 0.002% 0.008% 0.000% 0.000% 35.000% 0.003% 35.000% 0.003%
- Pengecetan Rangka Baja(Cat Tebal 250 micron + Sandblast SA 2,5) m2 5.21 0.017% 0.010% 0.027% 0.000% 0.000% 95.000% 0.025% 95.000% 0.025%

2 Balok Tangga UNP 150x75x6.5


- UNP 150x75x6.5 (18.6 kg/m) kg 792.27 0.325% 0.152% 0.477% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Base Plate 8 mm kg 3.14 0.001% 0.001% 0.002% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Dynabolt M16-1x2 pic 4.00 0.002% 0.001% 0.003% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Pengecetan Rangka Baja(Cat Tebal 250 micron + Sandblast SA 2,5) m2 22.37 0.072% 0.043% 0.115% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%

3 Anak tangga dan handrail


- Chequared Plate t=4.5mm (31 pic) Anak Tang m2 28.85 0.510% 0.111% 0.621% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- L 50x50x5 (3.77 kg/m) kg 368.14 0.151% 0.071% 0.222% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Handrail Pipe 1 1/2" m 68.83 Pipa Medium 0.164% 0.079% 0.244% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Handrail Pipe 1" m 34.83 Pipa Medium 0.052% 0.027% 0.079% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Pengecetan Rangka Baja(Cat Tebal 250 micron + Sandblast SA 2,5) m2 19.53 0.063% 0.038% 0.100% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%

BRIDGE

1 Struktur Piperack
- Balok B5 UNP 150x75x6.5 (18.6 kg/m) kg 1,215.51 0.499% 0.234% 0.732% 20.000% 0.146% 95.000% 0.696% 75.000% 0.549%
- Kolom K3 UNP 150x75x6.5 (18.6 kg/m) kg 638.35 0.262% 0.123% 0.385% 20.000% 0.077% 95.000% 0.365% 75.000% 0.288%
- Support S1 UNP 150x75x6.5 (18.6 kg/m) kg 689.28 0.283% 0.133% 0.415% 20.000% 0.083% 95.000% 0.395% 75.000% 0.312%
- Pengecetan Rangka Baja(Cat Tebal 250 micron + Sandblast SA 2,5) m2 82.04 0.263% 0.158% 0.421% 0.000% 0.000% 95.000% 0.400% 95.000% 0.400%

2 Struktur Walkway
- Balok B5 UNP 150x75x6.5 (18.6 kg/m) kg 385.02 0.158% 0.074% 0.232% 20.000% 0.046% 50.000% 0.116% 30.000% 0.070%
- Balok B6 WF 200x100x5.5x8 (21.3 kg/m) kg 911.68 0.374% 0.175% 0.549% 20.000% 0.110% 50.000% 0.275% 30.000% 0.165%

Page 8 of 15
- Balok B7 WF 250x125x6x9 (29.6 kg/m) kg 116.92 0.048% 0.022% 0.070% 20.000% 0.014% 50.000% 0.035% 30.000% 0.021%
- Pengaku S2 L 50x50x5 (3.77 kg/m) kg 68.54 0.028% 0.013% 0.041% 20.000% 0.008% 50.000% 0.021% 30.000% 0.012%
- Pengecetan Rangka Baja(Cat Tebal 250 micron + Sandblast SA 2,5) m2 54.25 0.174% 0.104% 0.278% 0.000% 0.000% 95.000% 0.264% 95.000% 0.264%

- Chequered Plate t=4.5mm m2 26.56 0.470% 0.102% 0.572% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Handrail Pipe 1 1/2" m 67.47 Pipa Medium 0.161% 0.078% 0.239% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Handrail Pipe 1" m 41.47 Pipa Medium 0.062% 0.032% 0.094% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%

3 Struktur Atap Walkway


- Kolom K3 UNP 150x75x6.5 (18.6 kg/m) kg 900.05 0.369% 0.173% 0.542% 0.000% 0.000% 95.000% 0.515% 95.000% 0.515%
- Balok B5 UNP 150x75x6.5 (18.6 kg/m) kg 779.56 0.320% 0.150% 0.470% 0.000% 0.000% 95.000% 0.446% 95.000% 0.446%
- Rafter R2 UNP 150x75x6.5 (18.6 kg/m) kg 619.11 0.254% 0.119% 0.373% 0.000% 0.000% 95.000% 0.354% 95.000% 0.354%
- Pengecetan Rangka Baja(Cat Tebal 250 micron + Sandblast SA 2,5) m2 74.15 0.238% 0.143% 0.380% 0.000% 0.000% 95.000% 0.361% 95.000% 0.361%

