ENVIRONMENT MANAGEMENT Rev.0 AT RAJASTHAN REFINERY PROJECT SITES Page 77 of 96
FORMAT NO. : HSE-7 REV 0
CONFINED SPACE ENTRY PERMIT
Project site ___________________________ Sr. No. _________________________ Name of the work ______________________ Date ___________________________ Name of Contractor ____________________ Nature of work ___________________ Exact location of work _____________
Safety Requirements POSITIVE ISOLATION OF THE VESSEL IS MANDATORY
(A) Has the equipment been? Y NR Y NR Y NR Isolated from water flushed &/or radiation sources power/steam/air steamed removed isolated from liquid or Man ways open & proper lighting gases ventilated provided depressurized &/or cont. inert gas flow drained arranged blanked/ blinded/ adequately cooled disconnected (B) Expected Residual Hazards lack of O 2 combustible gas/ liquid H 2 S / toxic gases corrosive chemicals pyrophoric iron / scales electricity / static heat/ steam / frost high humidity ionizing radiation
(C) Protection Measures
gloves ear plug / muff goggles / face shield protective clothing dust / gas / air line mask personal gas alarm grounded air duct/blower attendant with SCBA/air rescue /AC mask equipment/team Fire fighting arrangements safety harness & lifeline communication equipment
Authorization / Renewal (It is safe to enter the confined space)
Signature Time Signature No. of Contractor's Contractor's Review From To Workman Name of persons persons Supervisor Safety by EIL allowed allowed Officer Field Engineer
Permit Closure : (A) Entry was closed stopped will continue on ...
(B) Site left in a safe condition Housekeeping done
(C)Multilock removed key transferred
Ensured all men have come out Man-ways barricaded
Remarks, if any:
Format No. 8-00-0001-F1 Rev. 0 Copyright EIL – All rights reserved