Professional Documents
Culture Documents
GROUP WORK
Instructor:
Hoang Hue Chi, PhD
Ha Noi, 2022
1
Acknowledgement
We would like to express our heartfelt thanks of gratitude to our
instructor, Dr. Hoang Hue Chi, who assisted us during our working term,
and especially gave us the knowledge and advice to finish this study
report with ease. However, Despite the significant efforts of all members,
mistakes are inevitable in the process. As a result, we would love to
receive your comments and feedback on the report. Your evaluation is an
honor for us so that we can strive to improve our skills and complete this
report flawlessly.
Thank you very much for your guidance!
TEAM MEMBERS
06
2
TABLE OF CONTENTS
Acknowledgement ....................................................................................... 2
I) Work summarize .................................................................................... 4
II) Main contents:......................................................................................... 4
1) Enquiry ................................................................................................. 4
2) Offer ...................................................................................................... 4
3) Order..................................................................................................... 6
4) Acknowlegde order .............................................................................. 6
5) Complaint ............................................................................................. 7
3
I) Work summarize
Buyer: SY Company in Vietnam
Seller: Mitsubishi Group in Japan
Commodity: Air conditioner model A.123
Quantity: 100 units Price: 400$/unit, CIF Haiphong Port
Packing: as usual export customary packing
Delivery: one shipment in one lot, date 30/11/2022
Payment: in USD, seller's bank: MUFG Bank in Tokyo; buyer's bank:
Vietcombank in Hanoi
Complaint: lack of 5 machines and 3 machines are broken
5
3) Order
Dear Mr Son,
We thank you for your offer No.1231 of 23 February for air conditioner
and are pleased to enclose our order No.PO/35 for 100 air conditioners,
code A.123 as per catalog and price list enclosed with your offer. We
would like to draw your attention to the following points:
If any of the ordered goods are not available in stock for delivery at the
time stated in the
order, please do not send substitutes for them.
We hope that this order will be completed to our satisfaction and look
forward to receiving your sales confirmation soon.
Yours sincerely
(Signed)
General Director
4) Acknowlegde order
Dear Mr Son,
We would like to take this opportunity to thank you for your recent order
for 100 Air conditioners model A.123, placed on October 2, 2022, order
No.PO/35.
6
Please note that your order is being processed and will be shipped to you
on November 30, 2022, at CIF Hai Phong Port
We will keep you updated on the status of your item during shipping.
Best regards
Yours sincerely,
(signed)
General Director
5) Complaint
Dear Sir,
Out of 100 air-conditioners ordered and also stated in the packing list, only
95 were delivered, 5 were missing.
7
We enclose herewith the Survey report and other relevant documents to
support our complaint and must ask you to immediately send the
replacements for the broken and missing air-conditioners with all the
expenses to your account as we urgently need them to complete our sales
to our local customers. These items must be delivered before 7 December,
after that time we will reserve the right to refuse to take delivery of them
and you will have to pay a penalty which is double the value of the goods.
Yours sincerely
(Signed)
General Director