4 Atap Bridge
- Gording CNP 150x50x2.3 (4.96 kg/m) kg 335.42 0.138% 0.065% 0.202% 0.000% 0.000% 25.000% 0.051% 25.000% 0.051%
- Ikatan Angin D16 kg 58.94 0.024% 0.011% 0.036% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Sagrod Ø12 kg 18.69 0.008% 0.004% 0.011% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Pengecetan Rangka Baja(Cat Tebal 250 micron + Sandblast SA 2,5) m2 33.81 0.108% 0.065% 0.173% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Atap Lysaght Trimdek Optima Colorbond XRW 0.4 BMT m² 50.63 0.240% 0.039% 0.279% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%

D. PEKERJAAN ARSITEKTUR

EL. ±0.00

1 Pekerjaan Dinding dan Finishing


- Pas. Bata Ringan + kolom dan balok praktis m2 514.34 bata merah 1.714% 0.890% 2.605% 10.000% 0.260% 20.000% 0.521% 10.000% 0.260%
- Plesteran + Acian m2 1,028.68 0.528% 0.923% 1.451% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Cat Exterior Wheathershield m2 514.34 0.462% 0.264% 0.725% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Cat Interior Enamel m2 514.34 0.396% 0.264% 0.659% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%

2 Pekerjaan Pintu dan Jendela


- Rolling Door Manual Type unit 2.00 1.123% 0.169% 1.292% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Pintu Tipe-2 unit 3.00 2.615% 0.392% 3.008% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Lover Tipe-2 unit 8.00 1.190% 0.178% 1.368% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Wall Exhausfan type Industrial Cap. 2500CFM unit 9.00 exclude instalasi elektrikal 1.413% 0.212% 1.626% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%

3 Pekerjaan Lantai
- Homogenous Tile unpolish 600x600mm m2 93.79 plinth -deleted 0.842% 0.156% 0.998% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%

EL. +7.000

1 Pekerjaan Dinding dan Finishing


- Pas. Bata Ringan + kolom dan balok praktis m2 348.80 bata merah 1.163% 0.604% 1.766% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Plesteran + Acian m2 697.60 0.358% 0.626% 0.984% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Cat Exterior Wheathershield m2 348.80 0.313% 0.179% 0.492% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Cat Interior Enamel m2 348.80 0.268% 0.179% 0.447% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%

2 Pekerjaan Pintu dan Jendela


- Pintu Tipe-1 unit 2.00 0.831% 0.125% 0.955% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Jendela Tipe-1 unit 9.00 2.931% 0.441% 3.372% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%

3 Pekerjaan Lantai
- Homogenous Tile unpolish 600x600mm m2 148.50 plinth -deleted 1.333% 0.248% 1.580% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%

4 Gypsum Board Ceiling El +10.300


- Gypsum Board Ceiling,t=9mm + Metal Framing m² 176.00 0.790% 0.338% 1.128% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%

E. HEAVY EQUIPMENT Ls 1 0.000% 9.692% 9.692% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%

TOTAL Bangunan TM Ex Pre Treatment Ls 1 54.702% 45.298% 100.000% 40.401% 40.401% 48.648% 48.648% 8.247% 8.247%

Page 9 of 15
RENCANA ANGGARAN BIAYA
PROYEK : Bangunan TM Ex Pre Treatment
LOKASI : Tarjun
PEMBERI TUGAS : INHOUSE CORE DESIGN TEAM
TAHUN : 2020
REVISI : 0/1/2/3
Detail

BOBOT BOBOT KEBUTUHAN MANPOWER


NO. ITEM PEKERJAAN UNIT VOLUME KETERANGAN BOBOT TOTAL PROGRESS S/D BLN LALU PROGRESS S/D BLN INI PROGRESS BLN INI
MATERIAL UPAH SKILL HELPER equipment schedule
qty
A. PEKERJAAN PERSIAPAN

