This document provides a cost estimate for materials for a project to adjust pumps at a gas client's Rokan facility. It includes 31 items such as pipes, flanges, elbows, reducers, valves, and other fittings. The total estimated cost is Rp 211,875,489.
This document provides a cost estimate for materials for a project to adjust pumps at a gas client's Rokan facility. It includes 31 items such as pipes, flanges, elbows, reducers, valves, and other fittings. The total estimated cost is Rp 211,875,489.
This document provides a cost estimate for materials for a project to adjust pumps at a gas client's Rokan facility. It includes 31 items such as pipes, flanges, elbows, reducers, valves, and other fittings. The total estimated cost is Rp 211,875,489.
Client : PT Pertamina Gas Harga Perhitungan Sendiri (HPS)
Owner Estimate (OE)
Unit Price Total
NO ITEM Qty UoM (IDR) (IDR) 1 2" PIPE SMLS CS BE SCH.80 API 5L GR.B, ASME B36.10 2 M Rp 517.500 Rp 1.035.000 2 6" PIPE SMLS CS BE SCH.40 API 5L GR.B, ASME B36.10 6 M Rp 1.822.060 Rp 10.932.360 3 12" FLANGE 150# RFWN BW SCH. 20 A105, ASME B16.5 2 EA Rp 4.858.750 Rp 9.717.500 4 8" FLANGE 300# RFWN BW SCH. 40 A105, ASME B16.5 1 EA Rp 2.932.500 Rp 2.932.500 5 2" FLANGE 300# RFWN BW SCH. 80 A105, ASME B16.5 4 EA Rp 321.770 Rp 1.287.080 6 6" FLANGE 300# RFWN BW SCH. 40 A105, ASME B16.5 4 EA Rp 887.800 Rp 3.551.200 7 12"x6" REDUCER TEE BW CS SCH. 20 x 40 A 234 WPB, ASME B16.9 1 EA Rp 7.812.272 Rp 7.812.272 8 6" ELBOW 90 DEG LR BW CS SCH. 40 A 234 WPB, ASME B16.9 4 EA Rp 1.625.065 Rp 6.500.260 9 6" ELBOW 45 DEG BW CS SCH. 40 A 234 WPB, ASME B16.9 1 EA Rp 1.078.700 Rp 1.078.700 10 2" ELBOW 90 DEG LR BW CS SCH. 80 A 234 WPB, ASME B16.9 2 EA Rp 169.280 Rp 338.560 11 8"X6" CONC. RED BW CS SCH.40 X SCH.40 A 234 WPB, ASME B16.9 1 EA Rp 2.518.040 Rp 2.518.040 12 3"X2" CONC. RED BW CS SCH.40 X SCH.80 A 234 WPB, ASME B16.9 4 EA Rp 264.040 Rp 1.056.160 13 6"X3" CONC. RED BW CS SCH.40 X SCH.40 A 234 WPB, ASME B16.9 4 EA Rp 1.482.235 Rp 5.928.940 14 12"-150# BLIND FLANGE RF A 105, ASME B16.5 1 EA Rp 3.786.835 Rp 3.786.835 15 6" x 3/4" 6000# SOCKOLET CS A 105 5 EA Rp 529.230 Rp 2.646.150 16 6" x 3/4" 6000# Thradolet thr'd CS A 105 1 EA Rp 529.230 Rp 529.230 17 3/4"-6000# HEX HEAD PLUG A-105 THR'D 1 EA Rp 188.600 Rp 188.600 GASKET 12"- 150# SPWD METALIC GRAPHITE FILLER 316 L WINDING NO INNER RING, CS CENT. 18 2 EA Rp 1.193.010 Rp 2.386.020 RING ASME B16.20 GASKET 8"-#300 SPWD METALIC GRAPHITE FILLER 316 L WINDING NO INNER RING, CS CENT. 19 1 EA Rp 917.700 Rp 917.700 RING ASME B16.20 GASKET 2"- #300 RF SPIRAL WOUND GRAPHITE FILLED 4.4MM THK NO INNER/OUTER RINGS 20 6 EA Rp 259.900 Rp 1.559.400 SS316L ASME B16.20 GASKET 6"-#300 SPWD METALIC GRAPHITE FILLER 316 L WINDING NO INNER RING, CS CENT. 21 6 EA Rp 747.500 Rp 4.485.000 RING ASME B16.20 STUDBOLT A 193 GR.B7 & HEAVY NUTS A194 GR. 2H C/W WASHER FLUOROCARBON 22 32 EA Rp 195.500 Rp 6.256.000 COATED,ASME B18.2.1/B18.2.2 (for 12"-150#) 7/8"x125mm STUDBOLT A 193 GR.B7 & HEAVY NUTS A194 GR. 2H C/W WASHER FLUOROCARBON 23 12 EA Rp 195.500 Rp 2.346.000 COATED,ASME B18.2.1/B18.2.2 (for 8"-300#) 7/8"x145mm STUDBOLT A 193 GR.B7 & HEAVY NUTS A194 GR. 2H C/W WASHER FLUOROCARBON 24 24 EA Rp 114.343 Rp 2.744.240 COATED,ASME B18.2.1/B18.2.2 for (6"-300#) 3/4"x120mm STUDBOLT A 193 GR.B7 & HEAVY NUTS A194 GR. 2H C/W WASHER FLUOROCARBON 25 32 EA Rp 114.343 Rp 3.658.987 COATED,ASME B18.2.1/B18.2.2 for (2"-300#) 3/4"x115mm STUDBOLT A 193 GR.B7 & HEAVY NUTS A194 GR. 2H C/W WASHER FLUOROCARBON 26 24 EA Rp 195.500 Rp 4.692.000 COATED,ASME B18.2.1/B18.2.2 for ( 10"-150#) 7/8"x120mm 27 RO-001 /002 2 EA Rp 9.200.000 Rp 18.400.000 28 PI-001 & PI-002 4 EA Rp 9.288.939 Rp 37.155.755 29 2" GLOBE VALVE 300# A 216 WCB OR 105 WNRF AS PER DATA SHEET 2 EA Rp 8.395.000 Rp 16.790.000 30 10" CHECK VALVE 150# A 216 WCB OR 105 WNRF AS PER DATA SHEET 1 EA Rp 39.445.000 Rp 39.445.000 3/4" GATE VALVE 800#, A105 BODY & BONNET, ASTM A182-F6A + 11.5-13.5% Cr TRIM, API 602 31 DESIGN, SW c/w A106B Sch.160 NIPPLE 100MM x NPTF, REFER TO DOC. PMRK-PPR-00-PIP-DTS- 5 EA Rp 1.840.000 Rp 9.200.000 002 DATA SHEET FOR MANUAL VALVE Total Rp 211.875.489
Jakarta, 15 November 2022 Jakarta, 15 November 2022