1 Mobilisasi dan Demobilisasi Peralatan Kerja,Material Kerja,Tenaga Kerja, Dll Ls 1.00 0.000% 6.038% 6.038% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
2 Direksi Keet / Workshop , Area kerja, dan bedeng pekerja Ls 1.00 0.000% 1.738% 1.738% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
3 Shop Drawing & As Build Drawing Ls 1.00 0.000% 0.693% 0.693% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
4 Perlengkapan safety untuk tenaga kerja seperti helm, Sepatu Seafty, dll. Ls 1.00 0.000% 2.863% 2.863% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
5 Test Covid Ls -

B. PEKERJAAN PENDUKUNG PELAKSANAAN

1 Site Management Ls -
2 Air dan Listrik Kerja Selama Masa Pelaksanaan Ls 1.00 Power Supply By SMART 0.000% 2.952% 2.952% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
3 Kebersihan dan Keamanan Proyek Selama Masa Pelaksanaan bulan 4.00 0.000% 1.136% 1.136% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
4 Peralatan utama dan peralatan pendukung Ls 1.00 0.000% 0.741% 0.741% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%

C. PEKERJAAN STRUKTUR

C.1 PEKERJAAN STRUKTUR BAWAH

1 Pekerjaan Pemancangan Pcs 22.00


- Pemotongan Pancang Pcs 22.00 0.000% 0.162% 0.162% 5 1 minggu 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
Pile Head Treatment (PHT)
- Concrete fc' 25 Mpa m3 2.69 0.134% 0.010% 0.145% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Rebar 4 - Ø8 (Hanger) kg 58.08 0.020% 0.003% 0.024% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Rebar Ø10 - 75 (Spiral) kg 612.77 0.212% 0.036% 0.248% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Rebar 8 - D16 (Tulangan Utama) kg 520.01 0.180% 0.031% 0.211% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Rebar D16 (Ties) kg 428.24 0.148% 0.025% 0.173% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Plate 2 mm kg 36.33 0.015% 0.007% 0.022% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%

BANGUNAN UTAMA

- Excavation Soil Existing m3 688.20 0.000% 0.847% 0.847% excvt 2 unit 1 minggu 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%

2 Pekerjaan Pondasi Tipe-1 (PC 2) (2000 x 800) Pcs 8.00


- Excavation m3 62.64 0.000% 0.077% 0.077% 6 6 2 minggu 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Backfilling and Compacted m3 50.89 0.000% 0.063% 0.063% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Soil Disposal m3 11.75 0.000% 0.007% 0.007% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Compacted Sand t = 50 mm m3 0.76 0.007% 0.001% 0.008% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Lean Concrete t = 50mm m3 0.76 0.024% 0.006% 0.030% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Formwork m2 35.84 0.106% 0.057% 0.163% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Rebar D13 - 100 kg 96.65 0.033% 0.006% 0.039% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Rebar D16 - 100 kg 894.97 0.310% 0.053% 0.363% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Rebar D19 - 100 kg 1,263.16 0.437% 0.074% 0.512% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Concrete fc' 25 Mpa m3 10.24 0.512% 0.039% 0.551% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%

3 Pekerjaan Pile Cap 2 (PC 2) (2000 x 1850) Pcs 2.00


- Excavation m3 19.92 0.000% 0.025% 0.025% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Backfilling and Compacted m3 15.05 0.000% 0.019% 0.019% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Soil Disposal m3 4.87 0.000% 0.003% 0.003% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Compacted Sand t = 50 mm m3 0.30 0.003% 0.000% 0.003% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Lean Concrete t = 50mm m3 0.30 0.010% 0.002% 0.012% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Formwork m2 10.52 0.031% 0.017% 0.048% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Rebar 2 - D13 kg 15.10 0.005% 0.001% 0.006% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Rebar D16 - 100 kg 252.71 0.087% 0.015% 0.102% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Rebar D19 - 100 kg 356.67 0.123% 0.021% 0.144% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Concrete fc' 25 Mpa m3 4.27 0.213% 0.016% 0.230% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%

4 Pekerjaan Pile Cap 3 (PC 3) (1000 x 1000) Pcs 1.00


- Excavation m3 2.40 0.000% 0.003% 0.003% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Backfilling and Compacted m3 1.80 0.000% 0.002% 0.002% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Soil Disposal m3 0.60 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Cerucuk Dolken Dia 100 cm, 6 m pic 9.00 0.167% 0.042% 0.209% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Compacted Sand t = 50 mm m3 0.05 0.000% 0.000% 0.001% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Lean Concrete t = 50mm m3 0.05 0.002% 0.000% 0.002% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Formwork m2 2.00 0.006% 0.003% 0.009% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Rebar D13 - 300 kg 41.18 0.014% 0.002% 0.017% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Concrete fc' 25 Mpa m3 0.50 0.025% 0.002% 0.027% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%

5 Colom 1 (C1) (400 x 400) Pcs 10.00


- Formwork m2 68.80 0.203% 0.110% 0.313% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Rebar 12 - D22 kg 1,298.09 0.449% 0.077% 0.526% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Rebar D10 - 100 kg 331.45 0.115% 0.020% 0.134% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Concrete fc' 25 Mpa m3 3.44 0.172% 0.013% 0.185% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Grouting Ls 10.00 0.131% 0.131% 0.263% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%

6 Colom 2 (C2) (225 x 350) Pcs 1.00


- Formwork m2 4.08 0.012% 0.007% 0.019% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Rebar 6 - D16 kg 25.03 0.009% 0.001% 0.010% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Rebar D10 - 150 kg 7.99 0.003% 0.000% 0.003% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Concrete fc' 25 Mpa m3 0.13 0.007% 0.001% 0.007% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Grouting Ls 1.00 0.006% 0.002% 0.008% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%

7 Tie Beam 1 (TB1) (300 x 600) m 54.40


- Compacted Sand t = 50 mm m3 0.82 0.008% 0.001% 0.009% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Lean Concrete t = 50mm m3 0.82 0.026% 0.006% 0.032% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Formwork m2 65.28 0.192% 0.105% 0.297% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Rebar 8 - D16 kg 770.28 0.267% 0.045% 0.312% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Rebar Ø10 - 150/200 kg 433.93 0.150% 0.026% 0.176% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Concrete fc' 25 Mpa m3 9.79 0.490% 0.038% 0.527% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%

8 Tie Beam 1A (TB1A) (300 x 600) m 26.40


- Excavation m3 5.54 0.000% 0.007% 0.007% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Compacted Sand t = 50 mm m3 0.40 0.004% 0.000% 0.004% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Lean Concrete t = 50mm m3 0.40 0.013% 0.003% 0.016% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Formwork m2 31.68 0.093% 0.051% 0.144% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Rebar 8 - D16 kg 380.97 0.132% 0.022% 0.154% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Rebar Ø10 - 150/200 kg 211.15 0.073% 0.012% 0.086% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Concrete fc' 25 Mpa m3 4.75 0.238% 0.018% 0.256% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%

9 Tie Beam 2 (TB2) (250 x 400) m 16.35


- Compacted Sand t = 50 mm m3 0.20 0.002% 0.000% 0.002% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Lean Concrete t = 50mm m3 0.20 0.007% 0.002% 0.008% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Formwork m2 13.08 0.039% 0.021% 0.060% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
Page 10 of 15
- Rebar 6 - D16 kg 264.35 0.092% 0.016% 0.107% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Rebar Ø10 - 200 kg 73.23 0.025% 0.004% 0.030% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Concrete fc' 25 Mpa m3 1.64 0.082% 0.006% 0.088% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%

10 Tie Beam 3 (TB3) (250 x 400) m 26.40


- Excavation m3 4.62 0.000% 0.006% 0.006% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Compacted Sand t = 50 mm m3 0.26 0.003% 0.000% 0.003% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Lean Concrete t = 50mm m3 0.26 0.008% 0.002% 0.010% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Formwork m2 21.12 0.062% 0.034% 0.096% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Rebar 6 - D16 kg 337.87 0.117% 0.020% 0.137% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Rebar Ø10 - 200 kg 94.12 0.033% 0.006% 0.038% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Concrete fc' 25 Mpa m3 2.64 0.132% 0.010% 0.142% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%

11 Tie Beam 4 (TB4) (200 x 300) m 9.05


- Compacted Sand t = 50 mm m3 0.09 0.001% 0.000% 0.001% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Lean Concrete t = 50mm m3 0.09 0.003% 0.001% 0.004% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Formwork m2 5.43 0.016% 0.009% 0.025% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Rebar 6 - D16 kg 115.23 0.040% 0.007% 0.047% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Rebar Ø10 - 200 kg 29.00 0.010% 0.002% 0.012% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Concrete fc' 25 Mpa m3 0.54 0.027% 0.002% 0.029% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%

12 Cable Trench m 26.97


- Compacted Sand t = 50 mm m3 1.35 0.013% 0.002% 0.015% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Lean Concrete t = 50mm m3 1.35 0.043% 0.010% 0.054% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Formwork m2 29.81 0.088% 0.048% 0.136% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Wiremesh M8 - 150, 2 Layer m2 56.78 0.257% 0.052% 0.310% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Concrete fc' 25 Mpa m3 8.52 0.426% 0.033% 0.459% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- L 50x50x5 (3.77 kg/m) kg 735.89 0.302% 0.302% 0.604% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Pekerjaan Dynabolt M12-300 pic 180.00 0.220% 0.028% 0.247% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Pengecetan Rangka Baja(Cat Tebal 250 micron + Sandblast SA 2,5) m² 52.52 0.168% 0.101% 0.269% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Chequered Plate t=4.5mm m2 33.00 0.584% 0.127% 0.711% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%

13 Slab m2 151.74
- Sirtu t = 500 mm m3 66.62 0.640% 0.082% 0.722% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Wiremesh M8 - 150, 2 Layer m2 151.74 0.687% 0.140% 0.827% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Concrete fc' 25 Mpa m3 22.76 1.138% 0.088% 1.226% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%

14 Pekerjaan Selasar m2 46.33


- Sirtu t = 500 m m3 14.29 0.137% 0.018% 0.155% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Wiremesh M8 - 150, 1 Layer m2 46.33 0.105% 0.021% 0.126% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Formwork m3 26.35 0.078% 0.042% 0.120% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Concrete fc' 25 Mpa m3 6.95 0.348% 0.027% 0.374% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%

15 Pekerjaan Ramp / Tangga m2 3.96


- Sirtu t = 500 m m3 1.98 0.019% 0.002% 0.021% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Wiremesh M8 - 150, 1 Layer m2 3.96 0.009% 0.002% 0.011% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Formwork m3 5.72 0.017% 0.009% 0.026% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Concrete fc' 25 Mpa m3 0.59 0.030% 0.002% 0.032% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%

16 Paving Block (EL. -0.550) m2 70.62


- Backfilling and Compacted m3 14.12 Estimasi 20 cm 0.000% 0.017% 0.017% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Compacted Sand t = 50 mm m3 3.53 0.034% 0.004% 0.038% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Paving Block Light Duty 8 cm m2 70.62 0.413% 0.130% 0.543% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Bak Kontrol 1000x100 Unit 3.00 0.506% 0.099% 0.605% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%

17 Pekerjaan Pondasi Trafo m2 9.00


- Rebar D16 - 200 m2 119.21 0.041% 0.007% 0.048% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Concrete fc' 25 Mpa m3 2.25 0.113% 0.009% 0.121% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Steel Gratings Hot Dip Galvanized 25x5 / 30x100 m2 5.36 0.289% 0.038% 0.326% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%

C.2 PEKERJAAN STRUKTUR BAJA

BANGUNAN UTAMA

1 Kolom rencana HB 300x300x10x15 (K1)


- HB 300x300x10x15 (94 kg/m)) kg 6,094.49 2.735% 1.172% 3.907% 5 4 crane 1 unit 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- End Plate 15 mm kg 129.82 0.053% 0.025% 0.078% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Base Plate 15 mm + Stiffner 10 mm kg 302.91 0.124% 0.058% 0.183% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Anchor Bolt 6-M24, L = 850 pic 60.00 0.512% 0.102% 0.615% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Pengecetan Rangka Baja(Cat Tebal 250 micron + Sandblast SA 2,5) m2 109.62 0.351% 0.211% 0.562% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%

2 Kolom rencana WF 250x125x6x9 (K2)


- WF 250x125x6x9 (29.6 kg/m)) kg 1,826.59 0.749% 0.351% 1.101% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Base Plate 15 mm kg 336.57 0.138% 0.065% 0.203% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Base Plate 10 mm + Stiffner 10 mm kg 6.32 0.003% 0.001% 0.004% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- HTB 2X3-M22 pic 66.00 0.049% 0.010% 0.059% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Anchor Bolt 6-M16 L=640 pic 6.00 0.027% 0.005% 0.032% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Pengecetan Rangka Baja(Cat Tebal 250 micron + Sandblast SA 2,5) m2 53.71 0.172% 0.103% 0.275% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%

3 Balok rencana WF 350x175x7x11 (B1)


- WF 350x175x7x11 (49.6 kg/m) kg 429.14 0.193% 0.083% 0.275% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Connection Plate 12 mm kg 22.09 0.009% 0.004% 0.013% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Stiffner Plate 10 mm kg 60.80 0.025% 0.012% 0.037% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- HTB 2X6-M16 pic 24.00 0.013% 0.004% 0.017% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Pengecetan Rangka Baja(Cat Tebal 250 micron + Sandblast SA 2,5) m2 13.12 0.042% 0.025% 0.067% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%

4 Balok rencana WF 300x150x6.5x9 (B2)


- WF 300x150x6.5x9 (36.7 kg/m) kg 4,161.44 1.867% 0.800% 2.668% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Connection Plate 10 mm kg 81.95 0.034% 0.016% 0.049% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Stiffner Plate 10 mm kg 169.56 0.070% 0.033% 0.102% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Stiffner Plate 8 mm kg 42.39 0.017% 0.008% 0.026% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- HTB 2X6-M16 pic 288.00 0.157% 0.044% 0.201% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Pengecetan Rangka Baja(Cat Tebal 250 micron + Sandblast SA 2,5) m2 139.95 0.449% 0.269% 0.718% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%

5 Balok rencana WF 200x100x5.5x8 (B3)


- WF 200x100x5.5x8 (21.3 kg/m) kg 2,349.11 0.964% 0.452% 1.415% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Connection Plate 8 mm kg 112.07 0.046% 0.022% 0.068% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- HTB 2X3-M16 pic 306.00 0.166% 0.047% 0.213% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Pengecetan Rangka Baja(Cat Tebal 250 micron + Sandblast SA 2,5) m2 90.01 0.289% 0.173% 0.462% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%

6 Lantai 2 (Thk 150 mm) EL. +6.950 m2 148.50


- Bondek, Thk : 0.75 mm m2 148.50 0.876% 0.238% 1.114% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Sheer Connector 2xD13-200 kg 194.80 0.080% 0.037% 0.117% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Wiremesh M8-150, 2 Layer m2 148.50 0.672% 0.137% 0.810% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Lantai Beton m3 22.28 1.114% 0.086% 1.199% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%

7 Balok atap WF 250x125x6x9 (B8)


- WF 250x125x6x9 (29.6 kg/m) kg 1,511.08 0.620% 0.291% 0.911% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Connection Plate 10 mm kg 75.36 0.031% 0.014% 0.045% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Stiffner Plate 8 mm kg 61.54 0.025% 0.012% 0.037% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- HTB 2X5-M16 pic 160.00 0.087% 0.025% 0.112% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Pengecetan Rangka Baja(Cat Tebal 250 micron + Sandblast SA 2,5) m2 52.99 0.170% 0.102% 0.272% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%

8 Rafter atap WF 250x125x6x9 (R1)


- WF 250x125x6x9 (29.6 kg/m) kg 1,909.70 0.783% 0.367% 1.151% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Connection Plate 10 mm kg 108.33 0.044% 0.021% 0.065% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%

Page 11 of 15
- Stiffner Plate 8 mm kg 88.47 0.036% 0.017% 0.053% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- HTB 2X5-M16 pic 224.00 0.122% 0.034% 0.156% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Pengecetan Rangka Baja(Cat Tebal 250 micron + Sandblast SA 2,5) m2 67.31 0.216% 0.129% 0.345% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%

Page 12 of 15
9 Atap Bangunan Utama EL. +12.085
- Gording CNP 150x50x2.3 (4.96 kg/m) kg 1,308.55 0.537% 0.252% 0.788% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Ikatan Angin D16 kg 121.66 0.050% 0.023% 0.073% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Sagrod Ø12 kg 70.76 0.029% 0.014% 0.043% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Pengecetan Rangka Baja(Cat Tebal 250 micron + Sandblast SA 2,5) m2 131.91 0.423% 0.254% 0.676% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Atap Lysaght Trimdek Optima Colorbond XRW 0.4 BMT m² 265.67 1.260% 0.204% 1.465% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%

10 Talang (uk 550 x 320)


- UNP 150x75x6.5 (18.6 kg/m) kg 723.95 0.297% 0.139% 0.436% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- L 50x50x5 @500 (3.77 kg/m) kg 385.24 0.158% 0.074% 0.232% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Zincalum t=1.5mm m² 49.20 0.233% 0.038% 0.271% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Down Pipe 4" D L=12.905 (8 Unit) Connect to Bak Kontrol Titik 8.00 PVC D 0.283% 0.088% 0.371% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Roofdrain 4" SS Pcs 8.00 0.113% 0.023% 0.135% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%

TANGGA

1 Balok rencana WF 200x100x5.5x8 (B3) (Bordes)


- WF 200x100x5.5x8 (21.3 kg/m) kg 137.39 0.056% 0.026% 0.083% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Connection Plate 8 mm kg 3.24 0.001% 0.001% 0.002% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- HTB 2X3-M16 pic 12.00 0.007% 0.002% 0.008% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Pengecetan Rangka Baja(Cat Tebal 250 micron + Sandblast SA 2,5) m2 5.21 0.017% 0.010% 0.027% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%

2 Balok Tangga UNP 150x75x6.5


- UNP 150x75x6.5 (18.6 kg/m) kg 792.27 0.325% 0.152% 0.477% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Base Plate 8 mm kg 3.14 0.001% 0.001% 0.002% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Dynabolt M16-1x2 pic 4.00 0.002% 0.001% 0.003% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Pengecetan Rangka Baja(Cat Tebal 250 micron + Sandblast SA 2,5) m2 22.37 0.072% 0.043% 0.115% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%

3 Anak tangga dan handrail


- Chequared Plate t=4.5mm (31 pic) Anak Tang m2 28.85 0.510% 0.111% 0.621% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- L 50x50x5 (3.77 kg/m) kg 368.14 0.151% 0.071% 0.222% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Handrail Pipe 1 1/2" m 68.83 Pipa Medium 0.164% 0.079% 0.244% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Handrail Pipe 1" m 34.83 Pipa Medium 0.052% 0.027% 0.079% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Pengecetan Rangka Baja(Cat Tebal 250 micron + Sandblast SA 2,5) m2 19.53 0.063% 0.038% 0.100% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%

BRIDGE

1 Struktur Piperack
- Balok B5 UNP 150x75x6.5 (18.6 kg/m) kg 1,215.51 0.499% 0.234% 0.732% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Kolom K3 UNP 150x75x6.5 (18.6 kg/m) kg 638.35 0.262% 0.123% 0.385% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Support S1 UNP 150x75x6.5 (18.6 kg/m) kg 689.28 0.283% 0.133% 0.415% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Pengecetan Rangka Baja(Cat Tebal 250 micron + Sandblast SA 2,5) m2 82.04 0.263% 0.158% 0.421% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%

2 Struktur Walkway
- Balok B5 UNP 150x75x6.5 (18.6 kg/m) kg 385.02 0.158% 0.074% 0.232% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Balok B6 WF 200x100x5.5x8 (21.3 kg/m) kg 911.68 0.374% 0.175% 0.549% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Balok B7 WF 250x125x6x9 (29.6 kg/m) kg 116.92 0.048% 0.022% 0.070% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Pengaku S2 L 50x50x5 (3.77 kg/m) kg 68.54 0.028% 0.013% 0.041% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Pengecetan Rangka Baja(Cat Tebal 250 micron + Sandblast SA 2,5) m2 54.25 0.174% 0.104% 0.278% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%

- Chequered Plate t=4.5mm m2 26.56 0.470% 0.102% 0.572% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Handrail Pipe 1 1/2" m 67.47 Pipa Medium 0.161% 0.078% 0.239% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Handrail Pipe 1" m 41.47 Pipa Medium 0.062% 0.032% 0.094% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%

3 Struktur Atap Walkway


- Kolom K3 UNP 150x75x6.5 (18.6 kg/m) kg 900.05 0.369% 0.173% 0.542% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Balok B5 UNP 150x75x6.5 (18.6 kg/m) kg 779.56 0.320% 0.150% 0.470% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Rafter R2 UNP 150x75x6.5 (18.6 kg/m) kg 619.11 0.254% 0.119% 0.373% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Pengecetan Rangka Baja(Cat Tebal 250 micron + Sandblast SA 2,5) m2 74.15 0.238% 0.143% 0.380% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%

4 Atap Bridge
- Gording CNP 150x50x2.3 (4.96 kg/m) kg 335.42 0.138% 0.065% 0.202% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Ikatan Angin D16 kg 58.94 0.024% 0.011% 0.036% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Sagrod Ø12 kg 18.69 0.008% 0.004% 0.011% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Pengecetan Rangka Baja(Cat Tebal 250 micron + Sandblast SA 2,5) m2 33.81 0.108% 0.065% 0.173% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Atap Lysaght Trimdek Optima Colorbond XRW 0.4 BMT m² 50.63 0.240% 0.039% 0.279% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%

D. PEKERJAAN ARSITEKTUR

EL. ±0.00

1 Pekerjaan Dinding dan Finishing


- Pas. Bata Ringan + kolom dan balok praktis m2 514.34 bata merah 1.714% 0.890% 2.605% 5 4 dumptruck 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Plesteran + Acian m2 1,028.68 0.528% 0.923% 1.451% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Cat Exterior Wheathershield m2 514.34 0.462% 0.264% 0.725% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Cat Interior Enamel m2 514.34 0.396% 0.264% 0.659% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%

2 Pekerjaan Pintu dan Jendela


- Rolling Door Manual Type unit 2.00 1.123% 0.169% 1.292% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Pintu Tipe-2 unit 3.00 2.615% 0.392% 3.008% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Lover Tipe-2 unit 8.00 1.190% 0.178% 1.368% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Wall Exhausfan type Industrial Cap. 2500CFM unit 9.00 exclude instalasi elektrikal 1.413% 0.212% 1.626% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%

3 Pekerjaan Lantai
- Homogenous Tile unpolish 600x600mm m2 93.79 plinth -deleted 0.842% 0.156% 0.998% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%

EL. +7.000

1 Pekerjaan Dinding dan Finishing


- Pas. Bata Ringan + kolom dan balok praktis m2 348.80 bata merah 1.163% 0.604% 1.766% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Plesteran + Acian m2 697.60 0.358% 0.626% 0.984% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Cat Exterior Wheathershield m2 348.80 0.313% 0.179% 0.492% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Cat Interior Enamel m2 348.80 0.268% 0.179% 0.447% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%

2 Pekerjaan Pintu dan Jendela


- Pintu Tipe-1 unit 2.00 0.831% 0.125% 0.955% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
- Jendela Tipe-1 unit 9.00 2.931% 0.441% 3.372% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%

3 Pekerjaan Lantai
- Homogenous Tile unpolish 600x600mm m2 148.50 plinth -deleted 1.333% 0.248% 1.580% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%

4 Gypsum Board Ceiling El +10.300


- Gypsum Board Ceiling,t=9mm + Metal Framing m² 176.00 0.790% 0.338% 1.128% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%

E. HEAVY EQUIPMENT Ls 1 0.000% 9.692% 9.692% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%

TOTAL Bangunan TM Ex Pre Treatment Ls 1 54.702% 45.298% 100.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%

Page 13 of 15
PROYEK : BIODIESE
LOKASI : TARJUN
PEMBERI TUGAS : PT. SMART Tbk
TAHUN : 2021
BUILDING : BANGUNAN TEGANGAN MENENGAH
DOKUMENTASI PEKERJAAN
Fit uP bridge structure Instal wiremesh

Instal dinding bata bangunan TM Progress bangunan TM

Instal wall brick bangunan TM Erection jembatan banguna TM


PROYEK : BIODIESE
LOKASI : TARJUN
PEMBERI TUGAS : PT. SMART Tbk
TAHUN : 2021
BUILDING : BANGUNAN TEGANGAN MENENGAH
DOKUMENTASI PEKERJAAN